Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping4 January 2021Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel PipingNondestructive Examination
ML19301A50513 August 2019JAF-CALC-NBI-00205 Setpoint Calculation for Vessel Lo-Lo Lvl Primary Containment Isolation Function (02-3LT-57A,B and 02-3STU-258A,B)Safe Shutdown
Reactor Vessel Water Level
Earthquake
JAFP-17-0085, High Frequency Confirmation Report for March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1, Seismic30 August 2017High Frequency Confirmation Report for March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1, SeismicProbabilistic Risk Assessment
Emergency Lighting
Fukushima Dai-Ichi
Earthquake
JAFP-17-0078, Focused Evaluation Summary Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident27 July 2017Focused Evaluation Summary Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentHydrostatic
Fukushima Dai-Ichi
Flooding Focused Evaluation
JAFP-17-0054, James a FitzPatrick - Submittal of Stress Analysis Summary for the 24-10-130 Weld Overlay25 May 2017James a FitzPatrick - Submittal of Stress Analysis Summary for the 24-10-130 Weld OverlayWeld Overlay
Nondestructive Examination
Dissimilar Metal Weld
JAFP-15-0036, J.A. Fitzpatrick Flood Hazard Reevaluation Report - Response to NRC Request for Information Per 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fuskushima Dai-12 March 2015J.A. Fitzpatrick Flood Hazard Reevaluation Report - Response to NRC Request for Information Per 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fuskushima Dai-ichiSafe Shutdown
High winds
Hydrostatic
FLEX
Fukushima Dai-Ichi
Earthquake
ML15007A1507 January 2015Seismic Walkdown Report Update - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident.Safe Shutdown
Fire Barrier
Squib
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Scaffolding
Weak link
JAFP-15-0007, Seismic Walkdown Report Update - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid7 January 2015Seismic Walkdown Report Update - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident.Safe Shutdown
Unanalyzed Condition
Fire Barrier
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Multiple Spurious Operation
Locked High Radiation Area
Finite Element Analysis
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Scaffolding
ML14176A96124 June 2014Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014Fire Barrier
Coatings
Foreign Material Exclusion
ML14007A68121 February 2014Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Frazil ice
Battery sizing
Earthquake
Hardened vent
ML14043A42815 February 2014Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for James A. FitzPatrick Nuclear Power Plant, TAC Nos.: MF1077Safe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Frazil ice
Battery sizing
Earthquake
Hardened vent
JAFP-13-0035, Response to Request for Additional Information on Core for Plate Rim Hold Down Bolting, Plant Specific Analysis and Inspection Plan, License Renewal Commitment 2317 April 2013Response to Request for Additional Information on Core for Plate Rim Hold Down Bolting, Plant Specific Analysis and Inspection Plan, License Renewal Commitment #23Finite Element Analysis
License Renewal
Earthquake
Loctite
Flow Induced Vibration
Power Uprate
Affidavit
ML12342A14027 November 2012Seismic Walkdown Report, Response to NRC Request for Information Per 10 CFR 50.54 (F) Re the Seismic Aspect of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentSafe Shutdown
Unanalyzed Condition
Fire Barrier
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Multiple Spurious Operation
Locked High Radiation Area
Finite Element Analysis
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Scaffolding
JAFP-12-0134, FitzPatrick - Seismic Walkdown Report, Response to NRC Request for Information Per 10 CFR 50.54 (F) Re the Seismic Aspect of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident27 November 2012FitzPatrick - Seismic Walkdown Report, Response to NRC Request for Information Per 10 CFR 50.54 (F) Re the Seismic Aspect of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentSafe Shutdown
Unanalyzed Condition
Fire Barrier
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Multiple Spurious Operation
Locked High Radiation Area
Finite Element Analysis
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Scaffolding
ML12342A13921 November 2012Engineering Report JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 1 of 3, Attachment C, Pages 74 Through 573Squib
Scaffolding
ML12342A13821 November 2012Engineering Report, JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 1 of 3Safe Shutdown
Unanalyzed Condition
Fire Barrier
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Squib
Multiple Spurious Operation
Locked High Radiation Area
Finite Element Analysis
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Scaffolding
JAFP-12-0134, Engineering Report JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 2 of 3, Attachment C, Pages 283 Through 57321 November 2012Engineering Report JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 2 of 3, Attachment C, Pages 283 Through 573
JAFP-12-0134, Engineering Report JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 1 of 3, Attachment C, Pages 74 Through 57321 November 2012Engineering Report JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 1 of 3, Attachment C, Pages 74 Through 573Squib
Scaffolding
JAFP-12-0134, Engineering Report, JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 1 of 321 November 2012Engineering Report, JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 1 of 3Safe Shutdown
Unanalyzed Condition
Fire Barrier
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Squib
Multiple Spurious Operation
Locked High Radiation Area
Finite Element Analysis
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Scaffolding
ML12342A14221 November 2012Engineering Report JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 2 of 3, Attachment C, Pages 551 Through 573Safe Shutdown
Design basis earthquake
Scaffolding
Weak link
ML13163A26618 May 2012from Bhalchandra Vaidya to Samson Lee: G20120172, 2.206 PetitionContainment Hardened Vent
Backfit
ML1024601002 September 2010Enclosure 2, RA-ENO-EP1-10-135, Response to NRC Supplemental RAIs 1, 4, 5, and 6 for James a FitzPatrick Cycle 20 SLMCPR SubmittalMinimum Critical Power Ratio
JAFP-08-0131, Enclosure 2, Structural Integrity Associates, Inc. Calculation 0800769.311 Crack Growth Analysis for Recirculation Inlet Nozzle N-2C4 December 2008Enclosure 2, Structural Integrity Associates, Inc. Calculation 0800769.311 Crack Growth Analysis for Recirculation Inlet Nozzle N-2CWeld Overlay
Dissimilar Metal Weld
ML0835903394 December 2008Enclosure 2, Structural Integrity Associates, Inc. Calculation 0800769.311 Crack Growth Analysis for Recirculation Inlet Nozzle N-2CWeld Overlay
Dissimilar Metal Weld
JAFP-08-0131, Enclosure 3, Structural Integrity Associates, Inc. Calculation 0800769.316 Reconciliation of Recirculation Inlet N2 Nozzle-to-Safe End Weld Overlay Repair with Nozzle Stress Report3 December 2008Enclosure 3, Structural Integrity Associates, Inc. Calculation 0800769.316 Reconciliation of Recirculation Inlet N2 Nozzle-to-Safe End Weld Overlay Repair with Nozzle Stress ReportWeld Overlay
Finite Element Analysis
Dissimilar Metal Weld
ML0821900137 August 2008Monthly Operating Reports Second Quarter 2008Reserve Station Service Transformer
Power change
ML08210045831 July 2008BWR Vessels and Internals Project, Lntegrated Surveillance Program (ISP) Data for FitzPatrick (Excerpted from BWRVIP-135, Revision 1)
JAFP-08-0067, BWR Vessels and Internals Project, Lntegrated Surveillance Program (ISP) Data for FitzPatrick (Excerpted from BWRVIP-135, Revision 1)31 July 2008BWR Vessels and Internals Project, Lntegrated Surveillance Program (ISP) Data for FitzPatrick (Excerpted from BWRVIP-135, Revision 1)
JAFP-07-0125, ENT-FLU-002-R-005, Rev 0, James A. FitzPatrick, License Renewal Application - Amendment 14, Fluence Calculation, Non-Proprietary Version31 October 2007ENT-FLU-002-R-005, Rev 0, James A. FitzPatrick, License Renewal Application - Amendment 14, Fluence Calculation, Non-Proprietary Version
ML07324002510 August 2007Federal Consistency Overview
ML0713504335 April 2007JAF-RPT-05-AMM30, Rev 4, Draft, Aging Management Review of Nonsafety-Related Systems and Components Affecting Safety-Related Systems, (FitzPatrick)Safe Shutdown
Aging Management
Abnormal operational transient
Earthquake
ML07052066120 February 2007E-mail from Entergy to T. Le & Document - GE-NE-B1100732-01, Rev. 1, Final Report, Class II, February 1998 Plant FitzPatrick RPV Surveillance Materials Testing and Analysis of 120 Degree Capsule at 13.4 EFPYShutdown Margin
Anticipated operational occurrence
Hydrostatic
Finite Element Analysis
ML07016056916 January 2007JAFNPP - SEIS Web Reference - Mills 2003: Status of the Lake Ontario Food Web in a Changing EcosystemZebra Mussel
Veliger
ML07012030427 December 2006JAFNPP - SEIS Web References - Chppm Noise Levels of Army Equipments
ML06039037230 September 2005NEDO-33087, Rev. 1, J.A. Fitzpatrick Nuclear Power Plant Aprm/Rbm/Technical Specifications/Maximum Extended Operating Domain (Arts/Meod).Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Feedwater Controller Failure
MELLLA
Fuel cladding
Flow Induced Vibration
ML07016021431 July 2005JAFNPP - SEIS Web Reference - Mills Et Al 2005Zebra Mussel
Veliger
JAFP-05-0118, Request for Exemption from 10 CFR 50, Appendix R, III.G.2.c Requirement for a One-Hour Rated Fire Barrier Wrap27 July 2005Request for Exemption from 10 CFR 50, Appendix R, III.G.2.c Requirement for a One-Hour Rated Fire Barrier WrapSafe Shutdown
Fire Barrier
Hemyc
Exemption Request
Fire Protection Program
Fire Watch
ML07011034030 June 2005EPA Shooting Range Bmps - JAFNPP SEIS Reference
BVY 04-088, Fitness-for-Duty Program Performance Report for the Period January - June 200430 August 2004Fitness-for-Duty Program Performance Report for the Period January - June 2004Fitness for Duty
JAFP-03-0065, Summary of Plant Changes, Tests, & Experiments for 2001/2002 as Required by 10 CFR 50.59 & 10 CFR 72.48, & Summary of Commitment Changes for 2001/200212 May 2003Summary of Plant Changes, Tests, & Experiments for 2001/2002 as Required by 10 CFR 50.59 & 10 CFR 72.48, & Summary of Commitment Changes for 2001/2002Safe Shutdown
Unanalyzed Condition
Non-Destructive Examination
Post Accident Monitoring
Temporary Modification
Code Reconciliation
Control of Heavy Loads
Fuel cladding
EVT-1
Liquid penetrant
Fire Protection Program
Early Warning Fire Detection
JAFP-03-0052, 2002 Personnel Radiation Exposure Summary Report15 April 20032002 Personnel Radiation Exposure Summary Report
ML03052026915 February 2003Follow-up Report, Reference Event #39516
ML06362021431 March 2002JAFNPP Er Ref 8-15 DOE Eia International Energy Outlook 2002Chernobyl
ML0732012261 January 2001Onondago Reservation Census Population
NRC Generic Letter 1979-4525 September 1979NRC Generic Letter 1979-045: Transmittal of Reports Regarding Foreign Reactor Operation ExperiencesBoric Acid
ML17037C26623 January 1976Letter Regarding a Report Entitled 1974 Nine Mile Point Aquatic Ecology Studies.