Issue date | Title | Topic | |
---|---|---|---|
ML21264A533 | 21 September 2021 | PWR Owners Group - Transmittal of the NRC Approved Version of Topical Report, PWROG-19047-P-A/NP-A, Revision 0, North Anna Units 1 and 2 Reactor Vessels Low Upper-Shelf Fracture Toughness Equivalent Margin Analysis, PA-MSC-1481 | |
ML21180A416 | 22 June 2021 | PWR Owners Group, Comments on the NRC Draft Safety Evaluation for PWROG-19047-P/NP, Revision 0, North Anna Units 1 and 2 Reactor Vessels Low Upper-Shelf Fracture Toughness Equivalent Margin Analysis (PA-MSC-1481) | |
ML20192A249 | 15 July 2020 | Nonprop Final SE Cover Letter for PWROG-17018 LCF 7-10 | |
ML20149K668 | 27 May 2020 | PWR Owners Group, Submittal of PWROG-19047-P/NP, Revision 0, North Anna, Units 1 and 2, Reactor Vessels Low Upper-Shelf Fracture Toughness, Equivalent Margin Analysis (PA-MSC-1481) | |
ML20134M356 | 26 May 2020 | Final Safety Evaluation by the Office of Nuclear Reactor Regulation Topical Report PWROG-18034-P, Revision 0, Updates to the Methodology for Evaluating the Acceptability of Baffle-Former-Barrel Bolting Distributions Under Faulted Load Condi | |
ML20133P693 | 15 May 2020 | U.S. Nuclear Regulatory Commission Verification Letter for the Pressurized Water Reactor Owners Group Topical Report PWROG-17034, Revision 0, Evaluation of the WCAP-10325-P-A Westinghouse LOCA Mass & Energy Release Methodology | |
ML20090A019 | 30 March 2020 | U.S. Nuclear Regulatory Commission Verification Letter for the Pressurized Water Reactor Owner'S Group Topical Report PWROG-17090-NP, Revision 0, Generic Rotterdam Forging and Weld Initial Upper-Shelf Energy Determination, | |
ML20085F603 | 30 March 2020 | Final Cover Letter Safety Evaluation by the Office of Nuclear Reactor Regulation for the Pressurized Water Reactor Owners Group Topical Report PWROG-17031-NP, Revision 1 | |
ML20028D714 | 24 February 2020 | U.S. Nuclear Regulatory Commission Verification Letter for the Pressurized Water Reactor Owners Group Topical Report PWROG-17033, Revision 1 | |
ML19346F890 | 19 December 2019 | Cover Letter by the Office of Nuclear Reactor Regulation Topical Report for PWROG-18034-P, Revision 0, Updates to the Methodology in WCAP-15029-P-A, Rev 1, Westinghouse Methodology for Evaluating the Acceptability of Baffle-Former-Barrel Bo | |
ML19301D063 | 31 October 2019 | Cover Letter for the Final Safety Evaluation for the Topical Report PWROG-15109-NP, Revision 0, PWR Pressure Vessel Nozzle Appendix G Evaluation, | Anticipated operational occurrence Hydrostatic |
ML19300A001 | 29 October 2019 | Cover Letter for Draft SE for Topical Report PWROG-17031-NP, Revision 1, Update for Subsequent License Renewal: WCAP-15338-A, a Review of Cracking Associated with Weld Deposited Cladding in Operating PWR Plants | |
ML18192B617 | 9 October 2019 | Verification Letter of the Approval Versions of the Pressured Water Reactor Owners Group Topical Report BAW-1543, Revision 4, Supplement 7-A Supplement to the Master Integrated Reactor Vessel Surveillances Program | |
ML19198A051 | 11 September 2019 | Final Safety Evaluation for Pressurized Water Reactor Owners Group Topical Report PWROG-17011-NP, Revision 1 Report, Update for Subsequent License Renewal: WCAP-14535A, 'Topical Report on Reactor Coolant Pump Flywheel Inspection Elimination | |
ML19226A259 | 11 September 2019 | Draft Safety Evaluation for Pressurized Water Reactor Owners Group Topical Report PWROG-17090-NP, Revision 0 Generic Rotterdam Forging and Weld Initial Upper-Shelf Energy Determination Pressurized Water Reactor Owners Group Westinghouse Ele | |
ML19225D179 | 23 August 2019 | Verification Letter of the Approval Version of the Pressurized Water Reactor Owners Group Topical Report WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical | |
ML19158A266 | 25 June 2019 | Draft Safety Evaluation by the Office of Nuclear Reactor Regulation for Topical Report PWROG-15109-NP, Revision 0, PWR Pressure Vessel Nozzle Appendix G Evaluation | Anticipated operational occurrence Hydrostatic |
ML19106A196 | 29 April 2019 | Letter - Final Safety Evaluations for Baw 2192, Supplement 1NP, Revision 0, and Baw 2178, Supplement 1NP, Revision 0 | |
ML19073A216 | 26 March 2019 | Acceptance for Review of the Pressurized Water Reactor Owners Group Topical Report PWROG-18034-P and PWROG-18034-NP, Revision 0, Updates to the Methodology in WCAP-15029-P-A, Rev. 1 | |
ML19072A103 | 19 March 2019 | Cover Letter for Draft Safety Evaluation for Topical Report, PWROG-17011 | |
ML18333A124 | 7 December 2018 | Transmittal Letter Regarding Final Safety Evaluation for BAW-2192, Supplement 1, Revision 0, and BAW-2178, Supplement 1, Revision 0 | |
ML18311A297 | 30 November 2018 | Staff Re-Evaluation of Closure Path for Generic Safety Issue 191 and Generic Letter 2004-02 | |
ML18236A378 | 5 September 2018 | Transmittal Letter Regarding Draft Safety Evaluation for Topical Report BAW-2192, Supplement 1, Revision 0, and Topical Report BAW-2178, Supplement 1, Revision 0 | |
ML18186A625 | 22 August 2018 | Transmittal Letter Regarding Draft SE for Pressurized Water Reactor Owners Group Topical Report PWROG-16043-P, Revision 2 | |
ML18191B303 | 12 July 2018 | Regulatory Audit Plan for June 26-29, 2018, Audit of Changes to Thermal Hydraulic Methodologies in Responses to Request for Additional Information for Topical Report WCAP-17788-P Comprehensive Analysis and Test Program for GSI-191 Closure | |
ML18170A113 | 14 June 2018 | PWR Owners Group - Transmittal of PWROG-17033-P (&Np), Revision 1, Update for Subsequent License Renewal: WCAP-13045, Compliance to ASME Code Case N-481 of the Primary Loop Pump Casings of Westinghouse Type Nuclear Steam Supply Systems | |
ML18116A031 | 12 June 2018 | Acceptance for Review of the Pressurized Water Reactor Owners Group Topical Report PWROG-17090-NP, Revision 0, Generic Rotterdam Forging and Weld Initial Upper-Shelf Energy Determination | |
ML18143B496 | 15 May 2018 | PWR Owners Group Transmittal of PWROG-17011-NP, Rev 1, Update for Subsequent License Renewal: WCAP-14535A, Topical Report on Reactor Coolant Pump Flywheel Inspection Elimination and WCAP-15666-A, Extension of Reactor Coolant Pump Motor Flyw | Liquid penetrant |
ML18116A030 | 9 May 2018 | Acceptance for Review of the Pressurized Water Reactor Owners Group Topical Report PWROG-15109-NP, Revision 0, PWR Pressure Vessel Nozzle Appendix G Evaluation | |
ML18116A029 | 9 May 2018 | Acceptance for Review of the Pressured Water Reactor Owners Group Topical Report PWROG-17034-P Revision 0, Evaluation of the WCAP-10325-P-A Westinghouse LOCA Mass & Energy Release Methodology | |
ML18081A007 | 24 April 2018 | Letter for Draft Safety Evaluation for Pressurized Water Reactor Owners Group Topical Report WCAP-17661, Improved RAOC and CAOC Fq Surveillance Technical Specifications | |
ML18038A347 | 27 March 2018 | Transmittal Letter for Final Safety Evaluation for Pressurized Water Reactor Owners Group Topical Report BAW-1543, Revision 4, Supplement 7 | |
ML18057A080 | 13 March 2018 | Acceptance for Review of the Pressurized Water Reactor Owners Group Topical Report PWROG-17018-PINP, Solid State Protection System General Warning Alarm Modification. | |
ML18043A565 | 12 March 2018 | Requests for Withholding Information from Public Disclosure the March 17, 2017, Pressurized Water Reactor Owners Group, Submission | |
ML18043A508 | 12 March 2018 | Requests for Withholding Information from Public Disclosure the December 11, 2017, Pressurized Water Reactor Owners Group, Submission | |
ML18044A328 | 7 March 2018 | Requests for Withholding Information from Public Disclosure the January 2, 2014, Pressurized Water Reactor Owners Group (Pwrog), Submission | |
ML18044A224 | 7 March 2018 | Requests for Withholding Information from Public Disclosure the December 11, 2017, Pressurize Water Reactor Owners Group (Pwrog), Submission | |
ML18044A065 | 7 March 2018 | Requests for Withholding Information from Public Disclosure the October 19, 2017, Pressurized Water Reactor Owners Group (Pwrog), Submission | |
ML18044A047 | 7 March 2018 | Requests for Withholding Information from Public Disclosure the February 1, 2018, Pressurized Water Reactor Owners Group (Pwrog), Submission | |
ML18053A154 | 6 March 2018 | Acceptance for Review of the Pressurized Water Reactor Owners Group Topical Report BAW-2192-P, Supplement 1, Revision 0, Low Upper-Shelf Toughness Fracture Mechanics Analysis of Reactor Vessels of B&W Owners Reactor Vessel Working Group for | |
ML18053A149 | 6 March 2018 | Acceptance for Review of the Pressurized Water Reactor Owners Group Topical Report BAW-2178-P, Supplement 1, Revision 0, Low Upper-Shelf Toughness Fracture Mechanics Analysis of Reactor Vessel of B&W Owners Reactor Vessel Working Group for | |
ML18022A137 | 6 February 2018 | Verification Letter of the Approval Version of the Pressurized Water Reactor Owners Group Topical Report PWROG-14001-P, Revision 1, PRA Model for the Generation III Westinghouse Shutdown Seal | |
ML18029A203 | 19 December 2017 | PWR Owners Group - Submittal of Responses to NRC Requests for Additional Information and Revisions to Topical Report WCAP-17788-P/WCAP-17788-NP, Revision 0, Comprehensive Analysis and Test Program for GS1-191 Closure Related to Volumes 1 an | |
ML071550225 | 25 May 2007 | PWR Owners Group - Draft Revisions to Topical Report WCAP-15791 Revision 1, Risk-Informed Evaluation of Extensions to Containment Isolation Valve Completion Times, and the Final Safety Evaluation, MUHP-3010/LSC-0029/LSC-0135 | |
ML043000155 | 20 October 2004 | Westinghouse Owners Group - Comparison of Crossflow and ASME Flow Section Feedwater Flow Measurement at Kewaunee Nuclear Power Plant | |
ML042390214 | 20 August 2004 | Westinghouse Owners Group Request to Withdraw WCAP-16168-NP, Risk-Informed Extension of Reactor Vessel In-Service Inspection Interval, (PA-MSC-0120) | |
ML040480309 | 30 January 2004 | WOG CE Fleet Pressurizer Heater Sleeve Inspection Program. Includes Attachment 1 - Scheduled Refueling Outages for Plants in the CE Fleet | Nondestructive Examination |
ML033230225 | 12 November 2003 | Submittal of WCAP-16084-NP, Development of Risk-Informed Safety Analysis Approach and Pilot Application. | Anticipated operational occurrence Probabilistic Risk Assessment Fuel cladding Coast down |
ML030770504 | 12 March 2003 | Request for Review of TSTF-421, Rev. 0 (MUHP-3043) | |
ML023380536 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |