Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20210A404 | 15 July 1999 | Ei Hatch Nuclear Plant Unit 1,Extended Power Uprate Startup Test Rept for Cycle 19 | Shutdown Margin Grab sample |
ML20204J603 | 19 March 1999 | Ei Hatch Nuclear Plant Unit 2 Extended Power Uprate Startup Test Rept for Cycle 15 | Shutdown Margin Grab sample |
HL-5558, Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 18 | 17 February 1998 | Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 18 | Shutdown Margin |
HL-5438, Ei Hatch Nuclear Plant - Unit 2 Power Uprate Startup Test Rept for Cycle 14 | 21 July 1997 | Ei Hatch Nuclear Plant - Unit 2 Power Uprate Startup Test Rept for Cycle 14 | Shutdown Margin |
HL-5192, Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 17 | 18 July 1996 | Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 17 | |
ML20212C149 | 31 May 1996 | Stability Monitor | |
ML20100P104 | 4 March 1996 | Ei Hatch Nuclear Plant Unit 2 Power Uprate Startup Test Rept for Cycle 13 | Shutdown Margin Reactor Vessel Water Level |
ML20073E809 | 7 September 1994 | Final Test Rept CRD Performance Evaluation Testing W/ Driveline Misalignment, Including Test Correlation W/Hatch Unit 1 | Hydrostatic |
ML20045G369 | 31 May 1993 | Rcb ILRT Unit 1 - Fifth Periodic, Summary Rept | |
ML20128F678 | 30 November 1992 | Reactor Containment Bldg Ilrt,Unit 2 - Fourth Periodic Summary Rept | |
HL-1781, Plant Ei Hatch Unit 2,Post Refueling Outage Startup Test Rept,Unit 2,Cycle 10 | 22 August 1991 | Plant Ei Hatch Unit 2,Post Refueling Outage Startup Test Rept,Unit 2,Cycle 10 | Shutdown Margin |
ML20059C753 | 27 August 1990 | Post-Refueling Outage Startup Test Rept Unit 1,Cycle 13 | Shutdown Margin |
ML20006D780 | 30 November 1989 | Edwin I Hatch Nuclear Plant Unit 2 Reactor Containment Bldg 1989 Integrated Leakage Rate Test, Final Rept | |
ML20235X737 | 6 March 1989 | Post Refueling Outage Startup Test Rept,Unit 1 Cycle 12 | Shutdown Margin |
ML20235T193 | 30 November 1988 | Edwin I Hatch Nuclear Plant Unit 1 1988 Reactor Containment Bldg Integrated Leakage Rate Test, Final Rept | Safe Shutdown Reactor Vessel Water Level |
ML20211M518 | 30 November 1986 | Ei Hatch Nuclear Plant Unit 2,Reactor Containment Bldg Integrated Leak Rate Test, Final Rept | Packing leak |
ML20211R074 | 30 April 1986 | Reactor Containment Bldg Integrated Leak Rate Test, Final Rept | |
ML20212A007 | 30 April 1986 | Reactor Containment Bldg 'As Found' Condition | |
ML20101E552 | 14 December 1984 | Summary of Reviews & Analyses Performed for Part 21 Evaluation Re Floor Response Spectra Peak Broadening for Ei Hatch Nuclear Plant Units 1 & 2 | Safe Shutdown Operating Basis Earthquake Design basis earthquake Earthquake |
ML20091M320 | 31 May 1984 | Recirculation,Rhr & Reactor Water Cleanup Weld Joint Insp Program - 1984 Maint/Refueling Outage | Weld Overlay Liquid penetrant |
ML20076J936 | 28 February 1983 | Primary Reactor Containment Integrated Leakage Rate Test Rept | |
ML20065B055 | 31 May 1982 | Primary Reactor Containment Integrated Leakage Rate Test Rept | |
ML19291B903 | 7 December 1979 | Adequacy of Station Electric Distribution Sys Voltage. | |
ML19210E076 | 21 November 1979 | Startup Test Rept for Cycle 4 | Shutdown Margin |
ML20137W640 | 31 October 1979 | Final Summary Rept,Edwin I Hatch Unit 2 Startup Test Results | |
ML19331B513 | 4 October 1979 | Final Startup Testing Rept. | |
ML20104A285 | 5 March 1979 | Containment Leak Rate Test Program Incorporating Updated NRC Positions | |
ML20062G031 | 30 June 1978 | Reactor Containment Bldg Integrated Leakage Rate Test. Type a & Suppl Verification Tests Performed in Accordance W/Tech Specs Using Formulas from ANSI N45.4-1972 & BN-Top-1, Rev 1 | Reactor Vessel Water Level |
ML20062J354 | 30 April 1975 | Seismic Test of Diesel Generator Control Console:Xal 71696 - SD 3025 |