ML20207H80730 June 1999Rev 0 to WCAP-15178, Byron Unit 2 Heatup & Cooldowm Limit Curves for Normal OperationsAnticipated operational occurrence
Hydrostatic
ML20207H79430 June 1999Rev 0 to WCAP-15180, Commonwealth Edison Co Byron,Unit 2 Surveillance Program Credibility Evaluation
ML20207H78530 June 1999Rev 0 to WCAP-15183, Commonwealth Edison Co Byron,Unit 1 Surveillance Program Credibility Evaluation
ML20207H77730 June 1999Rev 0 to WCAP-15177, Evaluation of Pressurized Thermal Shock for Byron,Unit 2
ML20207H80130 November 1998Rev 0 to WCAP-15124, Byron Unit 1 Heatup & Cooldown Limit Curves for Normal OperationAnticipated operational occurrence
Hydrostatic
ML20207H77330 November 1998Rev 0 to WCAP-15125, Evaluation of Pressurized Thermal Shock for Byron,Unit 1
ML20202F83930 November 1997Non-proprietary,Rev 2 to WCAP-14824, Byron Unit 1 Heatup & Cooldown Limit Curves for Normal Operation & Surveillance Weld Metal Integration for Byron & BraidwoodAnticipated operational occurrence
Hydrostatic
ML20199E82831 October 1997Heatup & Cooldown Limit Curves for Normal OperationAnticipated operational occurrence
Hydrostatic
ML20199E85331 October 1997Heatup & Cooldown Limit Curves for Normal OperationAnticipated operational occurrence
Hydrostatic
ML20141A46830 April 1997Rev 1 to Byron Unit 1 Heatup & Cooldown Limit Curves for Normal Operation & Surveillance Weld Metal Integration for Byron & BraidwoodHydrostatic
ML20211D95430 September 1996Non-proprietary Probabilistic Analysis of Reduction in Turbine Valve in Test Frequency for Nuclear Plants W/ Westinghouse BB-296 Turbine W/Steam ChestsTurbine Missile
ML20108D24630 April 1996Nonproprietary Technical Justificaton for Eliminating Large Primary Loop Pipe Rupture as Structural Design Basis for Byron & Braidwood Units 1 & 2 Nuclear Power PlantsSafe Shutdown Earthquake
Hydrostatic
Exemption Request
Pressure Boundary Leakage
Pressure boundary leak
ML20096F29917 January 1996Non-proprietary Rev 0 to CEN-627-NP, Verification of Installation Process & Operating Performance of Abb Ceno SG Tube Sleeve for Use at Comm Ed Byron & Braidwood Units 1 & 2Hydrostatic
Finite Element Analysis
ML20093G96531 October 1995Nonproprietary Addendum 1 to Technical Support for Alternate Plugging Criteria W/Tube Expansion at TSP Intersections for Braidwood-1 & Byron-1 Model D4 SGs Addendum 1 TSP Analysis Using 'RELAP5' Loads
ML20086T35030 April 1995Nonproprietary Slide Presentation Matl NRC Meeting of 950223 Alternate Plugging Criteria W/Tube Expansion for Braidwood Unit 1 & Byron Unit 1 Model D4 Sgs
ML20080H35713 February 1995Technical Support for Alternate Plugging Criteria W/Tube Expansion at Tube Suppport Plate Intersections for Braidwood-1 & Byron-1 Model D4 ST for Feb 1995
ML20078Q15713 February 1995Non-proprietary Rev 2 to WCAP-14047, Braidwood Unit 1 Technical Support for Cycle 5 SG Interim Plugging CriteriaHydrostatic
Earthquake
ML20078J58330 November 1994Nonproprietary Braidwood Unit 1 & Byron Unit 1 Model D4 SG Limited Tube Support Plate Displacement Analysis in Support of Interim Plugging CriteriaHydrostatic
FLEX
ML20073B3461 June 1994Nonproprietary Topical Rept on Methodology,Verification & Applications of Computer Progra,GappipeEarthquake
ML20064N32131 March 1994Commonwealth Edison Co Byron & Braidwood Unit 1 & 2 Increased Sgtp/Reduced Tdf/Pmtc Analysis Program Engineering Licensing ReptBoric Acid
Shutdown Margin
Fuel cladding
Flow Induced Vibration
ML20069B47631 March 1994Non-proprietary Rev 0 to BAW-10196, W-D4 F* Qualification ReptBoric Acid
ML20056D89531 May 1993Nonproprietary Rev 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diameter Tube Feedring Type & Westinghouse Preheater SgsBoric Acid
Non-Destructive Examination
Hydrostatic
Finite Element Analysis
Liquid penetrant
Flow Induced Vibration
ML20077A31431 August 1992Nonproprietary Fracture Mechanics Evaluation Byron & Braidwood Units 1 & 2 Residual HX Tube Side Inlet & Outlet Nozzles
ML20141M45131 August 1992Nonproprietary Fracture Mechanics Evaluation,Byron Braidwood Units 1 & 2,Residual HX Tube Side Inlet & Outlet Nozzles
ML20090M83929 February 1992Nonproprietary Evaluation of Byron & Braidwood Units 1 & 2 Auxiliary Spray Lines Per NRC Bulletin 88-008Finite Element Analysis
ML20079P73031 October 1991Nonproprietary Byron Unit 1 & Braidwood Unit 1 Evaluation for Tube Vibration Induced FatigueFinite Element Analysis
Flow Induced Vibration
ML20044A96431 July 1990Rev 0 to Comm Ed Topical Rept on Benchmark of PWR Nuclear Design Methods Using PHOENIX-P & Advanced Nodal Code (Anc) Computer Codes.
ML20011E24731 October 1989Analysis of Capsule U from Comm Ed Byron Unit 2 Reactor Vessel Radiation Surveillance Program.
ML20090M83430 September 1989Nonproprietary Evaluation of Thermal Stratification for Byron & Braidwood Units 1 & 2 RHR LinesPacking leak
ML20129B54130 June 1989Reduction in Minimum Rhrs Flowrate During Mid-Loop Operation for Byron & Braidwood Power Plants Units 1 & 2Boric Acid
Shutdown Margin
ML20072H95131 December 1988Joint Westinghouse Owners Group/Westinghouse Program:Atws Rule Administration ProcessProbabilistic Risk Assessment
Failure to Scram
ML20198J57030 November 1988Non-proprietary WCAP-12046, Handbook on Flaw Evaluation for Zion,Byron & Braidwood,Units 1 & 2,Reactor Vessels
ML20154J98330 April 1988RCS Flow Anomaly Investigation Rept
ML20151U12730 November 1987Analysis of Capsule U from Comm Ed,Byron Unit 1 Reactor Vessel Radiation Surveillance Program
ML20237C40930 November 1987Nonproprietary Rev 2 to Byron/Braidwood T-Hot Reduction Final Licensing ReptBoric Acid
Loop seal
Turbine Missile
Fuel cladding
Flow Induced Vibration
ML20207H97630 November 1986Nonproprietary Resistance Temp Detector Bypass Elimination Licensing Rept for Byron 1 & 2 & Braidwood 1 & 2Hydrostatic
Nondestructive Examination
ML20205Q39831 March 1986Background & Technical Basis for Hand Book on Flaw Evaluation for Byron Units 1 & 2 Steam Generators & Pressurizers
ML20205Q41631 March 1986Handbook on Flaw Evaluation for Byron Units 1 & 2 Steam Generators & Pressurizers
ML20097J25231 May 1984Technical Bases for Eliminating Large Primary Loop Pipe Rupture as Structural Design Basis for Byron Units 1 & 2 & Braidwood Units 1 & 2
ML20084H13330 April 1984Vols 1 & 2 to Byron Generating Station Limiting Conditions for Operation Relaxation ProgramBoric Acid
Shutdown Margin
Ultimate heat sink
Mission time
Probabilistic Risk Assessment
ML20080B49529 July 1983Nonproprietary Version of Independent Evaluation of Proposed Mods to Westinghouse D4,D5 & E Steam GeneratorsOperating Basis Earthquake
Nondestructive Examination
Flow Induced Vibration
ML20052H67030 April 1982to Byron Units 1 & 2,Braidwood Units 1 & 2 Auxiliary Feedwater Sys Reliability Analysis, Final Rept