Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23304A39231 October 2023LLC Revision 1 to Standard Design Approval Application, Part 10, Quality Assurance Program Description
ML23304A39131 October 2023LLC Revision 1 to Standard Design Approval Application, Part 9, Withheld InformationUltimate heat sink
ML23304A39031 October 2023LLC Revision 1 to Standard Design Approval Application, Part 8, License- Conditions; Inspections, Tests, Analyses & Acceptance Criteria (ITAAC)Safe Shutdown
Boric Acid
Ultimate heat sink
Fire Barrier
Anticipated operational occurrence
Commercial Grade Dedication
Safe Shutdown Earthquake
Internal Flooding
Nondestructive Examination
Emergency Lighting
Incorporated by reference
Pressure Boundary Leakage
Fire Protection Program
ML23304A38931 October 2023LLC Revision 1 to Standard Design Approval Application, Part 7, ExemptionsSafe Shutdown
Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Hydrostatic
Incorporated by reference
Exemption Request
Fuel cladding
Failure to Scram
ML23304A38831 October 2023LLC Revision 1 to Standard Design Approval Application, Part 4, US460 Generic Technical Specifications, Vol. 2Safe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Fire Barrier
Stroke time
Anticipated operational occurrence
Tornado Missile
Internal Flooding
Hydrostatic
Incorporated by reference
Missed surveillance
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Operability Determination
Power-Operated Valves
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Power change
Unidentified leakage
ML23304A38731 October 2023LLC Revision 1 to Standard Design Approval Application, Part 4, US460 Generic Technical Specifications, Vol. 1Safe Shutdown
Boric Acid
Time of Discovery
Shutdown Margin
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Hydrostatic
Nondestructive Examination
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Pressure Boundary Leakage
Fire Protection Program
Power change
Unidentified leakage
ML23304A31731 October 2023LLC, Revision 1 to Standard Design Approval Application, Part 1, General and Financial Information
ML23304A31631 October 2023LLC, Submittal of Revision 1 to Standard Design Approval ApplicationProbabilistic Risk Assessment
Affidavit