Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20206D34131 December 1999Suppl Technical Evaluation Rept Based on Review of Addl Responses & Site Audit of Individual Plant Exam of External Events at Susquehanna Steam Electric Station,Units 1 & 2Safe Shutdown
Fire Barrier
Probabilistic Risk Assessment
Earthquake
ML17164A69031 July 1998Site Audit Rept for Step 2 Review of IPEEE at Susquehanna Steam Electric Station Units 1 & 2. Site Audit Plan, Jul 1998Safe Shutdown
Fire Barrier
Earthquake
ML18026A29328 February 1998Technical Evaluation Rept on Submittal Only Review of IPEEE at Susquehanna Steam Electric Station Units 1 & 2. Final Rept,Feb 1998Hot Short
Safe Shutdown
High winds
Fire Barrier
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Tornado-Generated Missile
Seismically rugged
Earthquake
Scaffolding
ML20212F19231 March 1997Rev 1 to, Review & Evaluation of PP&L Fire Protection Review Rept,Rev 4 Susquehanna Steam Electric Station Safe Shutdown Capability-10CFR50,App R, 'Post-Fire Safe Shutdown Methodology & Analysis of Associated Circuits.'Hot Short
Safe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Fire Barrier
Emergency Lighting
Fire Protection Program
Coast down
ML18026A27431 October 1995Technical Evaluation Rept on Second 10-Yr ISI Program Plan for Units 1 & 2.Boric Acid
Weld Overlay
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Pressure Boundary Leakage
Pressure boundary leak
ML20080L68628 February 1995Technical Evaluation Rept:Pp&L,Susquehanna Steam Electric Station,Pump & Valve Inservice Testing Program,Rev 10,Unit 1 Second 10-Yr Interval,Rev 7,Unit 2 Second 10-Yr IntervalHigh Radiation Area
Stroke time
Scram Discharge Volume
Cold shutdown justification
Power-Operated Valves
ML20091J1151 October 1991Final Technical Evaluation Rept,Susquehanna Steam Electric Station Units 1 & 2,Station Blackout EvaluationSafe Shutdown
ML20082Q82731 August 1991Evaluation of 9 by 9 Fuel Impact on Stability of Susquehanna-2 at End of Cycle 4
ML18040B26131 October 1989Technical Evaluation Rept on Response from Pennsylvania Power & Light to Generic Ltr 88-01 Pertaining to Susquehanna Steam Electric Station Unit 2, Final ReptWeld Overlay
ML18040A94630 September 1989Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Susquehanna-1/-2, Final Technical Evaluation Rept
ML20245F04722 June 1989Fire Protection Review Rept EvaluationSafe Shutdown
High Radiation Area
Fire Barrier
Emergency Lighting
Fire Protection Program
ML18040A92531 December 1988Conformance to Generic Ltr 83-28,Item 2.1 (Part 2),Reactor Trip Sys Vendor Interface,Susquehanna Steam Electric Station Units 1 & 2, Technical Evaluation Rept.Salp Input Also EnclSystematic Assessment of Licensee Performance
ML18040A92231 December 1988Conformance to Generic Ltr 83-28,Item 4.5.2,Susquehanna Steam Electric Station Units 1 & 2, Technical Evaluation ReptSystematic Assessment of Licensee Performance
ML18040B18931 August 1987Selected Operating Reactors Issues:Stability Calculations for Grand Gulf 1 & Susquehanna 2 Bwrs.
ML20235V15231 August 1987Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2
ML18040B16730 November 1986First Interval Inservice Insp Program,Susquehanna Steam Electric Station Unit 2, Technical Evaluation ReptHydrostatic
VT-2
Incorporated by reference
Dissimilar Metal Weld
ML20211K47730 November 1986First Interval Inservice Insp Program,Susquehanna Steam Electric Station Unit 1, Technical Evaluation ReptHydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Dissimilar Metal Weld
ML20138B57330 September 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 for Susquehanna Steam Electric Station Unit 2
ML20137E69330 June 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Susquehanna Steam Electric Station Unit 1
ML20093C53330 March 1984Audit of Susquehanna Unit 2 Tech Specs, Technical Evaluation ReptReactor Vessel Water Level
Half scram
Stroke time
Hydrostatic
Anchor Darling
Backfit
ML18040B03925 January 1984Evaluation of Detailed Control Room Design Review for Susquehanna Steam Electric Station, Technical Evaluation Rept
ML18040A71730 September 1983Conformance to Reg Guide 1.97,Susquehanna Steam Electric Station,Units 1 & 2.Post Accident Monitoring
Fuel cladding
ML18040B03030 September 1983Control of Heavy Loads at Nuclear Power Plants,Susquehanna Steam Electric Station,Unit 2 (Phase I), Draft Technical Evaluation ReptSafe Shutdown
Control of Heavy Loads
ML20024A60430 April 1983Control of Heavy Loads at Nuclear Power Plants, Susquehanna Steam Electric Station,Unit 1,(Phase I).Safe Shutdown
Control of Heavy Loads
ML20058A74131 May 1982Audit of Environ Qualification of Safety-Related Electrical Equipment at Susquehanna Steam Electric Station, Interim Rept