MONTHYEARML18152B3571999-10-22022 October 1999
[Table view]Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 IR 05000412/19990071999-10-21021 October 1999 Refers to Special Team Insp 50-412/99-07 Conducted from 990720-29 & Forwards Nov.Two Violations Identified.First Violation Involved Failure to Implement C/A to Prevent Biofouling of Service Water System ML20217M1591999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217M1851999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates JPN-99-035, Forwards Comments on Version 2 of Reactor Vessel Integrity Database for Plant.Table Listing Recommended Changes to Info in Rvid,Encl as Attachment 11999-10-15015 October 1999 Forwards Comments on Version 2 of Reactor Vessel Integrity Database for Plant.Table Listing Recommended Changes to Info in Rvid,Encl as Attachment 1 ML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 JPN-99-034, Forwards Proposed risk-informed ISI Program,Provided from NRC Review & Approval as Alternative to Current ASME Section XI Insp Requirements for Class 1 & 2 Piping1999-10-13013 October 1999 Forwards Proposed risk-informed ISI Program,Provided from NRC Review & Approval as Alternative to Current ASME Section XI Insp Requirements for Class 1 & 2 Piping ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 L-99-152, Submits Relief Request BV3-N-533-1,rev 0,requesting Use of ASME Approved Code Case N-553-1, Alternative Requirements for VT-2 Visual Examination of Class 1,2 & 3 Insulated Pressure Retaining Bolted Connections1999-10-11011 October 1999 Submits Relief Request BV3-N-533-1,rev 0,requesting Use of ASME Approved Code Case N-553-1, Alternative Requirements for VT-2 Visual Examination of Class 1,2 & 3 Insulated Pressure Retaining Bolted Connections L-99-143, Informs That Subsequent Review of Approval Ltrs & SE for Relief Requests 1TYP-2-B5.40-1 (Rev 0),BV1-RV-AUG (Rev 1), BV2-RV-AUG (Rev 1),BV3-IWA-1 (Rev 1) & BV3-IWA-2 (Rev 1) Identified Erroneous Statements Which Dl Wishes to Correct1999-10-11011 October 1999 Informs That Subsequent Review of Approval Ltrs & SE for Relief Requests 1TYP-2-B5.40-1 (Rev 0),BV1-RV-AUG (Rev 1), BV2-RV-AUG (Rev 1),BV3-IWA-1 (Rev 1) & BV3-IWA-2 (Rev 1) Identified Erroneous Statements Which Dl Wishes to Correct ML20217C6741999-10-0808 October 1999 Forwards RAI Re Licensee 970128 Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, . Response Requested within 60 Days of Receipt of Ltr JPN-99-033, Provides Response to Questions Contained in 990712,facsimile from NRC Re Ja FitzPatrick USI A-46 Program.Questions Were Also Discussed Between Members of Util & NRC Staff During Telcon1999-10-0808 October 1999 Provides Response to Questions Contained in 990712,facsimile from NRC Re Ja FitzPatrick USI A-46 Program.Questions Were Also Discussed Between Members of Util & NRC Staff During Telcon ML20217E0301999-10-0707 October 1999 Forwards Insp Repts 50-334/99-06 & 50-412/99-06 on 990809-13 & 990823-27.Violation Noted Involving Failure to Correctly Translate Design Change Re Pertinent Operating Logs & Plant Equipment Labeling L-99-151, Responds to NRC Re Violations Noted in Insp Rept 50-412/99-07.Corrective Actions:Condition Repts Were Written for Listed Issues So That Repts Could Be Addressed Using BVPS Corrective Action Program1999-10-0707 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-412/99-07.Corrective Actions:Condition Repts Were Written for Listed Issues So That Repts Could Be Addressed Using BVPS Corrective Action Program ML20216J9621999-09-30030 September 1999 Forwards Insp Repts 50-334/99-05 & 50-412/99-05 on 990725-0904.Two Violations Noted & Being Treated as Ncvs.One Violation Re Failure to Follow Operation Manual Procedure Associated with Configuration Control Identified ML20212K8071999-09-30030 September 1999 Informs That on 990916,NRC Staff Completed mid-cycle Plant Performance Review (PPR) of Facility.Staff Conducted Reviews of All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility ML20212M2661999-09-30030 September 1999 Forwards Order Approving Transfer of Licenses for Beaver Valley from Dlc to Pennsylvania Power Co & Approving Conforming Amends in Response to 990505 Application ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 JPN-99-030, Forwards Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases to Extend LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days1999-09-29029 September 1999 Forwards Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases to Extend LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days JPN-99-032, Forwards Info Re Potential Environ Effects of Alternatives to Proposed Expansion of FitzPatrick Spent Fuel Pool,In Response to NRC Project Manager Request1999-09-29029 September 1999 Forwards Info Re Potential Environ Effects of Alternatives to Proposed Expansion of FitzPatrick Spent Fuel Pool,In Response to NRC Project Manager Request ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl L-99-149, Informs NRC That Items Identified in 990629 Response to GL 98-01 Have Been Completed.Attached Table Submitted with Has Been Updated to Reflect Completion1999-09-28028 September 1999 Informs NRC That Items Identified in 990629 Response to GL 98-01 Have Been Completed.Attached Table Submitted with Has Been Updated to Reflect Completion ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles L-99-148, Notifies NRC of License Withdrawal of M Linch,License SOP-11478 IAW 10CFR50.74.M Linch Resigned from Employment at Bvps,Effective 9908171999-09-24024 September 1999 Notifies NRC of License Withdrawal of M Linch,License SOP-11478 IAW 10CFR50.74.M Linch Resigned from Employment at Bvps,Effective 990817 ML20212G0601999-09-23023 September 1999 Forwards Answer of Duquesne Light Co to Petition to Waive Time Limits & Suppl Comments of Local 29, Intl Brotherhood of Electrical Workers.Copies of Answer Have Been Served to Parties & Petitioner by e-mail or Facsimile ML20212F8341999-09-22022 September 1999 Forwards Insp Rept 50-333/99-07 on 990718-0828.No Violations Noted ML20212C5521999-09-21021 September 1999 Forwards for Filing,Answer to Firstenergy Nuclear Operating Co & Pennsylvania Power Co in Opposition to Petition to Waive Time Limits & Suppl Comments of Local 29 Intl Brotherhood of Electrical Workers ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included L-99-144, Forwards NRC Form 536 Which Addresses Util Proposed Operator Licensing Exam Schedule,In Response to Administrative Ltr 99-031999-09-20020 September 1999 Forwards NRC Form 536 Which Addresses Util Proposed Operator Licensing Exam Schedule,In Response to Administrative Ltr 99-03 ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations JAFP-99-0262, Forwards Voluntary Response to Administrative Ltr 99-03, Re Preparation & Scheduling of Operator Licensing Exams. Completed NRC Form 536,containing Info Re Proposed Exam Preparation Schedule & Initial Operator License Exams,Encl1999-09-16016 September 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Re Preparation & Scheduling of Operator Licensing Exams. Completed NRC Form 536,containing Info Re Proposed Exam Preparation Schedule & Initial Operator License Exams,Encl ML20212B3291999-09-16016 September 1999 Forwards for Filing,Petition to Waive Time Limits in 10CFR2.1305 & Supplemental Comments of Local 29,Intl Brotherhood of Electrical Workers Re Beaver Valley Power Station,Units 1 & 2 L-99-134, Provides Addl Info to Support 990617 LAR 127,proposing Mods to Heatup,Cooldown & Overpressure Protection Curves.Info Is Provided to Formally Docket Info Discussed During 990820 Telcon with NRC1999-09-15015 September 1999 Provides Addl Info to Support 990617 LAR 127,proposing Mods to Heatup,Cooldown & Overpressure Protection Curves.Info Is Provided to Formally Docket Info Discussed During 990820 Telcon with NRC ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics 05000333/LER-1998-015, Forwards LER 98-015-02 Re Logic Sys Functional Test Inadequacies,Per 10CFR50.73(A)(2)(i)(B).Rept Revised to Reflect Scheduled Completion Date for Corrective Action 3 of Jan 15, 2000 & Updates Status of Other C/As as Complete1999-09-0808 September 1999 Forwards LER 98-015-02 Re Logic Sys Functional Test Inadequacies,Per 10CFR50.73(A)(2)(i)(B).Rept Revised to Reflect Scheduled Completion Date for Corrective Action 3 of Jan 15, 2000 & Updates Status of Other C/As as Complete JAFP-99-0258, Forwards Operator License Restriction Change for Tj Pelton, License SOP-10090-3.License Is Requested to Be Reissued with Restriction for Corrective Lenses.Encl Withheld1999-09-0808 September 1999 Forwards Operator License Restriction Change for Tj Pelton, License SOP-10090-3.License Is Requested to Be Reissued with Restriction for Corrective Lenses.Encl Withheld ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML20211Q3431999-09-0808 September 1999 Informs That During 990903 Telcon Between L Briggs & T Kuhar,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant,Unit 1.Insp Planned for Wk of 991115 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARML18152B3571999-10-22022 October 1999
[Table view]Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 JPN-99-035, Forwards Comments on Version 2 of Reactor Vessel Integrity Database for Plant.Table Listing Recommended Changes to Info in Rvid,Encl as Attachment 11999-10-15015 October 1999 Forwards Comments on Version 2 of Reactor Vessel Integrity Database for Plant.Table Listing Recommended Changes to Info in Rvid,Encl as Attachment 1 ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing JPN-99-034, Forwards Proposed risk-informed ISI Program,Provided from NRC Review & Approval as Alternative to Current ASME Section XI Insp Requirements for Class 1 & 2 Piping1999-10-13013 October 1999 Forwards Proposed risk-informed ISI Program,Provided from NRC Review & Approval as Alternative to Current ASME Section XI Insp Requirements for Class 1 & 2 Piping ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info L-99-143, Informs That Subsequent Review of Approval Ltrs & SE for Relief Requests 1TYP-2-B5.40-1 (Rev 0),BV1-RV-AUG (Rev 1), BV2-RV-AUG (Rev 1),BV3-IWA-1 (Rev 1) & BV3-IWA-2 (Rev 1) Identified Erroneous Statements Which Dl Wishes to Correct1999-10-11011 October 1999 Informs That Subsequent Review of Approval Ltrs & SE for Relief Requests 1TYP-2-B5.40-1 (Rev 0),BV1-RV-AUG (Rev 1), BV2-RV-AUG (Rev 1),BV3-IWA-1 (Rev 1) & BV3-IWA-2 (Rev 1) Identified Erroneous Statements Which Dl Wishes to Correct L-99-152, Submits Relief Request BV3-N-533-1,rev 0,requesting Use of ASME Approved Code Case N-553-1, Alternative Requirements for VT-2 Visual Examination of Class 1,2 & 3 Insulated Pressure Retaining Bolted Connections1999-10-11011 October 1999 Submits Relief Request BV3-N-533-1,rev 0,requesting Use of ASME Approved Code Case N-553-1, Alternative Requirements for VT-2 Visual Examination of Class 1,2 & 3 Insulated Pressure Retaining Bolted Connections JPN-99-033, Provides Response to Questions Contained in 990712,facsimile from NRC Re Ja FitzPatrick USI A-46 Program.Questions Were Also Discussed Between Members of Util & NRC Staff During Telcon1999-10-0808 October 1999 Provides Response to Questions Contained in 990712,facsimile from NRC Re Ja FitzPatrick USI A-46 Program.Questions Were Also Discussed Between Members of Util & NRC Staff During Telcon L-99-151, Responds to NRC Re Violations Noted in Insp Rept 50-412/99-07.Corrective Actions:Condition Repts Were Written for Listed Issues So That Repts Could Be Addressed Using BVPS Corrective Action Program1999-10-0707 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-412/99-07.Corrective Actions:Condition Repts Were Written for Listed Issues So That Repts Could Be Addressed Using BVPS Corrective Action Program JPN-99-032, Forwards Info Re Potential Environ Effects of Alternatives to Proposed Expansion of FitzPatrick Spent Fuel Pool,In Response to NRC Project Manager Request1999-09-29029 September 1999 Forwards Info Re Potential Environ Effects of Alternatives to Proposed Expansion of FitzPatrick Spent Fuel Pool,In Response to NRC Project Manager Request JPN-99-030, Forwards Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases to Extend LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days1999-09-29029 September 1999 Forwards Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases to Extend LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl L-99-149, Informs NRC That Items Identified in 990629 Response to GL 98-01 Have Been Completed.Attached Table Submitted with Has Been Updated to Reflect Completion1999-09-28028 September 1999 Informs NRC That Items Identified in 990629 Response to GL 98-01 Have Been Completed.Attached Table Submitted with Has Been Updated to Reflect Completion ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors L-99-148, Notifies NRC of License Withdrawal of M Linch,License SOP-11478 IAW 10CFR50.74.M Linch Resigned from Employment at Bvps,Effective 9908171999-09-24024 September 1999 Notifies NRC of License Withdrawal of M Linch,License SOP-11478 IAW 10CFR50.74.M Linch Resigned from Employment at Bvps,Effective 990817 ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML20212G0601999-09-23023 September 1999 Forwards Answer of Duquesne Light Co to Petition to Waive Time Limits & Suppl Comments of Local 29, Intl Brotherhood of Electrical Workers.Copies of Answer Have Been Served to Parties & Petitioner by e-mail or Facsimile ML20212C5521999-09-21021 September 1999 Forwards for Filing,Answer to Firstenergy Nuclear Operating Co & Pennsylvania Power Co in Opposition to Petition to Waive Time Limits & Suppl Comments of Local 29 Intl Brotherhood of Electrical Workers ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls L-99-144, Forwards NRC Form 536 Which Addresses Util Proposed Operator Licensing Exam Schedule,In Response to Administrative Ltr 99-031999-09-20020 September 1999 Forwards NRC Form 536 Which Addresses Util Proposed Operator Licensing Exam Schedule,In Response to Administrative Ltr 99-03 ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML20212B3291999-09-16016 September 1999 Forwards for Filing,Petition to Waive Time Limits in 10CFR2.1305 & Supplemental Comments of Local 29,Intl Brotherhood of Electrical Workers Re Beaver Valley Power Station,Units 1 & 2 JAFP-99-0262, Forwards Voluntary Response to Administrative Ltr 99-03, Re Preparation & Scheduling of Operator Licensing Exams. Completed NRC Form 536,containing Info Re Proposed Exam Preparation Schedule & Initial Operator License Exams,Encl1999-09-16016 September 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Re Preparation & Scheduling of Operator Licensing Exams. Completed NRC Form 536,containing Info Re Proposed Exam Preparation Schedule & Initial Operator License Exams,Encl L-99-134, Provides Addl Info to Support 990617 LAR 127,proposing Mods to Heatup,Cooldown & Overpressure Protection Curves.Info Is Provided to Formally Docket Info Discussed During 990820 Telcon with NRC1999-09-15015 September 1999 Provides Addl Info to Support 990617 LAR 127,proposing Mods to Heatup,Cooldown & Overpressure Protection Curves.Info Is Provided to Formally Docket Info Discussed During 990820 Telcon with NRC ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) 05000333/LER-1998-015, Forwards LER 98-015-02 Re Logic Sys Functional Test Inadequacies,Per 10CFR50.73(A)(2)(i)(B).Rept Revised to Reflect Scheduled Completion Date for Corrective Action 3 of Jan 15, 2000 & Updates Status of Other C/As as Complete1999-09-0808 September 1999 Forwards LER 98-015-02 Re Logic Sys Functional Test Inadequacies,Per 10CFR50.73(A)(2)(i)(B).Rept Revised to Reflect Scheduled Completion Date for Corrective Action 3 of Jan 15, 2000 & Updates Status of Other C/As as Complete JAFP-99-0258, Forwards Operator License Restriction Change for Tj Pelton, License SOP-10090-3.License Is Requested to Be Reissued with Restriction for Corrective Lenses.Encl Withheld1999-09-0808 September 1999 Forwards Operator License Restriction Change for Tj Pelton, License SOP-10090-3.License Is Requested to Be Reissued with Restriction for Corrective Lenses.Encl Withheld ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H L-99-138, Forwards Rev 37 to Issue 4 for BVPS Physical Security Plan (PSP) (Base Plan,Safeguards Contingency Plan & Training & Qualification Plan).Changes to Plan Are Listed.Encls Withheld Per 10CFR2.790(d)1999-09-0303 September 1999 Forwards Rev 37 to Issue 4 for BVPS Physical Security Plan (PSP) (Base Plan,Safeguards Contingency Plan & Training & Qualification Plan).Changes to Plan Are Listed.Encls Withheld Per 10CFR2.790(d) L-99-136, Forwards Data Point Library (Dpl) Changes,Iaw Provisions of 10CFR50,App E,Section VI.3.a & NUREG-1394,Rev 1,Section 3.6, Administrative Implementation Requirements. Ten Listed Dpls Have Specific Setpoint Values Removed,Per Unit 2 Dpls1999-09-0202 September 1999 Forwards Data Point Library (Dpl) Changes,Iaw Provisions of 10CFR50,App E,Section VI.3.a & NUREG-1394,Rev 1,Section 3.6, Administrative Implementation Requirements. Ten Listed Dpls Have Specific Setpoint Values Removed,Per Unit 2 Dpls L-99-098, Forwards Proposed Changes to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Change Would Reduce Operations QA Program Description Commitments by Limiting Required Onsite Safety Committee Reviews of Mods1999-09-0202 September 1999 Forwards Proposed Changes to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Change Would Reduce Operations QA Program Description Commitments by Limiting Required Onsite Safety Committee Reviews of Mods ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution L-99-137, Forwards Issue 3,rev 3 to Bvps,Unit 1 Inservice Testing Program for Pumps & Valves. Encl 1 Provides Summary of IST Program Changes Which Have Been Incorporated Into Issue 3, Rev 31999-08-31031 August 1999 Forwards Issue 3,rev 3 to Bvps,Unit 1 Inservice Testing Program for Pumps & Valves. Encl 1 Provides Summary of IST Program Changes Which Have Been Incorporated Into Issue 3, Rev 3 L-99-022, Forwards Issue 2,Rev 1 to Bvps,Unit 2 Inservice Testing (IST) Program for Pumps & Valves. Summary of Changes,Encl1999-08-31031 August 1999 Forwards Issue 2,Rev 1 to Bvps,Unit 2 Inservice Testing (IST) Program for Pumps & Valves. Summary of Changes,Encl ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 L-99-037, Forwards Proposed Change to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Attachment 1 Further Describes Proposed Change & Identifies Reason for Change1999-08-30030 August 1999 Forwards Proposed Change to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Attachment 1 Further Describes Proposed Change & Identifies Reason for Change L-99-012, Forwards Proposed Change to Bvps,Units 1 & 2,operations QA Program Description,Per 10CFR50.54(a)(3)(ii),including Description of Proposed Change,Reason for Change & Basis for Concluding Revised Program Satisfy 10CFR50,App B1999-08-30030 August 1999 Forwards Proposed Change to Bvps,Units 1 & 2,operations QA Program Description,Per 10CFR50.54(a)(3)(ii),including Description of Proposed Change,Reason for Change & Basis for Concluding Revised Program Satisfy 10CFR50,App B JPN-99-028, Informs That Util Requires Extension from 990901 to 1015,to Complete Review of Rvid & Forward Comments to Nrc,Per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity1999-08-30030 August 1999 Informs That Util Requires Extension from 990901 to 1015,to Complete Review of Rvid & Forward Comments to Nrc,Per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed L-99-132, Forwards fitness-for-duty Program Six Month Rept for 990101-990630 for Bvps,Units 1 & 21999-08-26026 August 1999 Forwards fitness-for-duty Program Six Month Rept for 990101-990630 for Bvps,Units 1 & 2 1999-09-08 Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC MONTHYEARML20247F8061989-07-0505 July 1989
[Table view]FOIA Request for Documentation Re Incidents of Drug &/Or Alcohol Abuse During Past Five Yrs Amoung Employees or Contractors ML20244B0011989-03-0808 March 1989 Lists Facts to Consider for Action to Fix or Close GE Reactors Once & for All ML20197H0251988-06-0808 June 1988 FOIA Request for Agency Records & Info Re Insp Repts 50-334/88-16 & 50-412/88-11 ML20195G8191988-06-0303 June 1988 FOIA Request for Documents Re NRC Inquiry Into B Gupta 801224 Memo to C Mccullough About Work Done by Schneider Inc,Schneider Consulting Engineers or Schneider Affiliate at Facility & Correspondence Between NRC & Schneider Inc ML17304A1611988-05-20020 May 1988 Requests to Have Name Dropped from Notice List in Matters Affecting Plant.Earlier Concerns Have Been Satisfied & No Reason to Continue Sending Copies of Notices ML20151D6241988-03-28028 March 1988 FOIA Request for Correspondence Between NRC & Duquesne Light Co Re NRC Inquiry Into 801224 Memo by B Gupta to C Mccullough Concerning Work Done by Schneider,Inc at Plant ML17303A6161987-09-30030 September 1987 Forwards Scenario Review for Rancho Seco Emergency Preparedness Exercise,871104. Incomplete Scenario Provided for Review.Plant data,in-plant Chemistry & Radiological Data & Controller Info to Support Fire Drill Missing Elements ML20238D6441987-08-17017 August 1987 FOIA Request for Listed Documents,Including NRC Commissioner Notation Vote Sheet Re Full Power Licensing of Plant ML20214U2861987-06-0202 June 1987 Requests Extension of Comment Period for Application for Amend to License NPF-41 & Proposed NSHC Determination to 870608.Opposes Proposed NSHC for Listed Reasons If Request for Extension Denied ML20207T2381987-02-18018 February 1987 FOIA Request for Rept on Odds of Large Radioactive Release at Us Commercial Nuclear Reactors,Including Surry,Peach Bottom,Sequoyah,Grand Gulf & Zion ML20206H9501987-01-0707 January 1987 FOIA Request for Repts Re 861209 Event at Plant & NRC Investigations on Allegations Re Falsification of Welders Certification Papers ML20211B6601987-01-0505 January 1987 FOIA Request for Documents Re Allegations,Investigations, Fines,Convictions & Other Dispositions of Cases in Which Operators of Listed Facilities Charged W/Violating Federal whistle-blowing Statutes ML20210S5981986-10-26026 October 1986 FOIA Request for Two Categories of Documents Re 860514 Suspected Sabotage Incident & Implications for Nuclear Power Plant Security Regulations ML20209H1311986-10-26026 October 1986 FOIA Request for Documents Re 860514 Suspected Sabotage Incident at Plant & Implications for Nuclear Power Plant Security Regulations ML20202F2501986-05-16016 May 1986 Partially Withheld FOIA Request for Documents Re Allegations of Assault W/Deadly Weapon & Forceable Rape by Security Officer & NRC 860211-14 Insp of Security Sys & Safeguards Program ML20211L3871986-04-28028 April 1986 FOIA Request for Records on 851203 Expression of Concern by Bp Thompson Re Alleged Aberrant Behavior by Security Staff, Contacts Re Dept of Labor Case & Use of Polygraphs at Facility ML20141J3701986-04-23023 April 1986 Addresses Two Sets of Concerns Re Proposed Licensing & Changes & Comments Re 1985 SALP Rept for Facility.Favorable Action Requested Re Petition for Concretely Demonstrated Improvements in Mgt Performance ML20140G7471986-01-16016 January 1986 FOIA Request for Documents Re C-E Auxiliary Pressurizer Spray Sys at Palo Verde Nuclear Generating Station & Other Plants & ACRS Meetings on Subj ML20198A3121986-01-10010 January 1986 FOIA Request for Documents Re Allegations by Plant Personnel Between Apr & Oct 1985 Concerning Improperly Completed Work & Microbiologically Induced Corrosion of Unit 1 Diesel Generators ML20210J6321985-12-0303 December 1985 FOIA Request for Records Re B Russell & Operator Training Rept at Facility ML20154J3711985-12-0303 December 1985 FOIA Request for Documents Re Overview,Regulation & Investigation of Adequacy of Training of Operators at Facility ML20154R3641985-12-0303 December 1985 FOIA Request for All Documents Received by NRC from INPO, TVA or Any Private Industry Representative Re NRC Employee B Russell & Operator Training Rept Re Facility ML20138K2931985-11-0606 November 1985 Questions Safety of Nuclear Facilities.Startup of Plant Opposed.Unbelievable Excuses Offered to Public Re Siren Alarms.Moving Out of Valley Desirable,But Not Possible,Due to Limited Job Opportunities ML20136E5671985-10-10010 October 1985 FOIA Request for Documents Re 850912 loss-of-load Test Incident,As Discussed in Hl Thompson to Ee Van Brunt ML20134L4791985-07-17017 July 1985 FOIA Request for Biographical Data on Region III Resident Inspector,H Livermore & SALPs for Listed Plants for Specified Time Frames ML17298C1431985-05-15015 May 1985 Requests Acceptance of Coalition for Responsible Energy Educ Petition,Asking NRC to Order Util to Remove Corroded Piping & Bacteria Deposits from Unit 1 Spray Ponds ML17298C1371985-05-15015 May 1985 Requests Full Investigation Into Improprieties at Facility. Opines That Util Downplayed Corrosion Problems,Falsified Plant Records,Matls Waste & Drug Abuse of Workers ML17298C1391985-05-14014 May 1985 Requests Delay in Plant Operations & Acceptance of Coalition for Responsible Energy Educ Petition.Article Re Corrosion at Facilities Caused by Bacteria Gallionella Encl ML17299A4751985-05-0606 May 1985 Requests Recipient Participate in Public Forum in Phoenix,Az to Hear Objections to Impending Test Startup of Facility. Basic Constitutional Rights Abrogated & Chances of Unscheduled Radioactive Releases Increased ML20099G5721985-03-0404 March 1985 Comments on Des (NUREG-1094).Rept Should Indicate If Assessment of Dose Takes Into Account Exposure to Radiation from Plant for Females at Puberty & Women in Early Stages of Pregnancy ML20126E5691985-01-28028 January 1985 FOIA Request for Source Term Event Trees Prepared by Sandia for Subj Plants ML20126E0761985-01-15015 January 1985 FOIA Request for Three Categories of Records Re Incentive Package Ordered by State of Az Corporation Commission for Palo Verde Plant,Notification by NRC of Plan & Possible Implications of Plan on Fuel Load,Operation & Licensing ML20134G6041985-01-0707 January 1985 Requests Info Re Deficiencies in Ruskin Fire Dampers Noted in 841127 Part 21 Rept,Including Model Types,Notification to Other NRC Regional Offices & Generic Implications.Nrc Failure to Act When Problem Reported in 1980 Questioned ML20101U1691984-06-21021 June 1984 FOIA Request for Documents Re Civil Penalty &/Or Enforcement Action Against Util Resulting from Const Assessment Team Insp Findings ML20090L2581984-03-26026 March 1984 FOIA Request for Documents Re Deficiencies Concerning Summer 1983 Hot Functional Testing & Low Pressure Safety Injection Pumps ML20080K3621984-02-10010 February 1984 Forwards Correspondence Re Facilities Use of heavy-wall Pipe Fittings at Facilities.Requests Info Re Uses of Heavy Pipe Fittings & Effects on Piping Design Analyses & What NRC Has Done Re Stiff Pipe Clamps at Facilities ML20086Q4411983-12-0505 December 1983 Appeals Denial of FOIA Request for Documents Re NRC Const Assessment Team Insp Conducted Fron 830906-30 at Facilities ML20080D4731983-11-0404 November 1983 FOIA Request for Documents Re 831015 Accident at Facility Killing Control Room Operator Wc Jones ML17298A7901983-10-17017 October 1983 FOIA Request for Documents Re Facility Hot Functional Testing Problems,Including Broken Thermowells,Loose & Broken Reactor Coolant Pump Parts & Loose Thermal Sleeves ML20086Q4471983-10-0707 October 1983 FOIA Request for All Agency Records & Info Re NRC Const Assessment Team Insp Conducted from 830906-30 at Facilities ML20080G7791983-10-0707 October 1983 FOIA Request for Records Re NRC Const Assessment Team (Cat) Insp at Facilities ML20081E6081983-09-28028 September 1983 Discusses Environ Areas of Concern Re Injury in Fact Test & Zone of Interest Test.Identification of Accidents Causing Harmful Radiation Releases Requested.Exhibits 1,2 & 3 Encl ML20080L5821983-09-23023 September 1983 Requests Site Plans Showing All Structures to Be Placed on Premises.Plant Tour Will Show Evacuation Plan Fraudulent ML20079E9471983-09-15015 September 1983 FOIA Request for Documents Re Caseload Forecast Panel Meetings During 1982 & 1983 ML17298A5601983-09-14014 September 1983 Submits Questions & Comments Re Failure of Primary RCS During Hot Functional Testing at Palo Verde Nuclear Generating Station.Licensing Hearings Should Be Reopened for Unit 1 to Ensure Adequate Exam of Problems During Testing ML20080K4321983-09-12012 September 1983 Requests Immediate Plant Shutdown Due to Concerns Re Adequacy of Piping Supports.Supports May Not Be Able to Withstand Normal Operating Loads.Util Has Known of Problem for 3-4 Yrs ML20080E7091983-09-0909 September 1983 Designates J Johnsrud as Legal Representative for Opposition to OL Issuance ML20080S8571983-08-11011 August 1983 FOIA Request for Target Technology,Ltd Documents Re Pipe Supports ML20083E2681983-08-0909 August 1983 FOIA Request for Six Categories of Documents Re PRA & Evacuation Time Estimates ML17298A5011983-08-0808 August 1983 Expresses Concern W/Damage to Facility Reactor Coolant Pump & Safety of C-E Sys-80 PWR Design.Final Approval of C-E Design Should Be Delayed Until Sys Problems Can Be Thoroughly Diagnosed & Treated 1989-07-05 |
Text
v 3 MC PcDL:c'Docengyog 3 1."((]l:jdSm7553
. $ qg@ ,
~ .,,
i.
115 ai ew . 176
,.gy 1 . m em ymd m/pe k -n rudn d .C5ga. 4~ a so.'y 6ce.
( 3 0 s L y h 2c %m,c _
Afofb><sr -
'Tedud/k$s~7$<1$eAdi
~/fsb~tA*7 W& C/s-anc. $
eAe tf l as fLG $& %
A4 ,4.dn C, l 44%,4 6 Yda WJ. ~.
awp~p a s y 4- c, sa a n 9 4 +La n af&k ' .
JL4va. / ea kJPAdbudjou 7904170005' 1
- - - - - - -
Retrieved from "https://kanterella.com/w/index.php?title=ML19312B619&oldid=2608824"