ML23341A137 | 16 January 2024 | Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning | |
ML23192A821 | 14 August 2023 | and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location | Fire Protection Program |
LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days | 29 June 2022 | License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days | |
ML21295A229 | 15 November 2021 | Issuance of Amendment Nos. 340 and 321 Revise Technical Specifications to Adopt TSTF 569, Revision of Response Time Testing Definitions | Shutdown Margin Packing leak Anticipated operational occurrence Fire Protection Program |
ML21050A002 | 12 March 2021 | Issuance of Amendment No. 227 Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, RPV WIC Enhancements | Reactor Vessel Water Level Water Inventory Control Surveillance Frequency Control Program Fuel cladding Recently irradiated fuel Offsite Circuit |
ML21047A313 | 10 March 2021 | Issuance of Amendment No. 226 Revise Emergency Core Cooling System Technical Specification for High Pressure Coolant Injection System Inoperability (Non-Proprietary) | Water Inventory Control Probabilistic Risk Assessment |
ML20281A613 | 9 November 2020 | Issuance of Amendment No. 225 Revise Technical Specification Actions for Suppression Pool Cooling | Surveillance Frequency Control Program |
ML20231A632 | 29 September 2020 | Issuance of Amendment No. 224 Regarding Adoption of 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components of Nuclear Power Reactors | High winds Tornado Missile Internal Flooding Probabilistic Risk Assessment Cyber Security Incorporated by reference FLEX Fukushima Dai-Ichi Tornado Missile Protection Large early release frequency Flooding Focused Evaluation |
ML20034E617 | 27 February 2020 | and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 222, 333, and 314 Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer | EVT-1 |
ML19275D694 | 18 November 2019 | Issuance of Amendment Nos. 330 and 311 Revise Technical Specifications to Adopt TSFT-547, Clarification of Rod Position Requirements | Shutdown Margin Surveillance Frequency Control Program Fire Protection Program |
ML19186A205 | 6 August 2019 | Issuance of Amendment No. 217 Remote Shutdown System | Safe Shutdown Surveillance Frequency Control Program |
ML19065A156 | 27 March 2019 | Issuance of Amendment No. 215 Inverter Allowed Outage Time Extension | Safe Shutdown High winds Anticipated operational occurrence Internal Flooding Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency Maintenance Rule Program |
LR-N18-0129, License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements. | 4 February 2019 | License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements. | Shutdown Margin Anticipated operational occurrence Surveillance Frequency Control Program Power change |
ML17317A605 | 13 December 2017 | Issuance of Amendment, License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-535 | Shutdown Margin Anticipated operational occurrence |
ML17047A020 | 21 March 2017 | Issuance of Amendment to Delete Technical Specification Action Statement 3.4.2.1.b Associated with Stuck Open Safety/Relief Valves | Surveillance Frequency Control Program |
ML17053A178 | 15 March 2017 | Issuance of Amendment to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling | Reactor Vessel Water Level |
ML16270A038 | 13 October 2016 | Issuance of Amendment No. 200 Safety Limit Minimum Critical Power Ratio Change | Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Fuel cladding |
ML16096A419 | 28 April 2016 | Issuance of Amendments Replacement of Source Range and Intermediate Range Neutron Monitoring Systems | Shutdown Margin Anticipated operational occurrence Fire Protection Program |
ML16054A068 | 28 March 2016 | Issuance of Amendments Regarding Revision to Reactor Trip System Instrumentation Technical Specifications | Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Surveillance Frequency Control Program Earthquake Fire Protection Program |
ML16035A087 | 7 March 2016 | Issuance of Amendments New Technical Specifications to Isolate Unborated Water Sources in Mode 6 | Safe Shutdown Shutdown Margin Probabilistic Risk Assessment Surveillance Frequency Control Program Fire Protection Program |
LR-N16-0044, Emergency License Amendment Request to Modify Technical Specification Requirements for One Inoperable Subcooling Margin Monitor Channel | 11 February 2016 | Emergency License Amendment Request to Modify Technical Specification Requirements for One Inoperable Subcooling Margin Monitor Channel | Post Accident Monitoring Surveillance Frequency Control Program |
ML15286A091 | 30 November 2015 | Issuance of Amendment Adoption of Technical Specifications Task Force Traveler-522 | Surveillance Frequency Control Program Recently irradiated fuel |
LR-N15-0224, Response to Request for Additional Information License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling) | 25 November 2015 | Response to Request for Additional Information License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling) | Surveillance Frequency Control Program |
LR-N15-0182, License Amendment Request to Correct a Non-Conservative Technical Specification Applicability Statement and Inconsistent Action Statements | 12 October 2015 | License Amendment Request to Correct a Non-Conservative Technical Specification Applicability Statement and Inconsistent Action Statements | |
ML15245A636 | 4 September 2015 | Issuance of Emergency Amendment Regarding Removal of Pressurizer Power Operated Relief Valve Position Indication Instrumentation from Technical Specifications | Probabilistic Risk Assessment Functionality Assessment Surveillance Frequency Control Program Operability Determination Fire Protection Program |
ML15153A230 | 30 July 2015 | Issuance of Amendments Adopting Technical Specification Task Force (TSTF)-510, Rev, 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection(Tac Nos. MF4574 & MF457 | Anticipated operational occurrence Nondestructive Examination Incorporated by reference Fire Protection Program |
ML15141A271 | 17 June 2015 | and Salem Nuclear Generating Station, Unit Nos.1 and 2, Issuance of Amendments Update of Appendix B to the Renewed Facility Operating Licenses | NJPDES Fire Protection Program |
ML15063A293 | 30 March 2015 | Issuance of Amendments Revision to Power Distribution Limits for Axial Flux Difference and Heat Flux Hot Channel Factor | Anticipated operational occurrence Surveillance Frequency Control Program Fire Protection Program |
ML14108A399 | 18 December 2014 | Issuance of Amendment Request to Relocate Flood Protection Technical Specification to the Technical Requirements Manual | High winds Probabilistic Risk Assessment Incorporated by reference Surveillance Frequency Control Program |
LR-N14-0189, License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process | 25 November 2014 | License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process | Surveillance Frequency Control Program Recently irradiated fuel |
ML14108A312 | 29 July 2014 | Issuance of Amendment Request to Relocate Safety Relief Valve Position Instrumentation to Technical Requirements Manual | Reactor Vessel Water Level Probabilistic Risk Assessment Surveillance Frequency Control Program |
LR-N14-0074, License Amendment Request to Revise Power Distribution Limits for Axial Flux Difference and Heat Flux Hot Channel Factor | 24 March 2014 | License Amendment Request to Revise Power Distribution Limits for Axial Flux Difference and Heat Flux Hot Channel Factor | Surveillance Frequency Control Program |
LR-N13-0155, License Amendment Request to Relocate the Flood Protection Technical Specification to the Technical Requirements Manual | 5 September 2013 | License Amendment Request to Relocate the Flood Protection Technical Specification to the Technical Requirements Manual | High winds Surveillance Frequency Control Program Recently irradiated fuel |
LR-N13-0143, License Amendment Request to Relocate Safety/Relief Valve Position Instrumentation to the Technical Requirements Manual | 30 July 2013 | License Amendment Request to Relocate Safety/Relief Valve Position Instrumentation to the Technical Requirements Manual | Post Accident Monitoring Surveillance Frequency Control Program |
LR-N12-0183, License Amendment Request: Revision to Technical Specification (TS) 3.7.6.1 (Unit 1) and 3.7.6 (Unit 2) Control Room Emergency Air Conditioning System | 17 July 2012 | License Amendment Request: Revision to Technical Specification (TS) 3.7.6.1 (Unit 1) and 3.7.6 (Unit 2) Control Room Emergency Air Conditioning System | Fuel cladding |
LR-N12-0067, License Amendment Request to Correct Technical Specification and Facility Operating License Editorial Items | 1 March 2012 | License Amendment Request to Correct Technical Specification and Facility Operating License Editorial Items | Safe Shutdown Reactor Vessel Water Level Hydrostatic Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program License Renewal Fire Protection Program Power Uprate |
LR-N12-0028, Supplement to Application for Tech Spec Change TSTF-477 Rev. 3, Add Action for Two Inoperable Control Room AC Subsystems to the Tech Specs Using Consolidated Line Item Improvement Process | 26 January 2012 | Supplement to Application for Tech Spec Change TSTF-477 Rev. 3, Add Action for Two Inoperable Control Room AC Subsystems to the Tech Specs Using Consolidated Line Item Improvement Process | Recently irradiated fuel |
ML11116A148 | 20 July 2011 | Issuance of Renewed Facility Operating License No. NPF-57 for Hope Creek Generating Station | Safe Shutdown Time of Discovery Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Hydrostatic NJPDES Squib Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Scram Discharge Volume Annual Radiological Environmental Operating Report Process Control Program Excess Flow Check Valve Safeguards Contingency Plan Spiral reload Overtravel License Renewal EVT-1 Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Fire Protection Program Unidentified leakage Power Uprate Overspeed trip |
ML052720298 | 20 July 2011 | Current Facility Operating License NPF-57, Tech Specs, Revised 12/18/2017 | Safe Shutdown Time of Discovery Shutdown Margin Reactor Vessel Water Level Packing leak High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Hydrostatic NJPDES Squib Cyber Security Pressure and Temperature Limits Report Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Scram Discharge Volume Annual Radiological Environmental Operating Report Process Control Program Excess Flow Check Valve Safeguards Contingency Plan Spiral reload Overtravel License Renewal EVT-1 Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Fire Protection Program Unidentified leakage Power Uprate |
LR-N11-0208, Revised License Condition- Salem-Hope Creek Cyber Security Plan Supplement Submittal | 6 July 2011 | Revised License Condition- Salem-Hope Creek Cyber Security Plan Supplement Submittal | Cyber Security |
ML11175A207 | 30 June 2011 | Appendices a, B and C | Boric Acid Time of Discovery Shutdown Margin Packing leak High Radiation Area Grab sample Offsite Dose Calculation Manual Hydrostatic Operating Basis Earthquake Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Design basis earthquake Annual Radiological Environmental Operating Report Process Control Program Pressure Boundary Leakage Offsite Circuit Fire Protection Program Power change |
ML11136A064 | 30 June 2011 | Issuance of Renewed Facility Operating License Nos. DPR-70 and DPR-75 for Salem Nuclear Generating Station, Units 1 and 2 | Safe Shutdown Safeguards Contingency Plan License Renewal Fire Protection Program |
ML110980151 | 19 April 2011 | Correction to Amendment No. 187 Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program Based on Technical Specification Task Force (TSTF) Change TSTF-425 | Reactor Vessel Water Level Surveillance Frequency Control Program |
LR-N11-0098, Format and Editorial Corrections to Technical Specification Pages Issued with Amendment 187 | 4 April 2011 | Format and Editorial Corrections to Technical Specification Pages Issued with Amendment 187 | Reactor Vessel Water Level Surveillance Frequency Control Program |
LR-N11-0068, Application for Technical Specification Change TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process | 28 February 2011 | Application for Technical Specification Change TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process | Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Surveillance Frequency Control Program Recently irradiated fuel |
LR-N10-0363, License Amendment Request: Changes to Snubber Surveillance Requirements | 4 October 2010 | License Amendment Request: Changes to Snubber Surveillance Requirements | Incorporated by reference |
ML102080501 | 20 August 2010 | License Amendment, Issuance of Amendments Surveillance Requirements for Inservice Inspection and Inservice Testing | Safe Shutdown Time of Discovery Shutdown Margin Offsite Dose Calculation Manual Incorporated by reference Process Control Program Fire Protection Program |
LR-N10-0310, Supplement to License Amendment Request H09-06 to Adopt TSTF-460, Rev. 0, Control Rod Scram Times. | 19 August 2010 | Supplement to License Amendment Request H09-06 to Adopt TSTF-460, Rev. 0, Control Rod Scram Times. | |
ML101590713 | 21 July 2010 | Issuance of Amendment Control Rod Notch Testing Frequency | Shutdown Margin Anticipated operational occurrence Scram Discharge Volume Spiral reload Power change |
LR-N10-0098, License Amendment Request - One Time On-Line Safety-Related Battery Replacement | 29 March 2010 | License Amendment Request - One Time On-Line Safety-Related Battery Replacement | Safe Shutdown Tornado Missile Turbine Missile GOTHIC |