ML10050080028 February 1997Conditional Extension of Rod Misalignment TS for Indian Point 3.Shutdown Margin
ML20079F91831 May 1991Structural Evaluation of Indian Point,Units 2 & 3 Pressurizer Surge Lines,Considering Effects of Thermal StratificationFinite Element Analysis
Affidavit
Thermal fatigue
ML20059E94631 August 1990Nonproprietary Rev 2 to Indian Point 2 Tube Fatigue Reevaluation
ML20059G20131 July 1990Final Rept on Steam Generator Insp, Repair & Restoration Efforts During 1990 Midcycle Insp
ML20058K41530 June 1990Steam Generator Insp,Repair & Restoration Program Presentation to NrcFeedwater Heater
Stress corrosion cracking
Liquid penetrant
ML20058K41230 June 1990Status Rept,Indian Point Unit 2 Mid-Cycle Steam Generator Insp Presentation to NrcLiquid penetrant
ML20043A48930 May 1990Nonproprietary Indian Point Unit 2 Steam Generator Insp, Repair & Restoration Program.Feedwater Heater
Stress corrosion cracking
Liquid penetrant
ML19332B93730 November 1989Nonproprietary Info Presented to NRC Re Indian Point Unit 2 Steam Generator Secondary Side Loose Objects.
ML19332D66631 October 1989Nonproprietary Rev 2 to Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage.Feedwater Heater
Liquid penetrant
Pressure Boundary Leakage
ML20247J81631 July 1989Safety Evaluation for UHS Temp Increase to 95 F at Indian Point Unit 3
ML20248D36330 June 1989Rev 1,to Indian Point Unit 3 Reactor Vessel Fluence & Ref Temp PTS Evaluations
ML20248B31730 June 1989Rev 1 to Nonproprietary WCAP-12294, Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept,Spring 1989 OutageFeedwater Heater
Liquid penetrant
Pressure Boundary Leakage
ML20247J80731 May 1989Containment Margin Improvement Analysis for Indian Point Unit 3Shutdown Margin
Stroke time
ML20247N53331 May 1989Nonproprietary Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage
ML20248F42131 March 1989NSSS Stretch Rating-3,083.4 Mwt Licensing ReptBoric Acid
Shutdown Margin
Ultimate heat sink
Feedwater Heater
Fuel cladding
Coast down
ML20151N78831 July 1988Rev 1 to Charpy Toughness & Brittle Transition Temp Characterization of HAZ High Hardness Zone of Indian Point Unit 2 Steam Generator Girth Weld by Gleeble Weld Thermal Cycle Simulation
ML20006B47431 May 1988Nonproprietary Indian Point Unit 2 Evaluation for Tube Vibration Induced Fatigue.
ML20151N78231 May 1988Fracture Sensitivity Study of Girth Weld 6 Repaired Configuration,Indian Point Unit 2Hydrostatic
ML20154M35731 December 1986Rev 2 to Technical Bases for Eliminating Large Primary Loop Pipe Rupture as Structural Design Basis for Indian Point Unit 2Safe Shutdown
Safe Shutdown Earthquake
Stress corrosion cracking
Exemption Request
Pressure boundary leak
Water hammer
ML20141N88831 January 1986Nonproprietary Rev 1 to Safety Evaluation for Indian Point Unit 3 W/Asymmetric Tube Plugging Among Steam GeneratorsShutdown Margin
ML20137L79131 January 1986Reactor Vessel Fluence & Rt Pressurized Thermal Shock (PTS) Evaluations
ML20112J70331 October 1984Nonproprietary Safety Evaluation for Indian Point Unit 3 W/Asymmetric Tube Plugging Among Steam GeneratorsShutdown Margin
Coast down
Affidavit
ML20096H01331 August 1984Nonproprietary Fracture Mechanics Evaluation of Inservice Insp Indication Indian Point Unit 2 Reactor VesselHydrostatic
ML20023B32730 September 1982Nonproprietary Indian Point Unit 3 Steam Generator Sleeving Rept. Proprietary Info Deleted