Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24017A05517 January 2024Cimarron Environmental Response Trust Burial Area 1 Redox Evaluation Report
ML22285A14412 October 2022Burns & Mcdonnell - 008 D Plan Rev 3 App B SWP3 and General Permit Part 2
ML22308A1837 October 2022Cimarron - D Plan Rev - 3 Appendix L - Groundwater Flow Model Report
ML22286A2447 October 2022Facility Decommissioning Plan, Rev 3: Appendix N - Criticality and Uranium Loading CalculationsHigh winds
Earthquake
ML22286A2357 October 2022Basis of Design for Groundwater Remediation
ML22286A2277 October 2022Cimarron Environmental Response Trust - Groundwater Flow Model Report Cimarron Remediation Site
ML22286A2301 October 2022Cimarron Environmental Response Trust - RPP-001, Rev. 5, Radiation Protection PlanHigh Radiation Area
Deep Dose Equivalent
Chernobyl
Stolen
ML22273A08322 September 2022Determination of Conservative U-235 Enrichment Levels for Treatment Trains at Cimarron Site
ML23279A14420 September 2022Enclosure 2 - Area of Potential Disturbance; Enclosure Divider Pages
ML22271A63313 September 2022Uranium Activity Vs. Mass Concentration
ML22265A2109 September 2022Enercon Services, Inc. - Determination of Conservative U-235 Enrichment Levels for Treatment Trains at Cimarron Site
ML22259A0859 September 2022Cimarron Decommissioning Project - Determination of Conservative U-235 Enrichment Level for Treatment Trains at Cimarron Site
ML22122A2352 May 2022Cimarron Environmental Response Trust - Uranium Daughters in Groundwater
ML23083B82630 September 2020Phase I Cultural Resources Survey of the Cimarron Environmental Response Trust Property, Logan County, Oklahoma
ML20225A07013 August 2020State Historic Preservation Office Forms for Cimarron Site Cultural Resource Survey Us Nuclear Regulatory Commission Docket No. 70-925; License No. SNM-928
ML20070L12810 March 2020Environmental Properties Management, LLC - Revised Evaluation of the Need to License Tc-99
ML21119A06919 February 2019Preliminary Seismic Analysis of Buried Hdpe Piping, Cimarron Environmental Response Trust, Revision aHydrostatic
Earthquake
ML22285A13526 January 2017Geotechnical Engineering Report, Cimarron Water Treatment Facility
ML20213C65431 January 2014Burns & Mcdonnell Engineering Co, Inc., Groundwater Flow Model Update. Part 2 of 2
ML20213C65331 January 2014Burns & Mcdonnell Engineering Co, Inc., Groundwater Flow Model Update. Part 1 of 2
ML21153A39413 March 2013Cimarron Environmental Response Trust Site W AA Pneumatic Slug Testing
ML20213C66228 February 2013Cimarron Environmental Response Trust Hydrogeologic Pilot Test Report, Figures
ML20213C65828 February 2013Cimarron Environmental Response Trust Hydrogeologic Pilot Test Report
ML20213C66328 February 2013Cimarron Environmental Response Trust Hydrogeologic Pilot Test Report, Appendices
ML21239A13630 June 2011Cimarron Environmental Response Trust Evaluation of Potential Alternative Groundwater Remediation Technologies
ML20213C52731 October 2006Ensr Corporation, Conceptual Site Model (Revision - 01). Part 3 of 4
ML20213C52531 October 2006Ensr Corporation, Conceptual Site Model (Revision - 01). Part 1 of 4
ML20213C52631 October 2006Ensr Corporation, Conceptual Site Model (Revision - 01). Part 2 of 4
ML20213C52831 October 2006Ensr Corporation, Conceptual Site Model (Revision - 01). Part 4 of 4
ML20213C65230 October 2006Ensr Corp., Groundwater Flow Modeling Report
ML21119A06631 March 2004Uranium Travel Time and Estimated Maximum Concentration in the Cimarron River
ML20059N93125 January 1994Cimarron Corp., Burial Ground & Sanitary Lagoons Backfill Survey Data