Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20101Q343 | 30 June 1992 | Metallurgical Evaluation of Weld Overlaid Pipe Sections from Brunswick Unit 2 Nuclear Power Station | |
ML20058A113 | 27 September 1990 | Notification of Contract Execution,Awarding Task Order 3, NDE Support at Brunswick 1 Nuclear Power Plant. Contractor:Tet,Inc | |
ML20065C961 | 24 August 1990 | Rev 2 to Technical Evaluation Rept Brunswick Steam Electric Plant Units 1 & 2 Station Blackout Evaluation, Final Rept | Safe Shutdown Reactor Vessel Water Level |
ML20005E997 | 30 November 1989 | Technical Evaluation Rept Pump & Valve Inservice Testing Program,Brunswick Steam Electric Plant,Units 1 & 2. | Safe Shutdown Stroke time Squib Scram Discharge Volume Excess Flow Check Valve Cold shutdown justification Power Operated Valves |
ML20071P715 | 30 November 1989 | Rev 1 to Brunswick Steam Electric Plant Unit 2 Risk-Based Insp Guide, Final Version | Reactor Vessel Water Level Mission time Probabilistic Risk Assessment Squib Fuel cladding |
ML20011D915 | 30 November 1989 | Review of the Brunswick Steam Electric Plant Probabilistic Risk Assessment | High winds Ultimate heat sink Mission time Fire Barrier Internal Flooding Probabilistic Risk Assessment Earthquake Scaffolding |
ML19325C145 | 10 July 1989 | Technical Evaluation Rept for Dcrdr at CP&L Brunswick Steam Electric Plant,Units 1 & 2. | |
ML19325C147 | 7 July 1989 | Post-Implementation Audit Rept for CP&L Brunswick Steam Electric Plant Units 1 & 2 SPDS 890515-18. | |
ML20070Q525 | 31 January 1989 | Nuclear Power Plant Sys Sourcebook,Brunswick 1 & 2 | Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Scram Discharge Volume Failure to Scram Overspeed trip |
ML20246B722 | 31 January 1988 | Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Relief Requests:Cp&L,Brunswick Steam Electric Plant, Units 1 & 2 | |
ML20246P967 | 31 January 1988 | Technical Evaluation Rept on Second 10-yr Interval Inservice Insp Program Plan,Brunswick Steam Electric Plant Unit 1 | Hydrostatic VT-2 Incorporated by reference Stress corrosion cracking |
ML20236P640 | 31 July 1987 | Review of Recirculation Pump Trip Design for Brunswick Steam Electric Plants, Informal Rept | |
ML20215L882 | 31 May 1987 | Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Brunswick 1 & 2, Informal Rept | |
ML20215L863 | 30 April 1987 | Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components,Brunswick 1 & 2, Informal Rept | |
ML20214R068 | 30 April 1987 | Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Arnold,Brunswick-1 & 2, Informal Rept | |
ML20211P078 | 16 July 1986 | Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Brunswick Steam Electric Plant Units 1 & 2, Supplementary Technical Evaluation Rept | |
ML20203P999 | 7 March 1986 | Site Survey of Brunswick Steam Electric Plant Units 1 & 2 Maint Program & Practices, Technical Ltr Rept | Systematic Assessment of Licensee Performance Backfit |
ML20127P363 | 30 June 1985 | IN-PLANT Source Term Measurements at Brunswick Steam Electric Station | |
ML20128N648 | 31 May 1985 | Adequacy of Station Electric Distribution Sys Voltages, Brunswick Steam Electric Station,Units 1 & 2, Informal Rept | |
ML20128A574 | 25 March 1985 | Conformance to Reg Guide 1.97,Brunswick Steam Electric Plant Units 1 & 2, Informal Rept | Boric Acid Squib |
ML20127D625 | 15 March 1985 | Evaluation of Detailed Control Room Design Review Program Plan for Brunswick Steam Electric Plant,Units 1 & 2 | |
ML20115A382 | 16 November 1984 | Masonry Wall Design,Brunswick Steam Electric Plant Units 1 & 2, Interim Technical Evaluation Rept | Tornado Missile Safe Shutdown Earthquake Operating Basis Earthquake |
ML20106G009 | 16 November 1984 | Masonry Wall Design,Brunswick Steam Electric Plant Units 1 & 2, Technical Evaluation Rept | Tornado Missile Safe Shutdown Earthquake Operating Basis Earthquake |
ML20100R714 | 30 October 1984 | Conformance to Reg Guide 1.97,Brunswick Steam Electric Plant Units 1 & 2, Interim Rept Covering Emergency Response Capability | Boric Acid Squib Unidentified leakage |
ML20090H712 | 23 April 1984 | Control of Heavy Loads,Brunswick Units 1 & 2, Technical Evaluation Rept | Safe Shutdown Control of Heavy Loads |
ML20085J318 | 7 October 1983 | Audit for Mark 1 Containment Long-Term Program - Structural Analysis for Operating Reactors,Brunswick Units 1 & 2, Technical Evaluation Rept | Finite Element Analysis |
ML20085J054 | 30 September 1983 | Technical Evaluation of Brunswick Units 1 & 2,Plant-Unique Analysis Rept | Subsequent actuation |
ML20091D654 | 31 July 1983 | Integrity of Brunswick Steam Electric Plant,Units 1 & 2 Reactor Coolant Boundary Piping Sys, Technical Evaluation | Weld Overlay Nondestructive Examination Stress corrosion cracking Pressure boundary leak Dissimilar Metal Weld Unidentified leakage Unidentified leak |
ML20079Q726 | 13 June 1983 | ECCS Repts (F-47) TMI Action Plan Requirements,Brunswick Steam Electric Plant,Units 1 & 2, Technical Evaluation Rept | Overspeed trip |
ML20127A289 | 5 October 1982 | Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 | |
ML20126F254 | 26 August 1982 | Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 | |
ML20065R245 | 15 July 1982 | Operating Reactors - TMI Lessons Learned,NUREG-0737 Response Evaluations (Program Ii);Project 1,RCS Vents for Brunswick 1 & 2, Final Technical Evaluation Rept | |
ML20078Q600 | 9 July 1982 | Control of Heavy Loads,Brunswick Units 1 & 2, Draft Technical Evaluation Rept | Safe Shutdown Coatings Control of Heavy Loads |
ML20069E178 | 30 June 1982 | Investigation of Raychem Cable Installed in Brunswick Plant,Phase 2-Evaluation & Test Recommendation | Boric Acid |
ML20069E438 | 26 April 1982 | Technical Evaluation Rept on Monitoring of Electric Power to Reactor Protection Sys for Brunswick Steam Electric Plant,Units 1 & 2 | |
ML20069E176 | 23 October 1981 | Investigation of Raychem Cable Installed in Brunswick Plant,Phase 1-Preliminary Evaluation & Test Plan, Interim Rept | Boric Acid Hydrostatic |
ML20010F075 | 30 July 1981 | Settlement Agreement Between VEPCO & Nc Municipal Power Agency Number 3 Including Agreement for Interim Electric Svc & Agreement for Transmission Use & Other Electric Svc. | Incorporated by reference Earthquake |
ML20010F071 | 30 July 1981 | Purchase,Const & Ownership Agreement Between CP&L & Nc Municipal Power Agency Number 3 & Exhibits. | Earthquake Uranium Hexafluoride |
ML20010F067 | 30 July 1981 | Operating & Fuel Agreement Between CP&L & Nc Municipal Power Agency Number 3 & Exhibits. | Earthquake Uranium Hexafluoride |
ML20010F060 | 30 July 1981 | Power Coordination Agreement Between CP&L & Nc Municipal Power Agency Number 3 & Exhibits. | |
ML20009F171 | 30 June 1981 | Adequacy of Station Electric Distribution Sys Voltages, Brunswick Nuclear Power Station Units 1 & 2, Technical Evaluation Rept | Safe Shutdown |
ML20009H111 | 10 June 1981 | Equipment Environ Qualification,Brunswick Steam Electric Plant Unit 1, Technical Evaluation Rept | |
ML20009H112 | 10 June 1981 | Equipment Environ Qualification,Brunswick Steam Electric Plant Unit 2, Technical Evaluation Rept | |
ML20003F110 | 31 March 1981 | Adequacy of Station Electric Distribution Sys Voltages, Preliminary Technical Evaluation Rept | Safe Shutdown |
ML20004E291 | 31 January 1981 | Equipment Environ Qualification,Brunswick Unit 2, Final Draft Technical Evaluation Rept | |
ML19338G568 | 9 October 1980 | Feedwater Nozzle Cracking,Brunswick Steam Electric Plant Unit 2, Technical Evaluation Rept | Stress corrosion cracking |
ML19338G566 | 9 October 1980 | Feedwater Nozzle Cracking,Brunswick Steam Electric Plant Unit 1, Technical Evaluation Rept | Stress corrosion cracking |
ML19330A723 | 31 July 1980 | Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals,Brunswick Steam Electric Plant,Unit 2. | Reactor Vessel Water Level |
ML20010E423 | 31 July 1980 | Technical Evaluation Rept:Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals. | Reactor Vessel Water Level |
ML19326D963 | 31 July 1980 | Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals,Brunswick Steam Electric Plant,Unit 1. | Reactor Vessel Water Level |