MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle ML23048A3202023-02-17017 February 2023 Response to NRC Requests for Additional Information Regarding 2022 Unit 1 Steam Generator Tube Inspections ML22090A0802022-03-31031 March 2022 Response to NRC Requests for Additional Information Regarding 2021 Unit 3 Steam Generator Tube Inspections ML22053A2122022-02-22022 February 2022 Response to Requests for Confirmation of Information for Exemption from Certain Requirements of 10 CFR 50.62(c)(1) Using Risk-Informed Process for Evaluations ML21173A3602021-06-22022 June 2021 Response to Request for Additional Information for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML21061A1562021-02-26026 February 2021 Spent Fuel Storage Installation, Response to Request for Additional Information Regarding Application for Order Approving Indirect Transfers of Control of Licenses ML21005A2712020-12-29029 December 2020 102-08208 PVNGS Communication Required by Confirmatory Order EA-20-054 ML20090L9442020-03-30030 March 2020 APS Response to Request for Additional Information- Relief Request 65 Unit 2, COVID-19, Request for Relief from Bottom Mounted Instrumentation Nozzles and a Pressurizer Nozzle to Surge ML20073R7532020-03-13013 March 2020 Independent Spent Fuel Storage Installation (ISFSI) - APS Response to Request for Additional Information for Changes to PVNGS Emergency Plan Staffing Requirements ML20054A2692020-02-19019 February 2020 Response to Request for Additional Information - Relief Request 64 - Unit 1 Impractical Examinations for the Third 10-Year Inservice Inspection Interval ML19340B2142019-12-0606 December 2019 Response to NRC Request for Additional Information Regarding 2019 Steam Generator Tube Inspections ML19331A3612019-11-26026 November 2019 Supplemental Response to NRC Request for Additional Information Regarding License Amendment and Exemption Requests Related to the Implementation of Framatome CE16HTP Fuel ML19277J4572019-10-0404 October 2019 Response to NRC Request for Additional Information Regarding License Amendment and Exemption Requests Related to the Implementation of Framatome CE16HTP Fuel ML19165A1402019-06-14014 June 2019 Response to Request for Additional Information - Relief Request 63 - Unit 3 Impractical Examinations for the Third 10-Year Inservice Inspection Interval ML19137A1182019-05-17017 May 2019 Response to NRC Staff Request for Additional Information from Reactor Assessment and Human Performance Branch Regarding License Amendment and Exemption Requests Related to the Implementation of Framatome High Thermal ML19074A1382019-03-14014 March 2019 Response to Request for Additional Information - Relief Request 62 - Third and Fourth 10-Year Inservice Inspection Intervals, Proposed Alternative - Pressurizer Heater Sleeve Repairs ML19031C9052019-01-31031 January 2019 Supplemental License Amendment Request to Revise Technical Specifications Regarding Response Time Testing of Pressure Transmitters and Request for Additional Information Response ML18296A4662018-10-18018 October 2018 Supplemental Information Regarding License Amendment Request and Exemption Request to Support the Implementation of Framatome High Thermal Performance Fuel ML18278A2952018-10-0505 October 2018 Response to Request for Additional Information for Risk-Informed Completion Times Supplemental Responses for Items 17.f and 21 ML18264A3182018-09-21021 September 2018 Response to Request for Additional Information for Risk-Informed Completion Times ML18194A9142018-07-13013 July 2018 Supplemental Response to Request for Additional Information 3.a for License Amendment Request to Adopt 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components ML18152B8742018-06-0101 June 2018 Response to Electrical Engineering Operating Reactor Branch (Eeob) Request for Additional Information for Risk-Informed Completion Times ML18138A4802018-05-18018 May 2018 Response to Request for Additional Information for Risk-Informed Completion Times ML18129A4482018-05-0909 May 2018 APS Response to Request for Additional Information for License Amendment Request to Adopt 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components ML17272B0332017-09-29029 September 2017 Response to Request for Additional Information Regarding Fourth 10-Year Interval Pump and Valve Inservice Testing Program Relief Requests ML17153A3732017-06-0202 June 2017 Response to NRC Staff Request for Additional Information Regarding License Amendment and Exemption Requests Related to the Implementation of Next Generation Fuel ML17144A3762017-05-24024 May 2017 Supplemental Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis ML17002A0012017-01-0202 January 2017 Response to NRC Requests for Additional Information (Rais) Regarding Emergency License Amendment Request (LAR) to Extend Diesel Generator 3B Completion Time ML17066A1842017-01-0202 January 2017 Response to NRC Requests for Additional Information (Rais) Regarding Emergency License Amendment Request (LAR) to Extend Diesel Generator 3B Completion Time ML16358A7152016-12-23023 December 2016 Response to Request for Additional Information Regarding Emergency License Amendment Request for a One-Time Extension of the Diesel Generator Completion Time ML16340A9882016-12-0101 December 2016 Addendum to Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML17167A2152016-11-23023 November 2016 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis - Revised ... ML16321A0022016-11-0909 November 2016 Response to RAI, Amendment Request to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis - Revised Technical Specifications and Bases and WCAP-18030, Revision 1 ML16300A1562016-10-26026 October 2016 Response to NRC Electrical Engineering Branch Staff Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Related to Degraded and Loss of Voltage Relay ... ML16286A2422016-10-0606 October 2016 Westinghouse Electric Company, WCAP-18030-NP Review, Suggested Response to Request for Additional Information ML16286A2402016-10-0606 October 2016 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis ML16257A5442016-09-0909 September 2016 Response to NRC Instrumentation and Controls Staff Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Related to Degraded and Loss of Voltage Relay Modifications ML16203A3812016-07-21021 July 2016 Response to NRC Staff Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Related to Degraded and Loss of Voltage Relay Modifications ML16182A5192016-06-30030 June 2016 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Incorporate Updated Critical Safety Analysis ML16147A0922016-05-20020 May 2016 Response to Request for Additional Information Regarding Relief Request 54, Alternative to Flaw Removal ML16133A6212016-05-12012 May 2016 ISFSI - Response to Request for Additional Information Regarding Proposed Changes to Emergency Action Levels ML16102A4632016-04-11011 April 2016 Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505 ML16029A5062016-01-29029 January 2016 Response to Request for Additional Information Regarding the Request to Change the Quality Assurance Program Description ML15273A4702015-09-30030 September 2015 IR 05000528/2015004, 05000529/2015004, and 05000530/2015004; 11/16/2015 - 11/20/2015; Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Notification of NRC Triennial Heat Sink Performance Inspection ML15258A8482015-09-15015 September 2015 Response to Request for Additional Information Regarding Exigent License Amendment Request to Amend Technical Specification Surveillance Requirement 3.1.5.3 ML15223A2062015-08-0606 August 2015 Response to Request for Additional Information Associated with Seismic Hazard and Screening Report ML16133A3262015-05-0101 May 2015 Response to NRC Request for Flood Hazard Reevaluation Model Files ML18192A3891975-12-31031 December 1975 Public Service Company of New Mexico 1974 Annual Report, as Response to Request for Additional Financial Information ML18192B2781975-10-21021 October 1975 Response to NRC Liquefaction Questions. Review of Liquefaction Analysis in Parallel with the Site Dewatering Program 2024-01-12
[Table view] |
See also: IR 05000528/2015004
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD.
ARLINGTON, TX 76011-4511
September 30, 2015
Randall K. Edington
Executive Vice President, Nuclear/CNO
Palo Verde Nuclear Generating Station
P.O. Box 52034, MS 7602
Phoenix, AZ 85072-2034
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
NOTIFICATION OF NRC TRIENNIAL HEAT SINK PERFORMANCE
INSPECTION (05000528/2015004 and 05000529/2015004 and
05000530/2015004) AND REQUEST FOR INFORMATION
Dear Mr. Edington:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
staff will conduct a triennial heat sink performance inspection at the Palo Verde Nuclear
Generating Station from November 16 - 20, 2015. The inspection will consist of two reactor
inspectors from the NRCs Region IV office for one week. The inspection will be conducted in
accordance with the NRCs Inspection Procedure 71111.07, Heat Sink Performance.
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Please note that the documents requested are to be provided by November 9, 2015. We
request that during the onsite inspection week you ensure that copies of analyses, evaluations,
or documentation regarding the implementation and maintenance of your heat exchanger
program are available. Of specific interest are those documents that establish that your heat
exchanger program satisfies the NRCs regulatory requirements and conforms to applicable
NRC guidance. Also, appropriate personnel knowledgeable of safety-related heat exchangers
should be available to support the inspectors at the site during the inspection.
We have discussed the schedule for this inspection activity with your staff and understand that
our regulatory contact for this inspection will be Nawaporn AaronsCooke of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the lead inspector, Chris Smith, by telephone at 817.200.1095 or by e-mail at
chris.smith@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control
number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
R. K. Edington -2-
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket No(s): 50-528, 50-529, 50-530
License No(s): NPF-41, NPF-51, NPF-74
Attachment:
Triennial Heat Sink Performance Inspection
Request for Information
Electronic Distribution for the Palo Verde Nuclear Generating Station
Request for Information
Triennial Heat Sink Performance Inspection
Palo Verde Nuclear Generating Station
Inspection Report: 05000528/2015-004
05000529/2015-004
05000530/2015-004
Inspection Dates: November 16 - 20, 2015
Inspection Procedure: IP 71111.07, Triennial Heat Sink Performance
Inspector: Chris Smith, Reactor Inspector
Jonathan Braisted, Reactor Inspector
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format (Certrec IMS preferred), to the attention of Chris Smith, by November 9, 2015. The
inspectors will select specific items from the information requested below and then request from
your staff additional documents needed during the onsite inspection week. Also, we request
that you categorize the documents in your response with the numbered list below. Please
provide requested documentation electronically if possible. If requested documents are large
and only hard copy formats are available, please inform the inspectors, and provide subject
documentation during the first day of the onsite inspection. If you have any questions regarding
this information request, please call the lead inspector as soon as possible.
The following heat exchangers/heat sinks have been selected for inspection:
- Unit 2 train A diesel jacket water heat exchanger
- Unit 3 train A essential cooling water heat exchanger
For all Generic Letter 89-13 exchangers:
1. List of corrective action program documents (with a short description) associated with
Generic Letter 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat
exchanger cavitation, or heat exchanger testing, in the previous three years
2. System health report(s) and maintenance rule system notebooks for all the Generic
Letter 89-13 heat exchangers
3. Copy of any self-assessments done on any Generic Letter 89-13 heat exchangers in the
previous three years
4. Copies of any procedures developed to implement the recommendations of Generic
Letter 89-13, e.g., the Generic Letter 89-13 Heat Exchanger Program description
-1- Attachment
5. Copies of any commitments to the Generic Letter 89-13 program
For the specific heat exchangers selected:
Testing Documents
6. Copies of the two most recent completed tests confirming thermal performance for those
heat exchangers which are performance tested
7. Instrument uncertainties of the instruments used during testing
8. Copy of any operability determinations or other documentation of degradation
associated with the heat exchangers or the systems that support the operation for the
selected heat exchangers
9. Documents that show the as-found results are recorded, evaluated, and appropriately
dispositioned such that the as-left condition is acceptable
Cleaning Documents
10. The cleaning and inspection maintenance schedule for each heat exchanger for the next
five years
11. Copy of the document describing the inspection results for the last two cleaning and
inspection activities completed on each heat exchanger
12. Cleaning procedures with acceptance criteria for the selected heat exchangers
13. Copies of the documents that verify the structural integrity of the heat exchanger, e.g.,
eddy current summary sheets, ultrasonic testing results, and visual inspection results
14. Copies of those documents that describe the methods taken to control water chemistry
in the heat exchangers
Design Documents
15. Copies of the design basis documents and updated final safety analysis report pages for
the selected heat exchangers
16. Provide a list of calculations with a description which currently apply to each heat
exchanger
17. Copies of vendor data sheets and design basis data for the selected heat exchangers
18. Copy of the calculation which establishes the limiting (maximum) design basis heat load
which is required to be removed by each of these heat exchangers
19. Copy of the calculation which correlates surveillance testing results from these heat
exchangers with design basis heat removal capability (e.g., basis for surveillance test
acceptance criteria)
-2-
20. Copy of the calculations or documents which evaluate the potential for water hammer or
excessive tube vibration in the heat exchanger or associated piping
21. Copy of the document which identifies the current number of tubes in service for each
heat exchanger and the supporting calculation which establishes the maximum number
of tubes which can be plugged in each heat exchanger
22. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes
which are identified in each heat exchanger
For the ultimate heat sink or safety-related service water system:
23. Dam inspections that monitor the integrity of the ultimate heat sink (if applicable)
24. Copies of calculations and surveillances that determine the ultimate heat sink reservoir
capacity and heat transfer capability (if applicable)
25. Copies of any design changes performed on the ultimate heat sink or safety-related
service water system
26. Copies of procedures for a loss of ultimate heat sink or safety-related service water
system
27. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells,
debris, etc.) and aquatic life
28. Copies of inspections and/or maintenance related to preventing biotic fouling
29. Copies of procedures and/or test results to survey or monitor interface valves between
the safety-related section of the service water system and the nonsafety related section
30. Copy of the most recent service water flow balance test results, both as-found and as-
left
31. History of any thru-wall pipe leaks on the safety-related service water system
Inspector Contact Information:
Chris Smith, Reactor Inspector Mailing Address:
817-200-1095 U.S. NRC, Region IV
chris.smith@nrc.gov 1600 East Lamar Blvd.
Arlington, TX 76011-4511
Attn: Chris Smith
-3-
ML15273A470
SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword
By: Yes No Non-Sensitive Publicly Available NRC-002
OFFICE DRS/RI:EB1 RI/EB1 C:
NAME CSmith JBraisted TFarnholtz
SIGNATURE /RA/ Email /RA/
DATE 9/30/15 9/30/15 9/30/15
Letter to Randall K. Edington from Thomas R. Farnholtz, dated September 30, 2015
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
NOTIFICATION OF NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
(05000528/2015004 and 05000529/2015004 and 05000530/2015004) AND
REQUEST FOR INFORMATION