ML18078B311
| ML18078B311 | |
| Person / Time | |
|---|---|
| Site: | NuScale |
| Issue date: | 03/19/2018 |
| From: | Rad Z NuScale |
| To: | Document Control Desk, Office of New Reactors |
| References | |
| LO-0318-59189 | |
| Download: ML18078B311 (3) | |
Text
LO-0318-59189 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvallis, Oregon 97330 Office 541.360-0500 Fax 541.207.3928 www.nuscalepower.com March 19, 2018 Docket No.52-048 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738
SUBJECT:
NuScale Power, LLC Submittal of Changes to Technical Specifications, Section 5.4, Procedures
REFERENCES:
Letter from NuScale Power LLC, to Nuclear Regulatory Commission, NuScale Power, LLC Submittal of the NuScale Standard Plant Design Certification Application, dated December 31, 2016 (ML17013A229)
During a February 21, 2018 teleconference with 15&3URMHFW0DQDJHUA. Markley and the STSB of the NRC staff, NuScale Power, LLC (NuScale) discussed potential updates to Technical Specification 6ection 5.4, Procedures. As a result of this discussion, NuScale changed Section 5.4.
The Enclosure to this letter provides a mark-up of the Technical Specifications pages incorporating revisions to 6ection 5.4, in redline/strikeout format. NuScale will include this change as part of a future revision to the NuScale Design Certification Application.
This letter makes no regulatory commitments or revisions to any existing regulatory commitments.
Please feel free to contact Steven Mirsky at 240-833-3001 or at smirsky@nuscalepower.com if you have any questions.
Sincerely, Zackary W. Rad Director, Regulatory Affairs NuScale Power, LLC Distribution: Samuel Lee, NRC, OWFN-8G9A Gregory Cranston, NRC, OWFN-8G9A Anthony Markley, NRC, OWFN-8G9A
Enclosure:
Changes to NuScale Technical Specifications Section 5.4, Procedures Zackary W. Rad Di t
R l t Aff
LO-0318-59189 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvallis, Oregon 97330 Office 541.360-0500 Fax 541.207.3928 www.nuscalepower.com
Enclosure:
Changes to NuScale Technical Specifications, Section 5.4, Procedures
Procedures 5.4 NuScale 5.4-1 Draft Revision 2.0 5.0 ADMINISTRATIVE CONTROLS 5.4 Procedures 5.4.1 Written procedures shall be established, implemented, and maintained covering the following activities:
a.
The applicable procedures recommended in Regulatory Guide 1.33, Revision 32, Appendix A, February 1978June 2013; b.
The emergency operating procedures required to implement the requirements of NUREG-0737 and NUREG-0737, Supplement 1; c.
Quality assurance for effluent and environmental monitoring; d.
Fire Protection Program implementation; and e.
All programs specified in Specification 5.5; and.
f.
Procedures that implement the availability and reliability controls applicable to structures, systems, or components as described in the owner-controlled requirements manual.