Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML19183A4912 July 2019LLC - Submittal of Changes to Technical Specifications Section 1.3, Completion Times and Section 3.7, Plant Systems, and Bases Section 3.3, Instrumentation, Section 3.4, Reactor Coolant System, Section 3.5, Passive Core CoolingUnanalyzed Condition
High Radiation Area
Ultimate heat sink
Hydrostatic
Surveillance Frequency Control Program
ML19136A40416 May 2019LLC Submittal of Changes to Design Certification Application Part 4, Technical SpecificationsHigh Radiation Area
Surveillance Frequency Control Program
ML18086B20927 March 2018LLC Submittal of Minor Changes to Technical Specifications LCO 3.0.8, 3.1.9, Boron Dilution Control, Table 3.3.1-1, Module Protection System Instrumentation, 3.4.6 Bases, CVCS Isolation Valves, 3.5.1, Emergency ...Boric Acid
Ultimate heat sink
Hydrostatic
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
ML18078B31119 March 2018LLC Submittal of Changes to Technical Specifications, Section 5.4, ProceduresFire Protection Program