Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20235S24416 February 1989Suppl to 880104 Special Rept Re Inoperability of High Pressure Svc Water Diesel 1B.Fuel Supplu Sys Was Source of Problem.Fuel Supply Sys Will Be Replaced W/Above Ground Tanks for Both Diesels
ML20237C67830 November 1987Special Rept:On 871118,internal Portion of Fire Suppression Water Sys Removed from Svc to Replace Section of Piping.On 871120,piping Successfully Hydrostatically Tested & Fire Suppression Sys Returned to Svc
ML20236W27323 November 1987Special Rept:On 871028,following Initiation of 24 H Run for 18-month Diesel Generator Test,Emergency Diesel Generator 1B Stopped Running.No Cause for Trip Determined.Procedure Will Be Revised So Alarm Conditions Tested Before Run
ML20236X00818 November 1987Special Rept Re Inoperability of Fire Suppression Water Sys. Internal Portion of Sys Removed from Svc on 871118 to Replace Section of Piping.Initially Reported on 871118.Plant Permanently Shut Down & Reactor Defueled
ML20236Y21515 May 1987Special Rept 87-02:on 870216,reactor Manually Scrammed Due to Erroneous Indication of Low Voltage on Turbine Bldg MCC1A.On 870406,reactor Power Dropped Following Trip of 1A Forced Circulation PumpPower change
ML20211E4974 June 1986Special Rept 86-02:on 860307 & 0525,thermal Power Changed by Greater than 15% of Rated Thermal Power within 1 H on Three Occasions.Caused by Bus 1B Power Loss,Reactor Forced Circulation Pump Trip & Control Air SysPower change
ML20138B78611 March 1986Special Rept:On 860311,internal Portion of High Pressure Svc Water Sys Which Supplies Fire Suppression Sys Removed from Svc to Replace Valve Required to Be Tested by Inservice Testing Program
ML20141P1246 March 1986Incident Rept DPC-86-1:on 860104,seal Inject Supply Line Separated at Swagelock Fitting,Spraying Water & Resulting in Reactor Shutdown.Cause Unknown.Mechanical Seal on CRD 2 Reworked
ML20138L84321 October 1985Special Rept 85-02:on 850725,0909 & 14,reactor Thermal Power Changed by More than 15% of Rated Thermal Power within 1 H. Power History,Fuel Burnup,Cleanup Flow History,Offgas Activity Levels & Gross Alpha Activity Levels DiscussedPower change
ML20138L7458 October 1985Special Rept:Discusses Circumstances Which Led to Inaccuracies in Personnel Cumulative Lifetime Dose Records. Cumulative Permanent Doses in Radiation Dosimetry Rept Do Not Agree W/Records Maintained in Computer File
ML20128N91418 July 1985Special Rept 85-01:providing Results of Sampling & Analysis Actions & Addl Operational Info for Six Occasions When Reactor Thermal Power Changed by More than 15% of Rated Thermal Power within 1 HPower change
ML20062D16026 July 1982Ro:On 820726,internal Portion of Fire Suppression Water Sys Removed from Svc in Order to Replace Fire Hose Cabinets Rendering Fire Suppression Water Sys Inoperable.Backup Capability Provided
ML20054F1717 June 1982RO 82-14:on 820605,w/reactor in Operating Condition 2 at 50 X 10-6% Power,Review of Shift Supervisor Log Revealed Primary Water Alpha Activity of 7.46 X 10-6 Uci/Gm.Reactor Shutdown Conducted 820605 in Accordance W/Tech Spec