Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20148B329 | 14 March 1988 | Headquarters Daily Rept for 880314 | |
ML20196H635 | 8 March 1988 | Headquarters Daily Rept for 880308 | Missed surveillance |
IA-87-687, Potential Condition Adverse to Quality Rept Pcaq 86-0663, Usurping Authority for Direction of Reactor Operations from Line Mgt | 15 April 1987 | Potential Condition Adverse to Quality Rept Pcaq 86-0663, Usurping Authority for Direction of Reactor Operations from Line Mgt | Condition Adverse to Quality Fire Watch |
ML20236D850 | 15 April 1987 | Potential Condition Adverse to Quality Rept Pcaq 86-0663, Usurping Authority for Direction of Reactor Operations from Line Mgt | Condition Adverse to Quality Fire Watch |
ML20209B412 | 31 August 1986 | Operational Experience Involving Turbine Overspeed Trips, Case Study Rept | Loop seal Stroke time Overspeed trip |
ML20206C812 | 30 June 1986 | Report of the Independent AD HOC Group for the DAVIS-BESSE Incident | Probabilistic Risk Assessment Systematic Assessment of Licensee Performance Backfit |
ML20205N819 | 30 April 1986 | AEOD/E605 Lightning Events at Nuclear Power Plants, Engineering Evaluation Rept | |
ML20204A180 | 30 April 1986 | AEOD/T603, Inadvertent Pump Suction Transfer & Potential Auxiliary Feedwater Pump Cavitation at Davis-Besse, Technical Review Rept | Stroke time |
ML20134A814 | 31 July 1985 | Loss of Main and Auxiliary Feedwater Event at the DAVIS-BESSE Plant on June 9, 1985 | Unanalyzed Condition Stroke time Feedwater Heater Overspeed trip Water hammer |
ML20207L334 | 9 April 1980 | Evaluation of Licensee Compliance W/Category `A' Items of NRC Recommendations Resulting from TMI-2 Lessons Learned, Davis Besse Nuclear Power Station | Reactor Vessel Water Level Grab sample Integrated leak rate test Power change |