ML20058K870
From kanterella
Jump to navigation
Jump to search
Letter Sequence Other | |
---|---|
TAC:68563, (Approved, Closed) | |
Initiation
Administration Questions
| |
MONTHYEARML20246N7121989-04-14014 April 1989
[Table View]Submits Results of Evaluation of Plant Against Requirements of Station Blackout Rule.Proposed Station Blackout Duration, Procedure Description & Proposed Mods & Schedule Discussed. Diagram Re Alternate Power Supply Encl Project stage: Other ML20058K8701990-07-0909 July 1990 Rev 2 to Technical Evaluation Rept,Maine Yankee Atomic Power Station,Station Blackout Evaluation Project stage: Other ML20059H5781990-09-12012 September 1990 Forwards Safety Evaluation Re Facility Response to Station Blackout Rule.Requests Revised Response to Listed Items That Require Resolution,Within 60 Days of Ltr Date Project stage: Approval 1990-07-09 |
ML20058K870 | |
Person / Time | |
---|---|
Site: | Maine Yankee |
Issue date: | 07/09/1990 |
From: | SCIENCE APPLICATIONS INTERNATIONAL CORP. (FORMERLY |
To: | NRC |
Shared Package | |
ML20058K872 | List: |
References | |
CON-NRC-03-87-029 SAIC-89-1137, SAIC-89-1137-R02, TAC-68563, NUDOCS 9007270063 | |
Download: ML20058K870 (41) | |
Similar Documents at Maine Yankee | |
---|---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML20147A7101996-12-31031 December 1996
[Table view]Technical Ltr Rept, Pacific Northwest Natl Lab Review of Main Yankee In-Situ Pressure Test Assessment, Rev 2 ML20148C6441996-06-30030 June 1996 Review of Operating Experience for Maine Yankee from Jan 1993 - Mar 1996 ML20058K8701990-07-0909 July 1990 Rev 2 to Technical Evaluation Rept,Maine Yankee Atomic Power Station,Station Blackout Evaluation ML20246N6971989-05-0202 May 1989 Summary of Environ Data from Plant for 1988 ML20207J4391988-06-30030 June 1988 Conformance to Reg Guide 1.97:Maine Yankee, Technical Evaluation Rept ML20195G5561987-09-30030 September 1987 TMI Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing,Maine Yankee Docket, Technical Evaluation Rept ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20215H6651987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification for All Other Safety-Related Components,' Main Yankee, Technical Evaluation Rept ML20214R5571987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification,Maine Yankee, Final Informal Rept ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML20215G2741987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface Maine Yankee,St Lucie Units 1 & 2 & Waterford 3 ML20206B3181987-03-31031 March 1987 Seismic Margin Review of the Maine Yankee Atomic Power Station.Volume 2.Systems Analysis ML20206B2931987-03-31031 March 1987 Seismic Margin Review of the Maine Yankee Atomic Power Station.Volume 3.Fragility Analysis ML20206B2491987-03-31031 March 1987 Seismic Margin Review of the Maine Yankee Atomic Power Station.Volume 1.Summary Report ML20214R1531987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Maine Yankee,St Lucie 1 & 2 & Waterford 3, Informal Rept ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20141M8511985-11-30030 November 1985 Conformance to Reg Guide 1.97,Maine Yankee Atomic Power Station ML20138R7191985-10-30030 October 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, Post-Trip Review:Data & Info Capabilities,For Maine Yankee Atomic Power Plant ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20136G0291985-05-29029 May 1985 Radiological Effluent Tech Spec Implementation (A-2),Maine Yankee Atomic Power Station, Technical Evaluation Rept ML20129A2471985-05-0808 May 1985 Evaluation of Dcrdr Summary Rept for Maine Yankee Atomic Power Station, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20126H0431981-01-31031 January 1981 Adequacy of Station Electric Distribution Sys Voltages, Me Yankee Atomic Power Station, Interim Informal Rept ML20126B2531979-12-31031 December 1979 Steam Generator Water Hammer Technical Evaluation for Facility. Eg&G to Id Operations Ofc,Doe,Encl 1996-06-30 Category:QUICK LOOK MONTHYEARML20147A7101996-12-31031 December 1996
[Table view]Technical Ltr Rept, Pacific Northwest Natl Lab Review of Main Yankee In-Situ Pressure Test Assessment, Rev 2 ML20148C6441996-06-30030 June 1996 Review of Operating Experience for Maine Yankee from Jan 1993 - Mar 1996 ML20058K8701990-07-0909 July 1990 Rev 2 to Technical Evaluation Rept,Maine Yankee Atomic Power Station,Station Blackout Evaluation ML20246N6971989-05-0202 May 1989 Summary of Environ Data from Plant for 1988 ML20207J4391988-06-30030 June 1988 Conformance to Reg Guide 1.97:Maine Yankee, Technical Evaluation Rept ML20195G5561987-09-30030 September 1987 TMI Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing,Maine Yankee Docket, Technical Evaluation Rept ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20215H6651987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification for All Other Safety-Related Components,' Main Yankee, Technical Evaluation Rept ML20214R5571987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification,Maine Yankee, Final Informal Rept ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML20215G2741987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface Maine Yankee,St Lucie Units 1 & 2 & Waterford 3 ML20206B3181987-03-31031 March 1987 Seismic Margin Review of the Maine Yankee Atomic Power Station.Volume 2.Systems Analysis ML20206B2931987-03-31031 March 1987 Seismic Margin Review of the Maine Yankee Atomic Power Station.Volume 3.Fragility Analysis ML20206B2491987-03-31031 March 1987 Seismic Margin Review of the Maine Yankee Atomic Power Station.Volume 1.Summary Report ML20214R1531987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Maine Yankee,St Lucie 1 & 2 & Waterford 3, Informal Rept ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20141M8511985-11-30030 November 1985 Conformance to Reg Guide 1.97,Maine Yankee Atomic Power Station ML20138R7191985-10-30030 October 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, Post-Trip Review:Data & Info Capabilities,For Maine Yankee Atomic Power Plant ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20136G0291985-05-29029 May 1985 Radiological Effluent Tech Spec Implementation (A-2),Maine Yankee Atomic Power Station, Technical Evaluation Rept ML20129A2471985-05-0808 May 1985 Evaluation of Dcrdr Summary Rept for Maine Yankee Atomic Power Station, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20126H0431981-01-31031 January 1981 Adequacy of Station Electric Distribution Sys Voltages, Me Yankee Atomic Power Station, Interim Informal Rept ML20126B2531979-12-31031 December 1979 Steam Generator Water Hammer Technical Evaluation for Facility. Eg&G to Id Operations Ofc,Doe,Encl 1996-06-30 Category:ETC. (PERIODIC MONTHYEARML20147A7101996-12-31031 December 1996
[Table view]Technical Ltr Rept, Pacific Northwest Natl Lab Review of Main Yankee In-Situ Pressure Test Assessment, Rev 2 ML20148C6441996-06-30030 June 1996 Review of Operating Experience for Maine Yankee from Jan 1993 - Mar 1996 ML20058K8701990-07-0909 July 1990 Rev 2 to Technical Evaluation Rept,Maine Yankee Atomic Power Station,Station Blackout Evaluation ML20246N6971989-05-0202 May 1989 Summary of Environ Data from Plant for 1988 ML20207J4391988-06-30030 June 1988 Conformance to Reg Guide 1.97:Maine Yankee, Technical Evaluation Rept ML20195G5561987-09-30030 September 1987 TMI Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing,Maine Yankee Docket, Technical Evaluation Rept ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20215H6651987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification for All Other Safety-Related Components,' Main Yankee, Technical Evaluation Rept ML20214R5571987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification,Maine Yankee, Final Informal Rept ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML20215G2741987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface Maine Yankee,St Lucie Units 1 & 2 & Waterford 3 ML20206B3181987-03-31031 March 1987 Seismic Margin Review of the Maine Yankee Atomic Power Station.Volume 2.Systems Analysis ML20206B2931987-03-31031 March 1987 Seismic Margin Review of the Maine Yankee Atomic Power Station.Volume 3.Fragility Analysis ML20206B2491987-03-31031 March 1987 Seismic Margin Review of the Maine Yankee Atomic Power Station.Volume 1.Summary Report ML20214R1531987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Maine Yankee,St Lucie 1 & 2 & Waterford 3, Informal Rept ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20141M8511985-11-30030 November 1985 Conformance to Reg Guide 1.97,Maine Yankee Atomic Power Station ML20138R7191985-10-30030 October 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, Post-Trip Review:Data & Info Capabilities,For Maine Yankee Atomic Power Plant ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20136G0291985-05-29029 May 1985 Radiological Effluent Tech Spec Implementation (A-2),Maine Yankee Atomic Power Station, Technical Evaluation Rept ML20129A2471985-05-0808 May 1985 Evaluation of Dcrdr Summary Rept for Maine Yankee Atomic Power Station, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20126H0431981-01-31031 January 1981 Adequacy of Station Electric Distribution Sys Voltages, Me Yankee Atomic Power Station, Interim Informal Rept ML20126B2531979-12-31031 December 1979 Steam Generator Water Hammer Technical Evaluation for Facility. Eg&G to Id Operations Ofc,Doe,Encl 1996-06-30 Category:TEXT-PROCUREMENT & CONTRACTS MONTHYEARML20147A7101996-12-31031 December 1996
[Table view]Technical Ltr Rept, Pacific Northwest Natl Lab Review of Main Yankee In-Situ Pressure Test Assessment, Rev 2 ML20148C6441996-06-30030 June 1996 Review of Operating Experience for Maine Yankee from Jan 1993 - Mar 1996 ML20058K8701990-07-0909 July 1990 Rev 2 to Technical Evaluation Rept,Maine Yankee Atomic Power Station,Station Blackout Evaluation ML20246N6971989-05-0202 May 1989 Summary of Environ Data from Plant for 1988 ML20207J4391988-06-30030 June 1988 Conformance to Reg Guide 1.97:Maine Yankee, Technical Evaluation Rept ML20155B7531988-06-0101 June 1988 Corrected Mod 1,restoring Funds That Was Deobligated & Providing Final Increment of Funding to Contract,To Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee, Pilgrim & Seabrook Resident Sites ML20155B7391988-06-0101 June 1988 Notification of Contract Execution,Mod 1,to Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites. Contractor:New England Telephone Co ML20195G5561987-09-30030 September 1987 TMI Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing,Maine Yankee Docket, Technical Evaluation Rept ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20236P2051987-08-10010 August 1987 Notification of Contract Execution,Mod 1,to Local Telephone Svc for Yankee Rowe,Vermont Yankee,Main Yankee,Pilgrim & Seabrook Resident Sites. Contractor:New England Bell Telephone Co ML20236P2181987-08-10010 August 1987 Mod 1,increasing Total Amount of Contract,To Local Telephone Svc for Yankee Rowe,Vermont Yankee,Main Yankee, Pilgrim & Seabrook Resident Sites ML20215H6651987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification for All Other Safety-Related Components,' Main Yankee, Technical Evaluation Rept ML20206S7131987-04-0808 April 1987 Notification of Contract Execution,Mod 1,to Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites. Contractor:New England Bell Telephone Co ML20206S7871987-04-0808 April 1987 Mod 1,changing Billing Address as Result of NRC Reorganization,To Local Telephone Svc for Yankee Rowe, Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites ML20206B2931987-03-31031 March 1987 Seismic Margin Review of the Maine Yankee Atomic Power Station.Volume 3.Fragility Analysis ML20215G2741987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface Maine Yankee,St Lucie Units 1 & 2 & Waterford 3 ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML20214R1531987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Maine Yankee,St Lucie 1 & 2 & Waterford 3, Informal Rept ML20206B2491987-03-31031 March 1987 Seismic Margin Review of the Maine Yankee Atomic Power Station.Volume 1.Summary Report ML20206B3181987-03-31031 March 1987 Seismic Margin Review of the Maine Yankee Atomic Power Station.Volume 2.Systems Analysis ML20214R5571987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification,Maine Yankee, Final Informal Rept ML20211N4261987-02-23023 February 1987 Contract: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co ML20211N3981987-02-23023 February 1987 Notification of Contract Execution: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20153H0471986-02-20020 February 1986 Notification of Contract Execution: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co ML20153H0851986-02-20020 February 1986 Contract: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Company ML20141M8511985-11-30030 November 1985 Conformance to Reg Guide 1.97,Maine Yankee Atomic Power Station ML20138R7191985-10-30030 October 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, Post-Trip Review:Data & Info Capabilities,For Maine Yankee Atomic Power Plant ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20136G0291985-05-29029 May 1985 Radiological Effluent Tech Spec Implementation (A-2),Maine Yankee Atomic Power Station, Technical Evaluation Rept ML20129A2471985-05-0808 May 1985 Evaluation of Dcrdr Summary Rept for Maine Yankee Atomic Power Station, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20126H0431981-01-31031 January 1981 Adequacy of Station Electric Distribution Sys Voltages, Me Yankee Atomic Power Station, Interim Informal Rept ML20126B2531979-12-31031 December 1979 Steam Generator Water Hammer Technical Evaluation for Facility. Eg&G to Id Operations Ofc,Doe,Encl 1996-06-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20058K870&oldid=3565321"