 Issue dateTitleTopic
ML21179A23525 June 2021PSEG Salem Generating Station - Incidental Take Report Atlantic Sturgeon 6/24/2021
ML21078A00025 March 2021Review of the Spring 2020 Steam Generator Tube Inspection Report
LR-N19-0010, U.S. Additional Protocol for Salem Unit 1 2018 Report31 January 2019U.S. Additional Protocol for Salem Unit 1 2018 Report
LR-N17-0076, Focused Evaluation of External Flooding30 June 2017Focused Evaluation of External FloodingSafe Shutdown
Ultimate heat sink
Fire Barrier
FLEX
Fukushima Dai-Ichi
Flooding Focused Evaluation
LR-N17-0051, Annual Report of Specific Activity Analysis - TS 6.9.1.5c16 February 2017Annual Report of Specific Activity Analysis - TS 6.9.1.5c
LR-N16-0161, Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal30 December 2016Flood Hazards Mitigating Strategies Assessment (MSA) Report SubmittalHigh winds
Ultimate heat sink
Hydrostatic
FLEX
Fukushima Dai-Ichi
LR-N16-0026, Annual Report of Specific Activity Analysis - TS 6.9.1.5c26 February 2016Annual Report of Specific Activity Analysis - TS 6.9.1.5c
LR-N15-0218, Revised Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report21 October 2015Revised Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual ReportLoop seal
LR-N15-0207, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report7 October 2015Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual ReportLoop seal
ML15119A16117 April 2015Report of Impingement of Atlantic Sturgeon
LR-N14-0268, Special Report 272/2014-008, One Channel of Reactor Vessel Level Instrumentation System (RVLIS) Inoperable Greater than 30 Days24 December 2014Special Report 272/2014-008, One Channel of Reactor Vessel Level Instrumentation System (RVLIS) Inoperable Greater than 30 Days
ML14113A22130 April 2014NRC Staff Review of the Documentation Provided by PSEG Nuclear LLC for the Salem Generating Station Units 1 and 2 Concerning Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During DesignBoric Acid
Mission time
Grab sample
Coatings
Foreign Material Exclusion
Scaffolding
LR-N14-0112, CFR 20.2206 Report - Apportion the 2013 Site Dose Between Salem and Hope Creek Station25 April 2014CFR 20.2206 Report - Apportion the 2013 Site Dose Between Salem and Hope Creek Station
ML14316A40231 March 2014Well AA-V Installation Report - FIG-06 Potable Well Locations in Lower Alloways Creek Elsinboro and Greenwich Townships
ML14316A40131 March 2014Well AA-V Installation Report - FIG-05 Vincentown Formation Mean Hydraulic Fluctuation Study Results Map - August 2013-5
ML14316A40031 March 2014Well AA-V Installation Report - FIG-02 Regional Cross SECTION-2
ML14316A39731 March 2014Well AA-V Installation Report - FIG-03 Facility Cross Section Through AA-V-3
ML14316A37931 March 2014Well AA-V Installation Report - Appendix a - Monitoring Well Certification Form B
ML14316A39831 March 2014Well AA-V Installation Report - FIG-04 Monitoring Wells Screened within the Vincentown FORMATION-4
ML14316A36931 March 2014Final Well AA-V Installation Report 031214
ML14316A33431 March 2014Well AA-V Installation Report - Appendix F - Well Search Results
ML14316A33331 March 2014Well AA-V Installation Report - Appendix E - Summary, Charts and Raw Data
ML14316A33131 March 2014Well AA-V Installation Report - Appendix D Specific Capacity Test for Well AA-V
ML14316A32931 March 2014Well AA-V Installation Report - Appendix C - AA-V Construction and Boring Logs
ML14316A32831 March 2014Well AA-V Installation Report - Appendix B - Cb Abandonment Report
ML14316A40631 March 2014Well AA-V Installation Report - Table 1 Well Construction Details
ML14316A40731 March 2014Well AA-V Installation Report - Table 2 Groundwater Sample Analytical Results Vincentown Wells
ML14316A40331 March 2014Well AA-V Installation Report - Table 3 Well AA-V Extended Purge Salem Chemistry Screening Results
ML14316A40831 March 2014Well AA-V Installation Report - Table 4 Mean Hydraulic Grad Study Results
ML14316A40931 March 2014Well AA-V Installation Report - Table 5 Well Search Summary
LR-N13-0259, Steam Generator Tube Inspection Report - Twenty-Second Refueling Outage (1R22)4 November 2013Steam Generator Tube Inspection Report - Twenty-Second Refueling Outage (1R22)Nondestructive Examination
LR-N13-0083, Response to March 12, 2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, ...26 April 2013Response to March 12, 2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, ...Safe Shutdown
High Radiation Area
FLEX
Fukushima Dai-Ichi
Severe Accident Management Guideline
LR-N13-0040, In-Service Inspection Activities - 90-Day Report, Revision 11 March 2013In-Service Inspection Activities - 90-Day Report, Revision 1
IR 05000254/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
ML13008A21931 January 2013U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000454/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000461/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000456/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000289/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000373/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000272/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000277/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000219/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000352/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000237/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
LR-N12-0366, Attachment to LR-N12-0366 - Study Kld TR-499, Rev 0 - 10CFR 50.54 (8) Summary28 November 2012Attachment to LR-N12-0366 - Study Kld TR-499, Rev 0 - 10CFR 50.54 (8) Summary
ML13052A67528 November 2012Attachment to LR-N12-0366 - Study Kld TR-499, Rev 0 - 10CFR 50.54 (8) Summary
ML11203A07813 July 2011Independent Spent Fuel Storage Installation, 10 CFR 72.212 Evaluation Report, Revision 6Non-Destructive Examination
Offsite Dose Calculation Manual
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Enforcement Discretion
Incorporated by reference
Tornado Missile Protection
Annual Radioactive Effluent Release Report
Design basis earthquake
Annual Radiological Effluent Release Report
Earthquake
Control of Heavy Loads
Fuel cladding
Fire Protection Program
LR-N11-0090, 2010 10 CFR 20.2206 Report - Apportion the 2010 Site Dose Between Salem and Hope Creek Stations8 April 20112010 10 CFR 20.2206 Report - Apportion the 2010 Site Dose Between Salem and Hope Creek Stations
ML10298008921 October 2010Steam Generator Tube Inspection Report- Twentieth Refueling Outage (1 R20)Nondestructive Examination