 Issue dateTitleTopic
ML24012A24512 January 2024Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line
ML23299A30526 October 2023Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle
ML23048A32017 February 2023Response to NRC Requests for Additional Information Regarding 2022 Unit 1 Steam Generator Tube Inspections
ML22090A08031 March 2022Response to NRC Requests for Additional Information Regarding 2021 Unit 3 Steam Generator Tube Inspections
ML22053A21222 February 2022Response to Requests for Confirmation of Information for Exemption from Certain Requirements of 10 CFR 50.62(c)(1) Using Risk-Informed Process for EvaluationsExemption Request
ML21173A36022 June 2021Response to Request for Additional Information for Permanent Extension of Type a and Type C Leak Rate Test FrequenciesIncorporated by reference
ML21061A15626 February 2021Spent Fuel Storage Installation, Response to Request for Additional Information Regarding Application for Order Approving Indirect Transfers of Control of Licenses
ML21005A27129 December 2020102-08208 PVNGS Communication Required by Confirmatory Order EA-20-054Finite Element Analysis
COVID-19
ML20090L94430 March 2020APS Response to Request for Additional Information- Relief Request 65 Unit 2, COVID-19, Request for Relief from Bottom Mounted Instrumentation Nozzles and a Pressurizer Nozzle to SurgeBoric Acid
Weld Overlay
Pandemic
COVID-19
Pressure Boundary Leakage
Through-Wall Leak
Dissimilar Metal Weld
ML20073R75313 March 2020Independent Spent Fuel Storage Installation (ISFSI) - APS Response to Request for Additional Information for Changes to PVNGS Emergency Plan Staffing RequirementsFLEX
Severe Accident Management Guideline
Minimum staff
ML20054A26919 February 2020Response to Request for Additional Information - Relief Request 64 - Unit 1 Impractical Examinations for the Third 10-Year Inservice Inspection Interval
ML19340B2146 December 2019Response to NRC Request for Additional Information Regarding 2019 Steam Generator Tube Inspections
ML19331A36126 November 2019Supplemental Response to NRC Request for Additional Information Regarding License Amendment and Exemption Requests Related to the Implementation of Framatome CE16HTP FuelBoric Acid
Shutdown Margin
Loop seal
Anticipated operational occurrence
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Nondestructive Examination
Time Critical Operator Action
Exemption Request
Earthquake
ML19277J4574 October 2019Response to NRC Request for Additional Information Regarding License Amendment and Exemption Requests Related to the Implementation of Framatome CE16HTP FuelBoric Acid
Shutdown Margin
Loop seal
Anticipated operational occurrence
Post Accident Monitoring
Coatings
Nondestructive Examination
Time Critical Operator Action
Exemption Request
Earthquake
Flow Induced Vibration
Power Uprate
Exclusive Use
Affidavit
ML19165A14014 June 2019Response to Request for Additional Information - Relief Request 63 - Unit 3 Impractical Examinations for the Third 10-Year Inservice Inspection Interval
ML19137A11817 May 2019Response to NRC Staff Request for Additional Information from Reactor Assessment and Human Performance Branch Regarding License Amendment and Exemption Requests Related to the Implementation of Framatome High ThermalExemption Request
ML19074A13814 March 2019Response to Request for Additional Information - Relief Request 62 - Third and Fourth 10-Year Inservice Inspection Intervals, Proposed Alternative - Pressurizer Heater Sleeve Repairs
ML19031C90531 January 2019Supplemental License Amendment Request to Revise Technical Specifications Regarding Response Time Testing of Pressure Transmitters and Request for Additional Information ResponseSurveillance Frequency Control Program
ML18296A46618 October 2018Supplemental Information Regarding License Amendment Request and Exemption Request to Support the Implementation of Framatome High Thermal Performance FuelExemption Request
Fuel cladding
ML18278A2955 October 2018Response to Request for Additional Information for Risk-Informed Completion Times Supplemental Responses for Items 17.f and 21Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Cable Tray Ignition
ML18264A31821 September 2018Response to Request for Additional Information for Risk-Informed Completion TimesProbabilistic Risk Assessment
Temporary Modification
FLEX
Offsite Circuit
ML18194A91413 July 2018Supplemental Response to Request for Additional Information 3.a for License Amendment Request to Adopt 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and ComponentsProbabilistic Risk Assessment
ML18152B8741 June 2018Response to Electrical Engineering Operating Reactor Branch (Eeob) Request for Additional Information for Risk-Informed Completion TimesProbabilistic Risk Assessment
FLEX
ML18138A48018 May 2018Response to Request for Additional Information for Risk-Informed Completion TimesHot Short
Safe Shutdown
Ultimate heat sink
Mission time
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
FLEX
Thermoset
Large early release frequency
Fire Protection Program
Very Early Warning Fire Detection
ML18129A4489 May 2018APS Response to Request for Additional Information for License Amendment Request to Adopt 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and ComponentsSafe Shutdown
High winds
Mission time
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
FLEX
Tornado Missile Protection
Thermoset
Large early release frequency
Risk-Informed Steering Committee
Earthquake
ML17272B03329 September 2017Response to Request for Additional Information Regarding Fourth 10-Year Interval Pump and Valve Inservice Testing Program Relief Requests
ML17153A3732 June 2017Response to NRC Staff Request for Additional Information Regarding License Amendment and Exemption Requests Related to the Implementation of Next Generation FuelBoric Acid
Shutdown Margin
Anticipated operational occurrence
Exemption Request
Fuel cladding
Coast down
ML17144A37624 May 2017Supplemental Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis
ML17002A0012 January 2017Response to NRC Requests for Additional Information (Rais) Regarding Emergency License Amendment Request (LAR) to Extend Diesel Generator 3B Completion TimeProbabilistic Risk Assessment
Arc flash
FLEX
Job Performance Measure
Continuous fire watch
Fire Watch
ML17066A1842 January 2017Response to NRC Requests for Additional Information (Rais) Regarding Emergency License Amendment Request (LAR) to Extend Diesel Generator 3B Completion TimeProbabilistic Risk Assessment
Nondestructive Examination
Arc flash
FLEX
Job Performance Measure
Continuous fire watch
Fire Watch
ML16358A71523 December 2016Response to Request for Additional Information Regarding Emergency License Amendment Request for a One-Time Extension of the Diesel Generator Completion Time
ML16340A9881 December 2016Addendum to Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water ReactorsMission time
Safe Shutdown Earthquake
Hydrostatic
Coatings
Fuel cladding
ML17167A21523 November 2016Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis - Revised ...
ML16321A0029 November 2016Response to RAI, Amendment Request to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis - Revised Technical Specifications and Bases and WCAP-18030, Revision 1
ML16300A15626 October 2016Response to NRC Electrical Engineering Branch Staff Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Related to Degraded and Loss of Voltage Relay ...Probabilistic Risk Assessment
Operator Manual Action
ML16286A2426 October 2016Westinghouse Electric Company, WCAP-18030-NP Review, Suggested Response to Request for Additional Information
ML16286A2406 October 2016Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Incorporate Updated Criticality Safety AnalysisFuel cladding
Affidavit
ML16257A5449 September 2016Response to NRC Instrumentation and Controls Staff Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Related to Degraded and Loss of Voltage Relay ModificationsProbabilistic Risk Assessment
ML16203A38121 July 2016Response to NRC Staff Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Related to Degraded and Loss of Voltage Relay ModificationsProbabilistic Risk Assessment
Operator Manual Action
ML16182A51930 June 2016Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Incorporate Updated Critical Safety AnalysisProbabilistic Risk Assessment
ML16147A09220 May 2016Response to Request for Additional Information Regarding Relief Request 54, Alternative to Flaw RemovalSafe Shutdown
Boric Acid
Shutdown Margin
Nondestructive Examination
Earthquake
Liquid penetrant
ML16133A62112 May 2016ISFSI - Response to Request for Additional Information Regarding Proposed Changes to Emergency Action LevelsSafe Shutdown
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Battery sizing
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Power change
ML16102A46311 April 2016Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505Probabilistic Risk Assessment
ML16029A50629 January 2016Response to Request for Additional Information Regarding the Request to Change the Quality Assurance Program Description
ML15273A47030 September 2015IR 05000528/2015004, 05000529/2015004, and 05000530/2015004; 11/16/2015 - 11/20/2015; Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Notification of NRC Triennial Heat Sink Performance InspectionUltimate heat sink
ML15258A84815 September 2015Response to Request for Additional Information Regarding Exigent License Amendment Request to Amend Technical Specification Surveillance Requirement 3.1.5.3
ML15223A2066 August 2015Response to Request for Additional Information Associated with Seismic Hazard and Screening ReportEarthquake
ML16133A3261 May 2015Response to NRC Request for Flood Hazard Reevaluation Model FilesFukushima Dai-Ichi
ML18192A38931 December 1975Public Service Company of New Mexico 1974 Annual Report, as Response to Request for Additional Financial Information
ML18192B27821 October 1975Response to NRC Liquefaction Questions. Review of Liquefaction Analysis in Parallel with the Site Dewatering Program