RA-21-0312, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) | 22 November 2021 | Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) | Post Accident Monitoring |
IR 05000261/2021005 | 25 August 2021 | Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005) | Fitness for Duty Cyber Security Exemption Request COVID-19 |
RA-19-0223, Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.46 | 30 May 2019 | Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.46 | |
RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2) | 2 April 2018 | Report of Changes Pursuant to 10 CFR 50.59(d)(2) | Unanalyzed Condition Open Phase Condition Fire Watch Overspeed trip |
ML16281A510 | 15 December 2016 | Staff Assessment of the Reactor Vessel Internals Aging Management Program Plans | Aging Management Stress corrosion cracking License Renewal |
RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors | 31 October 2016 | Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors | Post Accident Monitoring |
RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors | 5 October 2016 | Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors | Post Accident Monitoring |
RA-16-0024, Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-3008-P | 3 October 2016 | Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-3008-P | Safe Shutdown Boric Acid Shutdown Margin Loop seal Anticipated operational occurrence Post Accident Monitoring Nondestructive Examination Annual Radiological Environmental Operating Report Process Control Program Fuel cladding Coast down Affidavit Manual Operator Action |
RNP-RA/16-0038, Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-174 | 25 May 2016 | Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-174 | Hot Short Safe Shutdown High winds Mission time Fire Barrier Time to boil Enforcement Discretion Probabilistic Risk Assessment Fire impairment Operator Manual Action Multiple Spurious Operation Significance Determination Process Thermoset Large early release frequency Exemption Request Fire Protection Program Fire Watch Very Early Warning Fire Detection |
ML15253A410 | 11 March 2016 | Enclosure 2 Screening Analysis Report | Ultimate heat sink Tornado Missile Fukushima Dai-Ichi Earthquake Generic Issues Program |
RA-15-0047, Annual Report of Changes Pursuant to 10 CFR 50.46 | 17 November 2015 | Annual Report of Changes Pursuant to 10 CFR 50.46 | |
ML15280A199 | 19 October 2015 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
RNP-RA/15-0053, Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04) | 19 August 2015 | Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04) | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Mission time Fire Barrier Tornado Missile Time to boil FLEX B.5.b Fukushima Dai-Ichi Severe Accident Management Guideline Time Critical Operator Action Earthquake Scaffolding Weak link GOTHIC Unidentified leakage |
RNP-RA/15-0018, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel | 26 February 2015 | Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel | Post Accident Monitoring |
RNP-RA/14-0037, Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System | 8 April 2014 | Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System | |
RNP-RA/14-0012, Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3.... | 12 March 2014 | Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3.... | |
RNP-RA/13-0079, Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure Transmitter | 21 August 2013 | Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure Transmitter | Post Accident Monitoring |
RNP-RA/13-0066, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication | 24 June 2013 | Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication | Post Accident Monitoring |
RNP-RA/13-0037, Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 2012 | 25 April 2013 | Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 2012 | |
RNP-RA/11-0100, Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System | 23 November 2011 | Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System | |
ML112411358 | 23 September 2011 | Final Precursor Analysis: Concurrent Unavailabilities - EDG B Inoperable Due to Failed Output Breaker and EDG a Unavailable Due to Testing and Maintenance | Significance Determination Process |
ML112411359 | 23 September 2011 | Final Precursor Analysis: Electrical Fault Causes Fire and Subsequent Reactor Trip with a Loss of Reactor Coolant Pump Seal Injection and Cooling | Fitness for Duty Arc flash Significance Determination Process Preliminary White Finding |
ML112800528 | 29 December 2010 | NRC 2011 Hb Robinson | |
ML101930417 | 6 May 2010 | Tritium Database Report | Offsite Dose Calculation Manual Hydrostatic |
RNP-RA/08-0026, Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | 7 March 2008 | Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | Boric Acid High Radiation Area Fire Barrier Coatings Foreign Material Exclusion Stress corrosion cracking Exemption Request Scaffolding Manual Operator Action |
RNP-RA/06-0062, Groundwater Protection - Data Collection Questionnaire | 24 July 2006 | Groundwater Protection - Data Collection Questionnaire | |
RNP-RA/06-0048, Request for Technical Specifications, Change Related to Containment Peak Pressure | 17 July 2006 | Request for Technical Specifications, Change Related to Containment Peak Pressure | Ultimate heat sink |
RA-05-0104, Transmittal of Core Operating Limits Report | 10 October 2005 | Transmittal of Core Operating Limits Report | Shutdown Margin |
ML041460246 | 19 May 2004 | Q Report for Period Ending 03/31/2004 | |
ML032471632 | 22 August 2003 | Submittal of 10-Q Report | Boric Acid |
ML031890936 | 10 July 2003 | Relaxation of the Order, Exercising Enforcement Discretion, and Extension of the Time to Submit an Answer or Request a Hearing Regarding Order EA-03-038, Fitness-for-Duty Enhancements for Nuclear Security Force Personnel for Brunswick, Crys | Enforcement Discretion |
ML031700027 | 6 June 2003 | Submittal of 10-O Report | Boric Acid Power Uprate |
RNP-RA/02-0028, Request for Technical Specifications Change Re One-Time Extension of Containment Type a Test Interval | 26 March 2002 | Request for Technical Specifications Change Re One-Time Extension of Containment Type a Test Interval | |