RA-21-0312, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)22 November 2021Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)Post Accident Monitoring
IR 05000261/202100525 August 2021Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005)Fitness for Duty
Cyber Security
Exemption Request
COVID-19
RA-19-0223, Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.4630 May 2019Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.46
RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2)2 April 2018Report of Changes Pursuant to 10 CFR 50.59(d)(2)Unanalyzed Condition
Open Phase Condition
Fire Watch
Overspeed trip
ML16281A51015 December 2016Staff Assessment of the Reactor Vessel Internals Aging Management Program PlansAging Management
Stress corrosion cracking
License Renewal
RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors31 October 2016Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation MonitorsPost Accident Monitoring
RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors5 October 2016Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation MonitorsPost Accident Monitoring
RA-16-0024, Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-3008-P3 October 2016Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-3008-PSafe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Anticipated operational occurrence
Post Accident Monitoring
Nondestructive Examination
Annual Radiological Environmental Operating Report
Process Control Program
Fuel cladding
Coast down
Affidavit
Manual Operator Action
RNP-RA/16-0038, Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-17425 May 2016Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-174Hot Short
Safe Shutdown
High winds
Mission time
Fire Barrier
Time to boil
Enforcement Discretion
Probabilistic Risk Assessment
Fire impairment
Operator Manual Action
Multiple Spurious Operation
Significance Determination Process
Thermoset
Large early release frequency
Exemption Request
Fire Protection Program
Fire Watch
Very Early Warning Fire Detection
ML15253A41011 March 2016Enclosure 2 Screening Analysis ReportUltimate heat sink
Tornado Missile
Fukushima Dai-Ichi
Earthquake
Generic Issues Program
RA-15-0047, Annual Report of Changes Pursuant to 10 CFR 50.4617 November 2015Annual Report of Changes Pursuant to 10 CFR 50.46
ML15280A19919 October 2015Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force ReviewSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
RNP-RA/15-0053, Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04)19 August 2015Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Mission time
Fire Barrier
Tornado Missile
Time to boil
FLEX
B.5.b
Fukushima Dai-Ichi
Severe Accident Management Guideline
Time Critical Operator Action
Earthquake
Scaffolding
Weak link
GOTHIC
Unidentified leakage
RNP-RA/15-0018, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel26 February 2015Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux ChannelPost Accident Monitoring
RNP-RA/14-0037, Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System8 April 2014Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System
RNP-RA/14-0012, Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3....12 March 2014Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3....
RNP-RA/13-0079, Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure Transmitter21 August 2013Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure TransmitterPost Accident Monitoring
RNP-RA/13-0066, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication24 June 2013Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve IndicationPost Accident Monitoring
RNP-RA/13-0037, Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 201225 April 2013Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 2012
RNP-RA/11-0100, Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System23 November 2011Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System
ML11241135823 September 2011Final Precursor Analysis: Concurrent Unavailabilities - EDG B Inoperable Due to Failed Output Breaker and EDG a Unavailable Due to Testing and MaintenanceSignificance Determination Process
ML11241135923 September 2011Final Precursor Analysis: Electrical Fault Causes Fire and Subsequent Reactor Trip with a Loss of Reactor Coolant Pump Seal Injection and CoolingFitness for Duty
Arc flash
Significance Determination Process
Preliminary White Finding
ML11280052829 December 2010NRC 2011 Hb Robinson
ML1019304176 May 2010Tritium Database ReportOffsite Dose Calculation Manual
Hydrostatic
RNP-RA/08-0026, Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors7 March 2008Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water ReactorsBoric Acid
High Radiation Area
Fire Barrier
Coatings
Foreign Material Exclusion
Stress corrosion cracking
Exemption Request
Scaffolding
Manual Operator Action
RNP-RA/06-0062, Groundwater Protection - Data Collection Questionnaire24 July 2006Groundwater Protection - Data Collection Questionnaire
RNP-RA/06-0048, Request for Technical Specifications, Change Related to Containment Peak Pressure17 July 2006Request for Technical Specifications, Change Related to Containment Peak PressureUltimate heat sink
RA-05-0104, Transmittal of Core Operating Limits Report10 October 2005Transmittal of Core Operating Limits ReportShutdown Margin
ML04146024619 May 2004Q Report for Period Ending 03/31/2004
ML03247163222 August 2003Submittal of 10-Q ReportBoric Acid
ML03189093610 July 2003Relaxation of the Order, Exercising Enforcement Discretion, and Extension of the Time to Submit an Answer or Request a Hearing Regarding Order EA-03-038, Fitness-for-Duty Enhancements for Nuclear Security Force Personnel for Brunswick, CrysEnforcement Discretion
ML0317000276 June 2003Submittal of 10-O ReportBoric Acid
Power Uprate
RNP-RA/02-0028, Request for Technical Specifications Change Re One-Time Extension of Containment Type a Test Interval26 March 2002Request for Technical Specifications Change Re One-Time Extension of Containment Type a Test Interval