Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20147A71031 December 1996Technical Ltr Rept, Pacific Northwest Natl Lab Review of Main Yankee In-Situ Pressure Test Assessment, Rev 2Safe Shutdown Earthquake
Finite Element Analysis
Flow Induced Vibration
ML20148C64430 June 1996Review of Operating Experience for Maine Yankee from Jan 1993 - Mar 1996Unanalyzed Condition
Fire Barrier
Temporary Modification
Fire Watch
ML20058K8709 July 1990Rev 2 to Technical Evaluation Rept,Maine Yankee Atomic Power Station,Station Blackout Evaluation
ML20246N6972 May 1989Summary of Environ Data from Plant for 1988
ML20207J43930 June 1988Conformance to Reg Guide 1.97:Maine Yankee, Technical Evaluation ReptBoric Acid
Fuel cladding
ML20195G55630 September 1987TMI Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing,Maine Yankee Docket, Technical Evaluation ReptLoop seal
Anticipated operational occurrence
Anchor Darling
ML20237J14117 August 1987Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807
ML20215H66530 April 1987Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification for All Other Safety-Related Components,' Main Yankee, Technical Evaluation Rept
ML20214R55731 March 1987Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification,Maine Yankee, Final Informal Rept
ML20214R74331 March 1987Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3
ML20215G27431 March 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface Maine Yankee,St Lucie Units 1 & 2 & Waterford 3
ML20206B31831 March 1987Seismic Margin Review of the Maine Yankee Atomic Power Station.Volume 2.Systems AnalysisSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Safe Shutdown Earthquake
Temporary Modification
Earthquake
ML20206B29331 March 1987Seismic Margin Review of the Maine Yankee Atomic Power Station.Volume 3.Fragility Analysis
ML20206B24931 March 1987Seismic Margin Review of the Maine Yankee Atomic Power Station.Volume 1.Summary ReportBoric Acid
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Earthquake
ML20214R15331 March 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Maine Yankee,St Lucie 1 & 2 & Waterford 3, Informal Rept
ML20210Q4489 January 1987Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept
ML20141M85130 November 1985Conformance to Reg Guide 1.97,Maine Yankee Atomic Power StationBoric Acid
Fuel cladding
ML20138R71930 October 1985Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, Post-Trip Review:Data & Info Capabilities,For Maine Yankee Atomic Power Plant
ML20244D38710 July 1985Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant.
ML20244D43830 June 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities
ML20136G02929 May 1985Radiological Effluent Tech Spec Implementation (A-2),Maine Yankee Atomic Power Station, Technical Evaluation ReptBoric Acid
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Process Control Program
ML20129A2478 May 1985Evaluation of Dcrdr Summary Rept for Maine Yankee Atomic Power Station, Technical Evaluation Rept
ML20126E9947 December 1982Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982
ML20126H04331 January 1981Adequacy of Station Electric Distribution Sys Voltages, Me Yankee Atomic Power Station, Interim Informal Rept
ML20126B25331 December 1979Steam Generator Water Hammer Technical Evaluation for Facility. Eg&G to Id Operations Ofc,Doe,Encl