 Issue dateTitleTopic
ML23341A13716 January 2024Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning
ML23192A82114 August 2023and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower LocationFire Protection Program
LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days29 June 2022License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days
ML21295A22915 November 2021Issuance of Amendment Nos. 340 and 321 Revise Technical Specifications to Adopt TSTF 569, Revision of Response Time Testing DefinitionsShutdown Margin
Packing leak
Anticipated operational occurrence
Fire Protection Program
ML21050A00212 March 2021Issuance of Amendment No. 227 Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, RPV WIC EnhancementsReactor Vessel Water Level
Water Inventory Control
Surveillance Frequency Control Program
Fuel cladding
Recently irradiated fuel
Offsite Circuit
ML21047A31310 March 2021Issuance of Amendment No. 226 Revise Emergency Core Cooling System Technical Specification for High Pressure Coolant Injection System Inoperability (Non-Proprietary)Water Inventory Control
Probabilistic Risk Assessment
ML20281A6139 November 2020Issuance of Amendment No. 225 Revise Technical Specification Actions for Suppression Pool CoolingSurveillance Frequency Control Program
ML20231A63229 September 2020Issuance of Amendment No. 224 Regarding Adoption of 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components of Nuclear Power ReactorsHigh winds
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Cyber Security
Incorporated by reference
FLEX
Fukushima Dai-Ichi
Tornado Missile Protection
Large early release frequency
Flooding Focused Evaluation
ML20034E61727 February 2020and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 222, 333, and 314 Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License TransferEVT-1
ML19275D69418 November 2019Issuance of Amendment Nos. 330 and 311 Revise Technical Specifications to Adopt TSFT-547, Clarification of Rod Position RequirementsShutdown Margin
Surveillance Frequency Control Program
Fire Protection Program
ML19186A2056 August 2019Issuance of Amendment No. 217 Remote Shutdown SystemSafe Shutdown
Surveillance Frequency Control Program
ML19065A15627 March 2019Issuance of Amendment No. 215 Inverter Allowed Outage Time ExtensionSafe Shutdown
High winds
Anticipated operational occurrence
Internal Flooding
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
Maintenance Rule Program
LR-N18-0129, License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements.4 February 2019License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements.Shutdown Margin
Anticipated operational occurrence
Surveillance Frequency Control Program
Power change
ML17317A60513 December 2017Issuance of Amendment, License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-535Shutdown Margin
Anticipated operational occurrence
ML17047A02021 March 2017Issuance of Amendment to Delete Technical Specification Action Statement 3.4.2.1.b Associated with Stuck Open Safety/Relief ValvesSurveillance Frequency Control Program
ML17053A17815 March 2017Issuance of Amendment to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown CoolingReactor Vessel Water Level
ML16270A03813 October 2016Issuance of Amendment No. 200 Safety Limit Minimum Critical Power Ratio ChangeSafety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Fuel cladding
ML16096A41928 April 2016Issuance of Amendments Replacement of Source Range and Intermediate Range Neutron Monitoring SystemsShutdown Margin
Anticipated operational occurrence
Fire Protection Program
ML16054A06828 March 2016Issuance of Amendments Regarding Revision to Reactor Trip System Instrumentation Technical SpecificationsSafe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Surveillance Frequency Control Program
Earthquake
Fire Protection Program
ML16035A0877 March 2016Issuance of Amendments New Technical Specifications to Isolate Unborated Water Sources in Mode 6Safe Shutdown
Shutdown Margin
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Fire Protection Program
LR-N16-0044, Emergency License Amendment Request to Modify Technical Specification Requirements for One Inoperable Subcooling Margin Monitor Channel11 February 2016Emergency License Amendment Request to Modify Technical Specification Requirements for One Inoperable Subcooling Margin Monitor ChannelPost Accident Monitoring
Surveillance Frequency Control Program
ML15286A09130 November 2015Issuance of Amendment Adoption of Technical Specifications Task Force Traveler-522Surveillance Frequency Control Program
Recently irradiated fuel
LR-N15-0224, Response to Request for Additional Information License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling)25 November 2015Response to Request for Additional Information License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling)Surveillance Frequency Control Program
LR-N15-0182, License Amendment Request to Correct a Non-Conservative Technical Specification Applicability Statement and Inconsistent Action Statements12 October 2015License Amendment Request to Correct a Non-Conservative Technical Specification Applicability Statement and Inconsistent Action Statements
ML15245A6364 September 2015Issuance of Emergency Amendment Regarding Removal of Pressurizer Power Operated Relief Valve Position Indication Instrumentation from Technical SpecificationsProbabilistic Risk Assessment
Functionality Assessment
Surveillance Frequency Control Program
Operability Determination
Fire Protection Program
ML15153A23030 July 2015Issuance of Amendments Adopting Technical Specification Task Force (TSTF)-510, Rev, 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection(Tac Nos. MF4574 & MF457Anticipated operational occurrence
Nondestructive Examination
Incorporated by reference
Fire Protection Program
ML15141A27117 June 2015and Salem Nuclear Generating Station, Unit Nos.1 and 2, Issuance of Amendments Update of Appendix B to the Renewed Facility Operating LicensesNJPDES
Fire Protection Program
ML15063A29330 March 2015Issuance of Amendments Revision to Power Distribution Limits for Axial Flux Difference and Heat Flux Hot Channel FactorAnticipated operational occurrence
Surveillance Frequency Control Program
Fire Protection Program
ML14108A39918 December 2014Issuance of Amendment Request to Relocate Flood Protection Technical Specification to the Technical Requirements ManualHigh winds
Probabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
LR-N14-0189, License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process25 November 2014License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement ProcessSurveillance Frequency Control Program
Recently irradiated fuel
ML14108A31229 July 2014Issuance of Amendment Request to Relocate Safety Relief Valve Position Instrumentation to Technical Requirements ManualReactor Vessel Water Level
Probabilistic Risk Assessment
Surveillance Frequency Control Program
LR-N14-0074, License Amendment Request to Revise Power Distribution Limits for Axial Flux Difference and Heat Flux Hot Channel Factor24 March 2014License Amendment Request to Revise Power Distribution Limits for Axial Flux Difference and Heat Flux Hot Channel FactorSurveillance Frequency Control Program
LR-N13-0155, License Amendment Request to Relocate the Flood Protection Technical Specification to the Technical Requirements Manual5 September 2013License Amendment Request to Relocate the Flood Protection Technical Specification to the Technical Requirements ManualHigh winds
Surveillance Frequency Control Program
Recently irradiated fuel
LR-N13-0143, License Amendment Request to Relocate Safety/Relief Valve Position Instrumentation to the Technical Requirements Manual30 July 2013License Amendment Request to Relocate Safety/Relief Valve Position Instrumentation to the Technical Requirements ManualPost Accident Monitoring
Surveillance Frequency Control Program
LR-N12-0183, License Amendment Request: Revision to Technical Specification (TS) 3.7.6.1 (Unit 1) and 3.7.6 (Unit 2) Control Room Emergency Air Conditioning System17 July 2012License Amendment Request: Revision to Technical Specification (TS) 3.7.6.1 (Unit 1) and 3.7.6 (Unit 2) Control Room Emergency Air Conditioning SystemFuel cladding
LR-N12-0067, License Amendment Request to Correct Technical Specification and Facility Operating License Editorial Items1 March 2012License Amendment Request to Correct Technical Specification and Facility Operating License Editorial ItemsSafe Shutdown
Reactor Vessel Water Level
Hydrostatic
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
License Renewal
Fire Protection Program
Power Uprate
LR-N12-0028, Supplement to Application for Tech Spec Change TSTF-477 Rev. 3, Add Action for Two Inoperable Control Room AC Subsystems to the Tech Specs Using Consolidated Line Item Improvement Process26 January 2012Supplement to Application for Tech Spec Change TSTF-477 Rev. 3, Add Action for Two Inoperable Control Room AC Subsystems to the Tech Specs Using Consolidated Line Item Improvement ProcessRecently irradiated fuel
ML11116A14820 July 2011Issuance of Renewed Facility Operating License No. NPF-57 for Hope Creek Generating StationSafe Shutdown
Time of Discovery
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Hydrostatic
NJPDES
Squib
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Scram Discharge Volume
Annual Radiological Environmental Operating Report
Process Control Program
Excess Flow Check Valve
Safeguards Contingency Plan
Spiral reload
Overtravel
License Renewal
EVT-1
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Fire Protection Program
Unidentified leakage
Power Uprate
Overspeed trip
ML05272029820 July 2011Current Facility Operating License NPF-57, Tech Specs, Revised 12/18/2017Safe Shutdown
Time of Discovery
Shutdown Margin
Reactor Vessel Water Level
Packing leak
High Radiation Area
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Hydrostatic
NJPDES
Squib
Cyber Security
Pressure and Temperature Limits Report
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Scram Discharge Volume
Annual Radiological Environmental Operating Report
Process Control Program
Excess Flow Check Valve
Safeguards Contingency Plan
Spiral reload
Overtravel
License Renewal
EVT-1
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Fire Protection Program
Unidentified leakage
Power Uprate
LR-N11-0208, Revised License Condition- Salem-Hope Creek Cyber Security Plan Supplement Submittal6 July 2011Revised License Condition- Salem-Hope Creek Cyber Security Plan Supplement SubmittalCyber Security
ML11175A20730 June 2011Appendices a, B and CBoric Acid
Time of Discovery
Shutdown Margin
Packing leak
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Hydrostatic
Operating Basis Earthquake
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Design basis earthquake
Annual Radiological Environmental Operating Report
Process Control Program
Pressure Boundary Leakage
Offsite Circuit
Fire Protection Program
Power change
ML11136A06430 June 2011Issuance of Renewed Facility Operating License Nos. DPR-70 and DPR-75 for Salem Nuclear Generating Station, Units 1 and 2Safe Shutdown
Safeguards Contingency Plan
License Renewal
Fire Protection Program
ML11098015119 April 2011Correction to Amendment No. 187 Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program Based on Technical Specification Task Force (TSTF) Change TSTF-425Reactor Vessel Water Level
Surveillance Frequency Control Program
LR-N11-0098, Format and Editorial Corrections to Technical Specification Pages Issued with Amendment 1874 April 2011Format and Editorial Corrections to Technical Specification Pages Issued with Amendment 187Reactor Vessel Water Level
Surveillance Frequency Control Program
LR-N11-0068, Application for Technical Specification Change TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process28 February 2011Application for Technical Specification Change TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement ProcessSafe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Surveillance Frequency Control Program
Recently irradiated fuel
LR-N10-0363, License Amendment Request: Changes to Snubber Surveillance Requirements4 October 2010License Amendment Request: Changes to Snubber Surveillance RequirementsIncorporated by reference
ML10208050120 August 2010License Amendment, Issuance of Amendments Surveillance Requirements for Inservice Inspection and Inservice TestingSafe Shutdown
Time of Discovery
Shutdown Margin
Offsite Dose Calculation Manual
Incorporated by reference
Process Control Program
Fire Protection Program
LR-N10-0310, Supplement to License Amendment Request H09-06 to Adopt TSTF-460, Rev. 0, Control Rod Scram Times.19 August 2010Supplement to License Amendment Request H09-06 to Adopt TSTF-460, Rev. 0, Control Rod Scram Times.
ML10159071321 July 2010Issuance of Amendment Control Rod Notch Testing FrequencyShutdown Margin
Anticipated operational occurrence
Scram Discharge Volume
Spiral reload
Power change
LR-N10-0098, License Amendment Request - One Time On-Line Safety-Related Battery Replacement29 March 2010License Amendment Request - One Time On-Line Safety-Related Battery ReplacementSafe Shutdown
Tornado Missile
Turbine Missile
GOTHIC