Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20197H0258 June 1988FOIA Request for Agency Records & Info Re Insp Repts 50-334/88-16 & 50-412/88-11
ML20195G8193 June 1988FOIA Request for Documents Re NRC Inquiry Into B Gupta 801224 Memo to C Mccullough About Work Done by Schneider Inc,Schneider Consulting Engineers or Schneider Affiliate at Facility & Correspondence Between NRC & Schneider Inc
ML20151D62428 March 1988FOIA Request for Correspondence Between NRC & Duquesne Light Co Re NRC Inquiry Into 801224 Memo by B Gupta to C Mccullough Concerning Work Done by Schneider,Inc at Plant
ML20238D64417 August 1987FOIA Request for Listed Documents,Including NRC Commissioner Notation Vote Sheet Re Full Power Licensing of Plant
ML20211B6605 January 1987FOIA Request for Documents Re Allegations,Investigations, Fines,Convictions & Other Dispositions of Cases in Which Operators of Listed Facilities Charged W/Violating Federal whistle-blowing Statutes
ML20210J6323 December 1985FOIA Request for Records Re B Russell & Operator Training Rept at Facility
ML20154J3713 December 1985FOIA Request for Documents Re Overview,Regulation & Investigation of Adequacy of Training of Operators at Facility
ML20154R3643 December 1985FOIA Request for All Documents Received by NRC from INPO, TVA or Any Private Industry Representative Re NRC Employee B Russell & Operator Training Rept Re Facility
ML20138K2936 November 1985Questions Safety of Nuclear Facilities.Startup of Plant Opposed.Unbelievable Excuses Offered to Public Re Siren Alarms.Moving Out of Valley Desirable,But Not Possible,Due to Limited Job Opportunities
ML20099G5724 March 1985Comments on Des (NUREG-1094).Rept Should Indicate If Assessment of Dose Takes Into Account Exposure to Radiation from Plant for Females at Puberty & Women in Early Stages of Pregnancy
ML20080K36210 February 1984Forwards Correspondence Re Facilities Use of heavy-wall Pipe Fittings at Facilities.Requests Info Re Uses of Heavy Pipe Fittings & Effects on Piping Design Analyses & What NRC Has Done Re Stiff Pipe Clamps at Facilities
ML20081E60828 September 1983Discusses Environ Areas of Concern Re Injury in Fact Test & Zone of Interest Test.Identification of Accidents Causing Harmful Radiation Releases Requested.Exhibits 1,2 & 3 Encl
ML20080L58223 September 1983Requests Site Plans Showing All Structures to Be Placed on Premises.Plant Tour Will Show Evacuation Plan Fraudulent
ML20080E7099 September 1983Designates J Johnsrud as Legal Representative for Opposition to OL Issuance
ML20083E2689 August 1983FOIA Request for Six Categories of Documents Re PRA & Evacuation Time EstimatesProbabilistic Risk Assessment
ML20077D81320 July 1983Discusses Petition to Intervene & Forwards Newspaper Articles.Individuals Living Inside Nuclear Complex Should Be Allowed to Speak
ML20024B06427 June 1983Forwards Gs White Petition to Intervene in OL Hearings
ML19312B61923 March 1979Requests Order Stating Date,Time & Place of ASLB Facility Hearing
ML20244A47115 July 1978Comments on Subj Facil Soil Study of Category I Struc. Studies 1-4 Conclude That Liquefaction Should Not Occur During the Simultaneous Occurrence of the SSE & the 25 Year Flood.Agrees W/Studies & Suggests a Portion Be AmplifiedEarthquake