Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20213H024 | 31 October 1986 | Technical Specifications for Shearon Harris Nuclear Power Plant Unit 1.Docket 50-400.(Carolina Power & Light Company) | Safe Shutdown Boric Acid Shutdown Margin Packing leak High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Operating Basis Earthquake Annual Radiological Environmental Operating Report Process Control Program Stress corrosion cracking Excess Flow Check Valve Earthquake Fuel cladding Biofouling Pressure Boundary Leakage Offsite Circuit Fire Protection Program Grace period Power change Unidentified leakage Overspeed trip Eddy-Current Testing Operational leakage Negative Flux Rate Trip |
ML20154G718 | 28 February 1986 | Review of the Shearon Harris Unit 1 Auxiliary Feedwater System Reliability Analysis | Stroke time Time to boil Earthquake Power-Operated Valves Power Operated Valves |