PNO-III-98-055, on 981113,licensee Shut Unit Down to Repair Steam Leak from Reactor Feedwater Check Valve.Valve Is SR & Would Provide Containment Isolation Function Under Accident Conditions13 November 1998PNO-III-98-055:on 981113,licensee Shut Unit Down to Repair Steam Leak from Reactor Feedwater Check Valve.Valve Is SR & Would Provide Containment Isolation Function Under Accident Conditions
PNO-III-98-048, on 981008,Detroit Edison Declared Alert Based on Operator Rept of Smoke & Fire Alarm Coming from EDG 12 Control Panel in Switchgear Room.Operator Tripped EDG 12, Opened Output Breaker & Left Switchgear Room21 October 1998PNO-III-98-048:on 981008,Detroit Edison Declared Alert Based on Operator Rept of Smoke & Fire Alarm Coming from EDG 12 Control Panel in Switchgear Room.Operator Tripped EDG 12, Opened Output Breaker & Left Switchgear RoomSafe Shutdown
PNO-III-98-015, on 980201,reactor Scrammed from 96% Power Following Trip of Main Turbine.Main Turbine Trip Resulted from Main Generator Load Rejection Protective Signal. Investigation Continuing4 February 1998PNO-III-98-015:on 980201,reactor Scrammed from 96% Power Following Trip of Main Turbine.Main Turbine Trip Resulted from Main Generator Load Rejection Protective Signal. Investigation Continuing
PNO-III-94-090, on 941219,reactor Operators Began Startup of Plant 2 Reactor Following Recovery from Turbine Generator Failure & Fire on 93122520 December 1994PNO-III-94-090:on 941219,reactor Operators Began Startup of Plant 2 Reactor Following Recovery from Turbine Generator Failure & Fire on 931225Shutdown Margin
PNO-III-94-078, on 941002,planned anti-nuclear Demonstration Held on Public Highways at Road Intersections Leading to Access Roads & owner-controlled Area Gates to Plant.Media Covered Event.State of Mi Informed3 October 1994PNO-III-94-078:on 941002,planned anti-nuclear Demonstration Held on Public Highways at Road Intersections Leading to Access Roads & owner-controlled Area Gates to Plant.Media Covered Event.State of Mi Informed
PNO-III-94-010, on 940216,licensee Announced Plan to Release Up to 1.5 Million Gals of Slightly Contaminated Water from Plant.Water Associated w/931225 Turbine Accident at Plant16 February 1994PNO-III-94-010:on 940216,licensee Announced Plan to Release Up to 1.5 Million Gals of Slightly Contaminated Water from Plant.Water Associated w/931225 Turbine Accident at Plant
PNO-III-93-069A, on 931228,Region III Issued CAL to Licensee Documenting Licensee Agreement to Submit Investigation Plan to NRC for Review Re Update of Extended Shutdown of Facility Due to Failure of low-pressure Turbine30 December 1993PNO-III-93-069A on 931228,Region III Issued CAL to Licensee Documenting Licensee Agreement to Submit Investigation Plan to NRC for Review Re Update of Extended Shutdown of Facility Due to Failure of low-pressure Turbine
PNO-III-90-072, on 901018,engineer Killed During Testing on Reactor Bldg Supply Fan.Investigation Continuing19 October 1990PNO-III-90-072:on 901018,engineer Killed During Testing on Reactor Bldg Supply Fan.Investigation Continuing
PNO-III-90-040, on 900620,positive Result from Drug Test Administered to Reactor Operator Reported During Routine Annual Physical Exam.Individual Unescorted Site Access Terminated & Referred to Employee Assistance Program21 June 1990PNO-III-90-040:on 900620,positive Result from Drug Test Administered to Reactor Operator Reported During Routine Annual Physical Exam.Individual Unescorted Site Access Terminated & Referred to Employee Assistance Program
PNO-III-90-026, on 900410,reactor Scrammed When Inboard MSIVs Began to Drift Shut Because of Loss of Pressure in Containment Pneumatic Nitrogen Sys10 April 1990PNO-III-90-026:on 900410,reactor Scrammed When Inboard MSIVs Began to Drift Shut Because of Loss of Pressure in Containment Pneumatic Nitrogen Sys
PNO-III-89-063, on 890922,picketers Protested Licensee Use of Nonbldg Trade Union Personnel to Perform Insp & Maint Work During Outage by Disrupting Outage Contractor Traffic from Entering Gate.Two Arrests Made by County Sheriff Dept22 September 1989PNO-III-89-063:on 890922,picketers Protested Licensee Use of Nonbldg Trade Union Personnel to Perform Insp & Maint Work During Outage by Disrupting Outage Contractor Traffic from Entering Gate.Two Arrests Made by County Sheriff Dept
PNO-III-89-028, on 890417,fire Occurred in Ofc Switchgear in Room in Bldg within Plant Protected Area.Fire Extinguished. Local Fire Marshall Investigating Incident & Extent of Damage18 April 1989PNO-III-89-028:on 890417,fire Occurred in Ofc Switchgear in Room in Bldg within Plant Protected Area.Fire Extinguished. Local Fire Marshall Investigating Incident & Extent of Damage
PNO-III-88-071, on 880809,brick Thrown Through Windshield of Contractor Vehicle & Driver Assaulted by Picketers.Incident Being Investigated by Monroe County Sheriff Dept.State Will Be Informed9 August 1988PNO-III-88-071:on 880809,brick Thrown Through Windshield of Contractor Vehicle & Driver Assaulted by Picketers.Incident Being Investigated by Monroe County Sheriff Dept.State Will Be Informed
PNO-III-88-065, on 880723,unidentified Drywell Leakage Forces Shutdown.Leakage Believed Coming from RCIC Inboard Steam Isolation Valve & Two Valves in Reactor Water Cleanup Sys. Repairs,Maint & Insp Activities Planned25 July 1988PNO-III-88-065:on 880723,unidentified Drywell Leakage Forces Shutdown.Leakage Believed Coming from RCIC Inboard Steam Isolation Valve & Two Valves in Reactor Water Cleanup Sys. Repairs,Maint & Insp Activities Planned
PNO-III-88-064, on 880713,pressure Transient in RWCU Sys Caused Compression Fitting on Instrument Line to Separate, Releasing Water & Steam Contaminated W/Radioactivity in Reactor Bldg.Caused by Failed Fitting.Damaged Line Isolated15 July 1988PNO-III-88-064:on 880713,pressure Transient in RWCU Sys Caused Compression Fitting on Instrument Line to Separate, Releasing Water & Steam Contaminated W/Radioactivity in Reactor Bldg.Caused by Failed Fitting.Damaged Line Isolated
PNO-III-88-052, on 880528,water Hammer in RWCU Sys Damaged Fitting on 5/8 Inch Instrument Line & Caused Leak of Steam & Water Into RWCU Sys Pump Room.Caused by Water Hammer. Instrument Line Repaired1 June 1988PNO-III-88-052:on 880528,water Hammer in RWCU Sys Damaged Fitting on 5/8 Inch Instrument Line & Caused Leak of Steam & Water Into RWCU Sys Pump Room.Caused by Water Hammer. Instrument Line Repaired
PNO-III-88-022, on 880318,received Bomb Threat Possibly Originating on Site.Site Access Restricted to Essential Personnel & Search of Facility Begun.No Explosive Devices Found & No Explosions Occurred.Investigation Continuing18 March 1988PNO-III-88-022:on 880318,received Bomb Threat Possibly Originating on Site.Site Access Restricted to Essential Personnel & Search of Facility Begun.No Explosive Devices Found & No Explosions Occurred.Investigation Continuing
PNO-III-88-019, on 880306,weapon Incident Involving Security Guard Occurred When During Verbal Confrontation One Security Guard Pointed Handgun at Second Guard.Individual Suspended & State of Mi Notified10 March 1988PNO-III-88-019:on 880306,weapon Incident Involving Security Guard Occurred When During Verbal Confrontation One Security Guard Pointed Handgun at Second Guard.Individual Suspended & State of Mi Notified
PNO-III-88-014, on 880226,portion of Automatic Start Circuitry for Plant Four Diesel Generators Not Fully Tested. Unusual Event Classification Terminated on 880227 Following Manual Reactor Scram.Maint & Testing Outage Begun29 February 1988PNO-III-88-014:on 880226,portion of Automatic Start Circuitry for Plant Four Diesel Generators Not Fully Tested. Unusual Event Classification Terminated on 880227 Following Manual Reactor Scram.Maint & Testing Outage Begun
PNO-III-88-003, on 880115,regional Administrator Authorized Licensee to Exceed 75% for First Time & Proceed Up to 100% Power.On 880116,licensee Began Increasing Power But Encountered Vibration Problems on Two Main Steam Lines20 January 1988PNO-III-88-003:on 880115,regional Administrator Authorized Licensee to Exceed 75% for First Time & Proceed Up to 100% Power.On 880116,licensee Began Increasing Power But Encountered Vibration Problems on Two Main Steam Lines
PNO-III-88-002, on 880111,reactor Tripped & HPCI & RCIC Sys Triggered Automatically Due to Trip of One Reactor Feedwater Pump.Caused by Feedwater Control Sys Power Supply Failure. Power Supply Replaced11 January 1988PNO-III-88-002:on 880111,reactor Tripped & HPCI & RCIC Sys Triggered Automatically Due to Trip of One Reactor Feedwater Pump.Caused by Feedwater Control Sys Power Supply Failure. Power Supply Replaced
PNO-III-88-001, on 871231,reactor Scrammed from 75% Power as Result of High Water Level in Reactor,Caused by Personnel Error During Installation of Auxiliary Computer Intended to Monitor Feedwater Heater Temp4 January 1988PNO-III-88-001:on 871231,reactor Scrammed from 75% Power as Result of High Water Level in Reactor,Caused by Personnel Error During Installation of Auxiliary Computer Intended to Monitor Feedwater Heater Temp
PNO-III-87-133, on 871009,licensee Authorized to Resume Operations Following Maint Outage.Limitation of 50% Power Remains in Effect.Licensee Will Provide Monthly Repts on Status of Preventive Maint Program & Improvement Plans13 October 1987PNO-III-87-133:on 871009,licensee Authorized to Resume Operations Following Maint Outage.Limitation of 50% Power Remains in Effect.Licensee Will Provide Monthly Repts on Status of Preventive Maint Program & Improvement Plans
PNO-III-87-130, on 871006,loaded .25 Caliber Automatic Pistol Found During Search of tractor-trailer Delivering Empty Radwaste Container to Plant Protected Area.Individual Denied Site Access & Detained Until Arrival of Police6 October 1987PNO-III-87-130:on 871006,loaded .25 Caliber Automatic Pistol Found During Search of tractor-trailer Delivering Empty Radwaste Container to Plant Protected Area.Individual Denied Site Access & Detained Until Arrival of Police
PNO-III-87-116A, updates Discovery of Turbine Bldg Pipe Support Damage.Addl Damage to Feedwater Heater Emergency Drain Lines Identified.Cause Undetermined.Damage Under Evaluation & Repair Plans Developed8 September 1987PNO-III-87-116A:updates Discovery of Turbine Bldg Pipe Support Damage.Addl Damage to Feedwater Heater Emergency Drain Lines Identified.Cause Undetermined.Damage Under Evaluation & Repair Plans Developed
PNO-III-87-116, on 870831,maint Personnel Discovered Evidence of Pipe Movement & Damage to Pipe Hangers & Supports on Emergency Drain Lines.Cause Undetermined. Investigation Continuing.Unit in Maint Since 8707313 September 1987PNO-III-87-116:on 870831,maint Personnel Discovered Evidence of Pipe Movement & Damage to Pipe Hangers & Supports on Emergency Drain Lines.Cause Undetermined. Investigation Continuing.Unit in Maint Since 870731
PNO-III-87-103, on 870727,licensee Reduced Power to Approx 2% to Repair Feedwater Check Valve Which Was Leaking. Unusual Event Under Licensee Emergency Plan Was Declared,Due to Required Shutdown31 July 1987PNO-III-87-103:on 870727,licensee Reduced Power to Approx 2% to Repair Feedwater Check Valve Which Was Leaking. Unusual Event Under Licensee Emergency Plan Was Declared,Due to Required Shutdown
PNO-III-87-101, on 870726,licensee Received Bomb Threat from Caller Angry Because Place of Residence Lost Power During Storm.Security Personnel Notified & Search Procedures Implemented.No Bomb Discovered27 July 1987PNO-III-87-101:on 870726,licensee Received Bomb Threat from Caller Angry Because Place of Residence Lost Power During Storm.Security Personnel Notified & Search Procedures Implemented.No Bomb Discovered
PNO-III-87-075, on 870521,licensee Shut Unit Down from 7% Power to Repair Valve Packing Leak Detected on 870520 in Rwcu.Source of Leak Determined & Valve Opened & Closed to Stop Leakage Through Packing22 May 1987PNO-III-87-075:on 870521,licensee Shut Unit Down from 7% Power to Repair Valve Packing Leak Detected on 870520 in Rwcu.Source of Leak Determined & Valve Opened & Closed to Stop Leakage Through PackingPacking leak
PNO-III-87-048A, on 870406-10,NRC Special Insp Concluded That All Licensed Reactor Operators,Currently on Shift,Duty Up to Date W/Util Operator Requalification Program.Addl Review of Past Requalification Program Will Be Conducted13 April 1987PNO-III-87-048A:on 870406-10,NRC Special Insp Concluded That All Licensed Reactor Operators,Currently on Shift,Duty Up to Date W/Util Operator Requalification Program.Addl Review of Past Requalification Program Will Be Conducted
PNO-III-87-055, on 870410-11,licensee Identified Several Steam Leaks in Main Steam Line & HPCI & RCIC Sys Declared Inoperable.Caused by Cracked Welds & Blown Fuse, Respectively.Reactor Shut Down for Steam Line Repairs13 April 1987PNO-III-87-055:on 870410-11,licensee Identified Several Steam Leaks in Main Steam Line & HPCI & RCIC Sys Declared Inoperable.Caused by Cracked Welds & Blown Fuse, Respectively.Reactor Shut Down for Steam Line Repairs
PNO-III-87-048, on 870402,util Informed Region III That Some Licensed Operators May Not Have Attended All of Required Lectures of Requalification Program.Unit Will Not Restart, Pending Review of Program3 April 1987PNO-III-87-048:on 870402,util Informed Region III That Some Licensed Operators May Not Have Attended All of Required Lectures of Requalification Program.Unit Will Not Restart, Pending Review of Program
PNO-III-87-022A, on 870308,plant Reached NRC Imposed Limit of 50% Power.Licensee Will Operate Plant at Approx 50% While Conducting Test on HPCI Sys,Rwcu Sys & Safety Relief Valves. Util Also Plans to Conduct Loss of Offsite Power Test9 March 1987PNO-III-87-022A:on 870308,plant Reached NRC Imposed Limit of 50% Power.Licensee Will Operate Plant at Approx 50% While Conducting Test on HPCI Sys,Rwcu Sys & Safety Relief Valves. Util Also Plans to Conduct Loss of Offsite Power Test
PNO-III-87-022, on 870216,Region III Authorized Facility to Exceed Previous 20% Power Limitation & Continue Testing Activities Up to 50% Power.Power Escalation Expected Pending Restoration of HPCI to Operable Status17 February 1987PNO-III-87-022:on 870216,Region III Authorized Facility to Exceed Previous 20% Power Limitation & Continue Testing Activities Up to 50% Power.Power Escalation Expected Pending Restoration of HPCI to Operable Status
PNO-III-87-016, on 870129,small Steam Leak Discovered in Spare Instrument Line Attached to Body of West Main Steam Bypass Valve.Caused by Crack in Weld Attaching Valve to Instrument Line.Valves Cut Off & Instrument Lines Plugged30 January 1987PNO-III-87-016:on 870129,small Steam Leak Discovered in Spare Instrument Line Attached to Body of West Main Steam Bypass Valve.Caused by Crack in Weld Attaching Valve to Instrument Line.Valves Cut Off & Instrument Lines PluggedFlow Induced Vibration
PNO-III-87-012, on 870123,licensee Informed Region That NRC- Licensed Nuclear Supervising Operator Suspended on 870122 Due to Positive Testing in Random Drug Screening on 870115. No Evidence of Error Found in Performance26 January 1987PNO-III-87-012:on 870123,licensee Informed Region That NRC- Licensed Nuclear Supervising Operator Suspended on 870122 Due to Positive Testing in Random Drug Screening on 870115. No Evidence of Error Found in PerformanceFitness for Duty
PNO-III-87-009, on 870114,Safe Energy Commission of Michigan (Sec) Announced Results of Investigation Into Licensee Safeteam Program.Rept Contends Safeteam Program Failure.Sec Plans to File 2.206 Petition W/Nrc14 January 1987PNO-III-87-009:on 870114,Safe Energy Commission of Michigan (Sec) Announced Results of Investigation Into Licensee Safeteam Program.Rept Contends Safeteam Program Failure.Sec Plans to File 2.206 Petition W/Nrc
PNO-III-87-001B, on 870108,normal Plant Shutdown Commenced to Repair Series of Small Steam Leaks on Main Steam Piping Attachments.Leak Located on Main Turbine Stop Valve 3 & Can Only Be Isolated by Closing MSIVs8 January 1987PNO-III-87-001B:on 870108,normal Plant Shutdown Commenced to Repair Series of Small Steam Leaks on Main Steam Piping Attachments.Leak Located on Main Turbine Stop Valve 3 & Can Only Be Isolated by Closing MSIVs
PNO-III-87-001A, on 870102,licensee Discovered Three Small Steam Leaks on Two of Four Main Steam Lines & on 870105, Following Repairs & Return of Steam Lines to Svc,Cracked Weld on Instrument Line/Valve Connection Found6 January 1987PNO-III-87-001A:on 870102,licensee Discovered Three Small Steam Leaks on Two of Four Main Steam Lines & on 870105, Following Repairs & Return of Steam Lines to Svc,Cracked Weld on Instrument Line/Valve Connection Found
PNO-III-87-001, on 870102,three Small Steam Leaks Discovered on Two of Four Main Steam Lines.During Power Reduction for Shutdown,Main Turbine Tripped on 18% Power.Cause Under Investigation.Instrument Lines Will Be Temporarily Plugged2 January 1987PNO-III-87-001:on 870102,three Small Steam Leaks Discovered on Two of Four Main Steam Lines.During Power Reduction for Shutdown,Main Turbine Tripped on 18% Power.Cause Under Investigation.Instrument Lines Will Be Temporarily Plugged
PNO-III-86-148, on 861217,guns,knives,ammunition & Marijuana Found in Possession of Truck Driver Seeking Entrance to Protected Area.Driver Denied Access & Arrested by State Police.Driver Involved W/Paramilitary Organization for Hire17 December 1986PNO-III-86-148:on 861217,guns,knives,ammunition & Marijuana Found in Possession of Truck Driver Seeking Entrance to Protected Area.Driver Denied Access & Arrested by State Police.Driver Involved W/Paramilitary Organization for Hire
PNO-III-86-136, on 861117,283,000 Gallons of Water Lost from Condensate Storage Tank Following Maint on Valve.Caused by Breaking of Weld to HPCI Test Return Pipe.Radwaste Spill Occurred During Transfer of Spilled Water18 November 1986PNO-III-86-136:on 861117,283,000 Gallons of Water Lost from Condensate Storage Tank Following Maint on Valve.Caused by Breaking of Weld to HPCI Test Return Pipe.Radwaste Spill Occurred During Transfer of Spilled Water
PNO-III-86-131A, 4-ft Tear Identified in North Condenser Boot During Repairs to Condenser Thermal Expansion Boots.Caused by Structural Damage to Condenser Supports.North & Ctr Condenser Thermal Expansion Boots Replaced14 November 1986PNO-III-86-131A:4-ft Tear Identified in North Condenser Boot During Repairs to Condenser Thermal Expansion Boots.Caused by Structural Damage to Condenser Supports.North & Ctr Condenser Thermal Expansion Boots Replaced
PNO-III-86-131, on 861107,unit Shut Down Due to Air Leakage Into Main Condenser.Caused by Leakage in Thermal Expansion Joint Between One Low Pressure Turbine & Main Condenser. Licensee Plans to Inspect Remaining Joints10 November 1986PNO-III-86-131:on 861107,unit Shut Down Due to Air Leakage Into Main Condenser.Caused by Leakage in Thermal Expansion Joint Between One Low Pressure Turbine & Main Condenser. Licensee Plans to Inspect Remaining Joints
PNO-III-86-125, on 861031,operator Inadvertently Skipped Step in Rod Withdrawal Procedure & Pulled Next Rod in Sequence Out One Notch (6 Inches).Rod Reinserted to Proper Position & Correct Rod Sequence Restored31 October 1986PNO-III-86-125:on 861031,operator Inadvertently Skipped Step in Rod Withdrawal Procedure & Pulled Next Rod in Sequence Out One Notch (6 Inches).Rod Reinserted to Proper Position & Correct Rod Sequence Restored
PNO-III-86-118, on 861023,licensee Demonstrated Remote Shutdown Capability.Demonstration Successful W/All Equipment Operating as Designed.Plant Control Returned to Control Room After 45 Minutes.Plant in Cold Shutdown for Scheduled Maint24 October 1986PNO-III-86-118:on 861023,licensee Demonstrated Remote Shutdown Capability.Demonstration Successful W/All Equipment Operating as Designed.Plant Control Returned to Control Room After 45 Minutes.Plant in Cold Shutdown for Scheduled Maint
PNO-III-86-112, on 861009,problem Occurred W/Rod Sequence Control Sys,Hindering Normal Manual Insertion of Control Rods.Caused by Low Voltage in Normal Power Supply.Evaluation of Problem Underway10 October 1986PNO-III-86-112:on 861009,problem Occurred W/Rod Sequence Control Sys,Hindering Normal Manual Insertion of Control Rods.Caused by Low Voltage in Normal Power Supply.Evaluation of Problem Underway
PNO-III-86-111, on 861005,reactor Manually Scrammed from 15% Power Due to Partial Loss of Vacuum in Condenser Causing Temp Increase.Also,On 861005,during Test of Water Level Transmitters,Pressure Spike Inadvertently Introduced8 October 1986PNO-III-86-111:on 861005,reactor Manually Scrammed from 15% Power Due to Partial Loss of Vacuum in Condenser Causing Temp Increase.Also,On 861005,during Test of Water Level Transmitters,Pressure Spike Inadvertently Introduced
PNO-III-86-106, on 860926,suspicious Device Found on Hatch Cover on Fourth Floor of Auxiliary Bldg.Bomb Disposal Specialists Investigated Device & Found Device Empty.Device Was Piece of Pipe Placed on Hatch by Maint Personnel26 September 1986PNO-III-86-106:on 860926,suspicious Device Found on Hatch Cover on Fourth Floor of Auxiliary Bldg.Bomb Disposal Specialists Investigated Device & Found Device Empty.Device Was Piece of Pipe Placed on Hatch by Maint Personnel
PNO-III-86-097, on 860912,authorization Granted to Increase Power Level to 20%.Power Escalation Expected This Wk.Power Increase Previously Recommended for 86091015 September 1986PNO-III-86-097:on 860912,authorization Granted to Increase Power Level to 20%.Power Escalation Expected This Wk.Power Increase Previously Recommended for 860910