 Issue dateTitleTopic
ML20207F35125 February 1999Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical CircuitsFire Barrier
Fire Protection Program
ML20112G40630 May 1996CPSES Unit 2 Cycle 3 Startup Rept
ML20067D21514 January 1994First Periodic Reactor Containment Bldg Integrated Leakage Rate Test Final Rept, for Comanche Peak Ses Unit 1
ML20059F5344 October 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (Flex-Blanket Wrapped Cables Laid in 36 Inch Cable Tray Assembly)Fire Barrier
Commercial Grade Dedication
Temporary Modification
Fire Protection Program
ML20059F5284 October 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (Box Design Air Drop from Two Nested 24 Inch Cable Tray Assemblies)Fire Barrier
Fire Protection Program
TXX-9332, Cycle 1 Startup Rept15 September 1993Cycle 1 Startup ReptSafe Shutdown
Boric Acid
Shutdown Margin
Grab sample
Stroke time
Pressure Boundary Leakage
Power change
ML20059F52327 August 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (24 Inch Cable Tray Assembly W/2 Inch Diameter & 1-1/2 Inch Diameter Air Drop)Fire Barrier
Fire Protection Program
ML20059F50427 August 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (Three 24 Inch Cable Tray Assemblies)
ML20059F51123 August 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (12 Inch Cable Tray & 2 Inch Conduit)Fire Barrier
Fire Protection Program
ML20128H11914 January 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (24 Inch Tray W/Air Drops)Fire Barrier
Fire Protection Program
ML20128G99813 January 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (12 Inch Tray)Fire Barrier
ML20128H01813 January 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (30 Inch Tray W/Tee)
ML20128H05213 January 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (3/4 Inch,1-1/2 Inch & 2 Inch Conduits)Fire Barrier
Commercial Grade Dedication
Fire Protection Program
ML20128H07713 January 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (30 Inch Tray)Fire Barrier
ML20128H11213 January 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (24 Inch Tray W/Tee)
ML20128H03111 January 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (Two 3 Inch Conduits W/Junction Boxes)Fire Barrier
Fire Protection Program
ML20128H1027 January 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (Two 3 Inch Conduits W/Junction Boxes)
ML20128H0925 January 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (3/4 Inch,3 Inch & 5 Inch Conduits W/Radial Bends)
ML20128H0684 November 1992Fire Endurance Test of Thermolag 330-1 Fire Protective Envelope (36 Inch Tray W/Tee)Fire Barrier
ML20126C83630 September 1992Reactor Containment Building Integrated Leakage Rate Test for Comanche Peak Steam Electric Station,Unit 2 Final Rept
ML20044B55929 April 1992Toxicological Evaluation of Combustion Products from Thermal Barrier Matl Decomposed Under Flaming & Nonflaming Conditions, Rept of Test Fr 3987
ML20062D89512 November 1990Cycle 1 Startup Rept
ML20012E19423 March 1990Cycle 1 Startup Physics Tests Control Rod Worth Predictions Utilizing TU Electric Control Rod Swap Methodology.
ML19327A94031 July 1989Final Rept, Reactor Containment Bldg Integrated Leakage Rate Test.
ML20235J44611 January 1989Rev 1 to Test Rept Demonstration of IE to Non-IE Isolation for RS-232C Serial Data Port
ML20151E46913 July 1988Civil/Structural Tests Re Hilti Expansion Anchors Installed in Coredrilled Holes & Richmond Inserts W/Partial Bolt Engagements
ML20155J80731 March 1988Final Summary Rept Comanche Peak Conduit Tests, Technical ReptSafe Shutdown
Safe Shutdown Earthquake
Earthquake
ML20235F90411 September 1987Rev 3 to M-28, Justification of Clip Modelling Procedure
ML20235F85527 July 1987Rev 2 to M-38, Siderail Extension Study
ML20235F78823 July 1987Rev 3 to M-12, Qualification Procedures for Cable Tray Support Evaluation
ML20235F8205 May 1987Rev 2 to M-27, Thermal Load Evaluation
ML20210C80328 February 1987Rev 0 to Comanche Peak Steam Electric Station Cable Tray Sys Analysis/Test CorrelationEarthquake
ML20210C89125 February 1987Rev 1 to Thermal Load Evaluation
ML20210D24424 February 1987Vol 1 to Book 25, Reduced Section Properties for Channels
ML20210D13517 February 1987Vol 1 of Book 24 to Cth Post-Test Analysis Correlation
ML20210D16531 January 1987Rev 0 to Comanche Peak Cable Tray Tests, Final Summary ReptSafe Shutdown
Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
Liquid penetrant
Reverse polarity
ML20236N4169 October 1986Rev 3 to LIS-100C, Min Required Gap Between Bldgs
ML20236N4689 October 1986LIS-501C, Turbine Bldg Seismic Displacement
ML20236N4331 October 1986Rev 4 to LIS-100C, Min Required Gap Between Secondary Walls & Floors Above
ML20211K18019 September 1986Rev 1 to Calculation/Problem ROTC-06, Multimode Factor Evaluation Train C
ML20236N4615 September 1986Rev 0 to LIS-100C, Min Required Gap Between Rcb & Auxiliary Bldg at Approx 900 Ft & Above
ML20236N4865 September 1986LIS-520C, Relative Displacement Between Reactor & Auxiliary Bldgs at Elevation 916 Ft
ML20212D6214 September 1986Test Rept 48422-1, Cable Separation Test Program
ML20211K18710 July 1986Test Rept for Static Testing of Train C Beam Clamps & Unistrut Hangers for Comanche Peak Steam Electric Station (Cpses)
ML20211K21527 May 1986Rev 0 to Calculation/Problem ROTC-02, Procedure to Calculate Anchor Bolt Loads,Train C Conduit 2 Inches & Under
ML20212D7021 May 1986Test Rept 48037-02, Electrical Raceway Separation Verification Testing
ML20236N45011 November 1985LIS-100C, Min Required Gap Between Containment Wall & Internal Structure
A07596, Torsiograph Test of Emergency Diesel Generator 1DG2 at Comanche Peak Steam Electric Station28 February 1985Torsiograph Test of Emergency Diesel Generator 1DG2 at Comanche Peak Steam Electric Station
ML20107A97331 December 1984Reactor Containment Bldg Unit 1 Preoperational Type B & C Local Leak Rate Test
ML20094N67910 August 1984Radiation Analysis of Barton Model 288A Differential Pressure Indicating Switch for Texas Utils Generating Co