Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML11189A0496 July 2011Comment (8) of Lewis Patrie, Opposing Proposed Rules Pr 50, Draft Regulatory Basis for a Potential Rulemaking on Spent Nuclear Fuel Reprocessing Facilities
ML0807205025 March 2008Letter from Thomas P. Harrall on Behalf of Duke Energy on Pr 20, 30, 40, 50, 70 and 72 Regarding Decommissioning Planning. Supports Nei'S Request for a 90-Day Extension of the Comment Period
ML07352154217 December 2007Comment (1) of Thomas P. Harrall, on Behalf of Duke Energy, on Proposed Rule Pr 50, Regarding Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock EventsUltimate heat sink
Probabilistic Risk Assessment
ML07277091221 September 2007Comment (1) of Henry B. Barron, on Behalf of Duke Energy on Energy Solutions PRM-50-88 Re to Amend 10 CFR 50.82., Termination of License
ML06321021715 November 2006Comment (2) Submitted by Duke Energy, Bryan J. Dolan, on Supplemental Proposed Rules PR-2, 50, 51, and 52, Regarding Licenses, Certifications, and Approvals for Nuclear Power Plants
ML0607302106 March 2006Comment (11) Submitted by Duke Power Company, James R. Morris on Proposed Rule PR-50 Regarding Risk-Informed Changes to Loss-of-Coolant Accident (LOCA) Technical RequirementsBackfit
ML0407609043 March 2004Comment (13) Submitted by Duke Energy Corporation, H. B. Barron on Proposed Rules Pr 170 & 171, Revision of Fee Schedules; Fee Recovery for Fy 2004
ML03269030623 September 2003Comment (1) Submitted by Duke Energy Corporation, W. R. Mccollum on Proposed Rule PR-50 Re Emergency Planning and Preparedness for Production and Utilization Facilities
ML03280129922 September 2003Comment (1) Submitted by Duke Energy Corp., W. R. Mccollum on Proposed Rule PR-50 Re Emergency Planning and Preparedness for Production and Utilization Facilities
ML03239051711 August 2003Comment (15) Submitted by Duke Power Co., W. R. Mccollum on Proposed Rule PR-50 Re Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power ReactorsSafe Shutdown
Design basis earthquake
Earthquake
Backfit
ML03127014028 April 2003Comment (13) Submitted by Duke Power, Michael S. Tuckman, on Proposed Rules PR-170 and PR-171 Re Revision for Fee Schedule; Fee Recovery for Fy 2003
ML02289040317 September 2002Comment from Mary T. Kelly on Proposed EIS for a MOX Fabricating Facility at SRSChernobyl
ML0225600653 September 2002Comment of M.S. Tuckman on Model Safety Evaluation on TS Improvement to Modify Requirements Regarding Mode Change Limitations Using Consolidated Line Item Improvement ProcessTime of Discovery
Missed surveillance
ML02233056410 July 2002General Notice Comment Letter on Draft Regulatory Guides, DG-1114, Control Room Habitability at Nuclear Power Reactors, and DG-1115, Demonstrating Control Room Envelope Integrity at Nuclear Power Reactors Dated March 28, 2002
ML02199064310 July 2002General Notice Comment Letter on Draft Regulatory Guides, DG-1114, Control Room Habitability at Nuclear Power Reactors, and DG-1115, Demonstrating Control Room Envelope Integrity at Nuclear Power Reactors Dated March 28, 2002
ML02149027623 May 2002Comment (3) Submitted by Duke Power Co., M.S. Tuckman on Proposed Rule PR-50 Regarding Incorporation by Reference of ASME BPV and OM Code Cases