Issue date | Title | Topic | |
---|---|---|---|
ML24012A245 | 12 January 2024 | Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line | |
ML23299A305 | 26 October 2023 | Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle | |
ML23048A320 | 17 February 2023 | Response to NRC Requests for Additional Information Regarding 2022 Unit 1 Steam Generator Tube Inspections | |
ML22090A080 | 31 March 2022 | Response to NRC Requests for Additional Information Regarding 2021 Unit 3 Steam Generator Tube Inspections | |
ML22053A212 | 22 February 2022 | Response to Requests for Confirmation of Information for Exemption from Certain Requirements of 10 CFR 50.62(c)(1) Using Risk-Informed Process for Evaluations | Exemption Request |
ML21173A360 | 22 June 2021 | Response to Request for Additional Information for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | Incorporated by reference |
ML21061A156 | 26 February 2021 | Spent Fuel Storage Installation, Response to Request for Additional Information Regarding Application for Order Approving Indirect Transfers of Control of Licenses | |
ML21005A271 | 29 December 2020 | 102-08208 PVNGS Communication Required by Confirmatory Order EA-20-054 | Finite Element Analysis COVID-19 |
ML20090L944 | 30 March 2020 | APS Response to Request for Additional Information- Relief Request 65 Unit 2, COVID-19, Request for Relief from Bottom Mounted Instrumentation Nozzles and a Pressurizer Nozzle to Surge | Boric Acid Weld Overlay Pandemic COVID-19 Pressure Boundary Leakage Through-Wall Leak Dissimilar Metal Weld |
ML20073R753 | 13 March 2020 | Independent Spent Fuel Storage Installation (ISFSI) - APS Response to Request for Additional Information for Changes to PVNGS Emergency Plan Staffing Requirements | FLEX Severe Accident Management Guideline Minimum staff |
ML20054A269 | 19 February 2020 | Response to Request for Additional Information - Relief Request 64 - Unit 1 Impractical Examinations for the Third 10-Year Inservice Inspection Interval | |
ML19340B214 | 6 December 2019 | Response to NRC Request for Additional Information Regarding 2019 Steam Generator Tube Inspections | |
ML19331A361 | 26 November 2019 | Supplemental Response to NRC Request for Additional Information Regarding License Amendment and Exemption Requests Related to the Implementation of Framatome CE16HTP Fuel | Boric Acid Shutdown Margin Loop seal Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Coatings Operating Basis Earthquake Nondestructive Examination Time Critical Operator Action Exemption Request Earthquake |
ML19277J457 | 4 October 2019 | Response to NRC Request for Additional Information Regarding License Amendment and Exemption Requests Related to the Implementation of Framatome CE16HTP Fuel | Boric Acid Shutdown Margin Loop seal Anticipated operational occurrence Post Accident Monitoring Coatings Nondestructive Examination Time Critical Operator Action Exemption Request Earthquake Flow Induced Vibration Power Uprate Exclusive Use Affidavit |
ML19165A140 | 14 June 2019 | Response to Request for Additional Information - Relief Request 63 - Unit 3 Impractical Examinations for the Third 10-Year Inservice Inspection Interval | |
ML19137A118 | 17 May 2019 | Response to NRC Staff Request for Additional Information from Reactor Assessment and Human Performance Branch Regarding License Amendment and Exemption Requests Related to the Implementation of Framatome High Thermal | Exemption Request |
ML19074A138 | 14 March 2019 | Response to Request for Additional Information - Relief Request 62 - Third and Fourth 10-Year Inservice Inspection Intervals, Proposed Alternative - Pressurizer Heater Sleeve Repairs | |
ML19031C905 | 31 January 2019 | Supplemental License Amendment Request to Revise Technical Specifications Regarding Response Time Testing of Pressure Transmitters and Request for Additional Information Response | Surveillance Frequency Control Program |
ML18296A466 | 18 October 2018 | Supplemental Information Regarding License Amendment Request and Exemption Request to Support the Implementation of Framatome High Thermal Performance Fuel | Exemption Request Fuel cladding |
ML18278A295 | 5 October 2018 | Response to Request for Additional Information for Risk-Informed Completion Times Supplemental Responses for Items 17.f and 21 | Internal Flooding Probabilistic Risk Assessment Large early release frequency Cable Tray Ignition |
ML18264A318 | 21 September 2018 | Response to Request for Additional Information for Risk-Informed Completion Times | Probabilistic Risk Assessment Temporary Modification FLEX Offsite Circuit |
ML18194A914 | 13 July 2018 | Supplemental Response to Request for Additional Information 3.a for License Amendment Request to Adopt 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components | Probabilistic Risk Assessment |
ML18152B874 | 1 June 2018 | Response to Electrical Engineering Operating Reactor Branch (Eeob) Request for Additional Information for Risk-Informed Completion Times | Probabilistic Risk Assessment FLEX |
ML18138A480 | 18 May 2018 | Response to Request for Additional Information for Risk-Informed Completion Times | Hot Short Safe Shutdown Ultimate heat sink Mission time Fire Barrier Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake FLEX Thermoset Large early release frequency Fire Protection Program Very Early Warning Fire Detection |
ML18129A448 | 9 May 2018 | APS Response to Request for Additional Information for License Amendment Request to Adopt 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components | Safe Shutdown High winds Mission time Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake FLEX Tornado Missile Protection Thermoset Large early release frequency Risk-Informed Steering Committee Earthquake |
ML17272B033 | 29 September 2017 | Response to Request for Additional Information Regarding Fourth 10-Year Interval Pump and Valve Inservice Testing Program Relief Requests | |
ML17153A373 | 2 June 2017 | Response to NRC Staff Request for Additional Information Regarding License Amendment and Exemption Requests Related to the Implementation of Next Generation Fuel | Boric Acid Shutdown Margin Anticipated operational occurrence Exemption Request Fuel cladding Coast down |
ML17144A376 | 24 May 2017 | Supplemental Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis | |
ML17002A001 | 2 January 2017 | Response to NRC Requests for Additional Information (Rais) Regarding Emergency License Amendment Request (LAR) to Extend Diesel Generator 3B Completion Time | Probabilistic Risk Assessment Arc flash FLEX Job Performance Measure Continuous fire watch Fire Watch |
ML17066A184 | 2 January 2017 | Response to NRC Requests for Additional Information (Rais) Regarding Emergency License Amendment Request (LAR) to Extend Diesel Generator 3B Completion Time | Probabilistic Risk Assessment Nondestructive Examination Arc flash FLEX Job Performance Measure Continuous fire watch Fire Watch |
ML16358A715 | 23 December 2016 | Response to Request for Additional Information Regarding Emergency License Amendment Request for a One-Time Extension of the Diesel Generator Completion Time | |
ML16340A988 | 1 December 2016 | Addendum to Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | Mission time Safe Shutdown Earthquake Hydrostatic Coatings Fuel cladding |
ML17167A215 | 23 November 2016 | Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis - Revised ... | |
ML16321A002 | 9 November 2016 | Response to RAI, Amendment Request to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis - Revised Technical Specifications and Bases and WCAP-18030, Revision 1 | |
ML16300A156 | 26 October 2016 | Response to NRC Electrical Engineering Branch Staff Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Related to Degraded and Loss of Voltage Relay ... | Probabilistic Risk Assessment Operator Manual Action |
ML16286A242 | 6 October 2016 | Westinghouse Electric Company, WCAP-18030-NP Review, Suggested Response to Request for Additional Information | |
ML16286A240 | 6 October 2016 | Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis | Fuel cladding Affidavit |
ML16257A544 | 9 September 2016 | Response to NRC Instrumentation and Controls Staff Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Related to Degraded and Loss of Voltage Relay Modifications | Probabilistic Risk Assessment |
ML16203A381 | 21 July 2016 | Response to NRC Staff Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Related to Degraded and Loss of Voltage Relay Modifications | Probabilistic Risk Assessment Operator Manual Action |
ML16182A519 | 30 June 2016 | Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Incorporate Updated Critical Safety Analysis | Probabilistic Risk Assessment |
ML16147A092 | 20 May 2016 | Response to Request for Additional Information Regarding Relief Request 54, Alternative to Flaw Removal | Safe Shutdown Boric Acid Shutdown Margin Nondestructive Examination Earthquake Liquid penetrant |
ML16133A621 | 12 May 2016 | ISFSI - Response to Request for Additional Information Regarding Proposed Changes to Emergency Action Levels | Safe Shutdown Time of Discovery High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Battery sizing Earthquake Fuel cladding Pressure Boundary Leakage Grace period Power change |
ML16102A463 | 11 April 2016 | Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505 | Probabilistic Risk Assessment |
ML16029A506 | 29 January 2016 | Response to Request for Additional Information Regarding the Request to Change the Quality Assurance Program Description | |
ML15273A470 | 30 September 2015 | IR 05000528/2015004, 05000529/2015004, and 05000530/2015004; 11/16/2015 - 11/20/2015; Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Notification of NRC Triennial Heat Sink Performance Inspection | Ultimate heat sink |
ML15258A848 | 15 September 2015 | Response to Request for Additional Information Regarding Exigent License Amendment Request to Amend Technical Specification Surveillance Requirement 3.1.5.3 | |
ML15223A206 | 6 August 2015 | Response to Request for Additional Information Associated with Seismic Hazard and Screening Report | Earthquake |
ML16133A326 | 1 May 2015 | Response to NRC Request for Flood Hazard Reevaluation Model Files | Fukushima Dai-Ichi |
ML18192A389 | 31 December 1975 | Public Service Company of New Mexico 1974 Annual Report, as Response to Request for Additional Financial Information | |
ML18192B278 | 21 October 1975 | Response to NRC Liquefaction Questions. Review of Liquefaction Analysis in Parallel with the Site Dewatering Program |