Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20059F42931 December 1993Auxiliary Feedwater System RISK-BASED Inspection Guide for the South Texas Project Nuclear Power PlantPacking leak
Stroke time
Probabilistic Risk Assessment
ML20082M57731 August 1991a Review of the South Texas Project Probabilistic Safety Analysis for Accident Frequency Estimates and Containment BinningHot Short
Safe Shutdown
Mission time
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Chernobyl
ML20248D22631 March 1989Technical Specifications for South Texas Project,Units 1 and 2.Docket Nos. 50-498 and 50-499.(Houston Lighting and Power Company)Safe Shutdown
Boric Acid
Shutdown Margin
Packing leak
High Radiation Area
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Hydrostatic
Operating Basis Earthquake
Annual Radiological Environmental Operating Report
Process Control Program
Earthquake
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Fire Protection Program
Grace period
Power change
Unidentified leakage
ML20248D17331 March 1989Safety Evaluation Report Related to the Operation of South Texas Project,Unit 2.Docket No. 50-499.(Houston Lighting and Power Company)Boric Acid
Offsite Dose Calculation Manual
Stroke time
Internal Flooding
Hydrostatic
Process Control Program
Turbine Missile
ML20148P03731 March 1988Technical Specifications for South Texas Project,Unit 1. Docket No. 50-498.(Houston Lighting and Power Company)Safe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Packing leak
High Radiation Area
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Hydrostatic
Operating Basis Earthquake
Annual Radiological Environmental Operating Report
Process Control Program
Earthquake
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Fire Protection Program
Grace period
Power change
Unidentified leakage
ML20148N98331 March 1988Safety Evaluation Report Related to the Operation of South Texas Project,Units 1 and 2.Docket Nos. 50-498 and 50-499. (Houston Lighting and Power Company)Safe Shutdown
Shutdown Margin
Stroke time
Nondestructive Examination
Safeguards Contingency Plan
Cold shutdown justification
Exemption Request
Power-Operated Valves
Power Operated Valves
Turbine Missile
Fire Protection Program
ML20151S95331 March 1988NRC Safety Significance Assessment Team Report on Allegations Related to the South Texas Project,Units 1 & 2High Radiation Area
Hydrostatic
Coatings
Nondestructive Examination
Process Control Program
Biofouling
Stolen
ML20238A36131 August 1987Technical Specifications for South Texas Project,Unit 1. Docket No. 50-498.(Houston Lighting and Power Company)Safe Shutdown
Boric Acid
Shutdown Margin
Packing leak
High Radiation Area
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Hydrostatic
Operating Basis Earthquake
Annual Radiological Environmental Operating Report
Process Control Program
Earthquake
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Fire Protection Program
Grace period
Power change
Unidentified leakage
ML20237G46331 July 1987Safety Evaluation Report Related to the Operation of South Texas Project,Units 1 and 2.Docket Nos. 50-498 and 50-499. (Houston Lighting and Power Company)Safe Shutdown
Boric Acid
Reactor Vessel Water Level
Loop seal
Mission time
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Post Accident Monitoring
Internal Flooding
Nondestructive Examination
Emergency Lighting
Process Control Program
Safeguards Contingency Plan
Exemption Request
Earthquake
Fuel cladding
Fire Protection Program
ML20215H91631 May 1987Safety Evaluation Report Related to the Operation of South Texas Project,Units 1 and 2.Docket Nos. 50-498 and 50-499. (Houston Lighting and Power Company)Safe Shutdown
Boric Acid
Health Physics Network
Shutdown Margin
Offsite Dose Calculation Manual
Fire Barrier
Internal Flooding
Hydrostatic
Emergency Lighting
Incorporated by reference
Process Control Program
Safeguards Contingency Plan
Exemption Request
Control of Heavy Loads
Liquid penetrant
Offsite Circuit
Fire Protection Program
Dissimilar Metal Weld
Weak link
Siren
ML20211B38231 January 1987Safety Evaluation Report Related to the Operation of South Texas Project,Units 1 and 2.Docket Nos. 50-498 and 50-499. (Houston Lighting and Power Company)Safe Shutdown
Boric Acid
Shutdown Margin
Fire Barrier
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Post Accident Monitoring
Internal Flooding
Nondestructive Examination
Emergency Lighting
Process Control Program
Earthquake
Control of Heavy Loads
Power Operated Valves
Fuel cladding
Pressure boundary leak
Fire Protection Program
Power change
ML20206U00430 September 1986Safety Evaluation Report Related to the Operation of South Texas Project,Units 1 and 2.Docket Nos. 50-498 and 50-499. (Houston Lighting and Power Company)Safe Shutdown
Ultimate heat sink
Grab sample
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Tornado-Generated Missile
Tornado Missile Protection
Safeguards Contingency Plan
Exemption Request
Earthquake
Fire Protection Program
Unidentified leakage
ML20214N77731 August 1986Final Environmental Statement Related to the Operation of South Texas Project Units 1 and 2.Docket Nos. 50-498 and 50-499.(Houston Lighting and Power Company)
ML20214E67931 March 1986Draft Environmental Statement Related to Operation of the South Texas Project,Units 1 and 2.Docket Nos. 50-498 and 50-499.(Houston Lighting and Power Company)