|
---|
Category:Letter
MONTHYEARML21264A5332021-09-21021 September 2021 PWR Owners Group - Transmittal of the NRC Approved Version of Topical Report, PWROG-19047-P-A/NP-A, Revision 0, North Anna Units 1 and 2 Reactor Vessels Low Upper-Shelf Fracture Toughness Equivalent Margin Analysis, PA-MSC-1481 ML21180A4162021-06-22022 June 2021 PWR Owners Group, Comments on the NRC Draft Safety Evaluation for PWROG-19047-P/NP, Revision 0, North Anna Units 1 and 2 Reactor Vessels Low Upper-Shelf Fracture Toughness Equivalent Margin Analysis (PA-MSC-1481) ML20192A2492020-07-15015 July 2020 Nonprop Final SE Cover Letter for PWROG-17018 LCF 7-10 ML20149K6682020-05-27027 May 2020 PWR Owners Group, Submittal of PWROG-19047-P/NP, Revision 0, North Anna, Units 1 and 2, Reactor Vessels Low Upper-Shelf Fracture Toughness, Equivalent Margin Analysis (PA-MSC-1481) ML20134M3562020-05-26026 May 2020 Final Safety Evaluation by the Office of Nuclear Reactor Regulation Topical Report PWROG-18034-P, Revision 0, Updates to the Methodology for Evaluating the Acceptability of Baffle-Former-Barrel Bolting Distributions Under Faulted Load Condi ML20133P6932020-05-15015 May 2020 U.S. Nuclear Regulatory Commission Verification Letter for the Pressurized Water Reactor Owners Group Topical Report PWROG-17034, Revision 0, Evaluation of the WCAP-10325-P-A Westinghouse LOCA Mass & Energy Release Methodology ML20090A0192020-03-30030 March 2020 U.S. Nuclear Regulatory Commission Verification Letter for the Pressurized Water Reactor Owner'S Group Topical Report PWROG-17090-NP, Revision 0, Generic Rotterdam Forging and Weld Initial Upper-Shelf Energy Determination, ML20085F6032020-03-30030 March 2020 Final Cover Letter Safety Evaluation by the Office of Nuclear Reactor Regulation for the Pressurized Water Reactor Owners Group Topical Report PWROG-17031-NP, Revision 1 ML20028D7142020-02-24024 February 2020 U.S. Nuclear Regulatory Commission Verification Letter for the Pressurized Water Reactor Owners Group Topical Report PWROG-17033, Revision 1 ML19346F8902019-12-19019 December 2019 Cover Letter by the Office of Nuclear Reactor Regulation Topical Report for PWROG-18034-P, Revision 0, Updates to the Methodology in WCAP-15029-P-A, Rev 1, Westinghouse Methodology for Evaluating the Acceptability of Baffle-Former-Barrel Bo ML19301D0632019-10-31031 October 2019 Cover Letter for the Final Safety Evaluation for the Topical Report PWROG-15109-NP, Revision 0, PWR Pressure Vessel Nozzle Appendix G Evaluation, ML19300A0012019-10-29029 October 2019 Cover Letter for Draft SE for Topical Report PWROG-17031-NP, Revision 1, Update for Subsequent License Renewal: WCAP-15338-A, a Review of Cracking Associated with Weld Deposited Cladding in Operating PWR Plants ML19198A0512019-09-11011 September 2019 Final Safety Evaluation for Pressurized Water Reactor Owners Group Topical Report PWROG-17011-NP, Revision 1 Report, Update for Subsequent License Renewal: WCAP-14535A, 'Topical Report on Reactor Coolant Pump Flywheel Inspection Elimination ML19226A2592019-09-11011 September 2019 Draft Safety Evaluation for Pressurized Water Reactor Owners Group Topical Report PWROG-17090-NP, Revision 0 Generic Rotterdam Forging and Weld Initial Upper-Shelf Energy Determination Pressurized Water Reactor Owners Group Westinghouse Ele ML19225D1792019-08-23023 August 2019 Verification Letter of the Approval Version of the Pressurized Water Reactor Owners Group Topical Report WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical ML19158A2662019-06-25025 June 2019 Draft Safety Evaluation by the Office of Nuclear Reactor Regulation for Topical Report PWROG-15109-NP, Revision 0, PWR Pressure Vessel Nozzle Appendix G Evaluation ML19106A1962019-04-29029 April 2019 Letter - Final Safety Evaluations for Baw 2192, Supplement 1NP, Revision 0, and Baw 2178, Supplement 1NP, Revision 0 ML19073A2162019-03-26026 March 2019 Acceptance for Review of the Pressurized Water Reactor Owners Group Topical Report PWROG-18034-P and PWROG-18034-NP, Revision 0, Updates to the Methodology in WCAP-15029-P-A, Rev. 1 ML19072A1032019-03-19019 March 2019 Cover Letter for Draft Safety Evaluation for Topical Report, PWROG-17011 ML18333A1242018-12-0707 December 2018 Transmittal Letter Regarding Final Safety Evaluation for BAW-2192, Supplement 1, Revision 0, and BAW-2178, Supplement 1, Revision 0 ML18311A2972018-11-30030 November 2018 Staff Re-Evaluation of Closure Path for Generic Safety Issue 191 and Generic Letter 2004-02 ML18236A3782018-09-0505 September 2018 Transmittal Letter Regarding Draft Safety Evaluation for Topical Report BAW-2192, Supplement 1, Revision 0, and Topical Report BAW-2178, Supplement 1, Revision 0 ML18186A6252018-08-22022 August 2018 Transmittal Letter Regarding Draft SE for Pressurized Water Reactor Owners Group Topical Report PWROG-16043-P, Revision 2 ML18191B3032018-07-12012 July 2018 Regulatory Audit Plan for June 26-29, 2018, Audit of Changes to Thermal Hydraulic Methodologies in Responses to Request for Additional Information for Topical Report WCAP-17788-P Comprehensive Analysis and Test Program for GSI-191 Closure ML18170A1132018-06-14014 June 2018 PWR Owners Group - Transmittal of PWROG-17033-P (&Np), Revision 1, Update for Subsequent License Renewal: WCAP-13045, Compliance to ASME Code Case N-481 of the Primary Loop Pump Casings of Westinghouse Type Nuclear Steam Supply Systems ML18116A0312018-06-12012 June 2018 Acceptance for Review of the Pressurized Water Reactor Owners Group Topical Report PWROG-17090-NP, Revision 0, Generic Rotterdam Forging and Weld Initial Upper-Shelf Energy Determination ML18143B4962018-05-15015 May 2018 PWR Owners Group Transmittal of PWROG-17011-NP, Rev 1, Update for Subsequent License Renewal: WCAP-14535A, Topical Report on Reactor Coolant Pump Flywheel Inspection Elimination and WCAP-15666-A, Extension of Reactor Coolant Pump Motor Flyw ML18116A0292018-05-0909 May 2018 Acceptance for Review of the Pressured Water Reactor Owners Group Topical Report PWROG-17034-P Revision 0, Evaluation of the WCAP-10325-P-A Westinghouse LOCA Mass & Energy Release Methodology ML18116A0302018-05-0909 May 2018 Acceptance for Review of the Pressurized Water Reactor Owners Group Topical Report PWROG-15109-NP, Revision 0, PWR Pressure Vessel Nozzle Appendix G Evaluation ML18081A0072018-04-24024 April 2018 Letter for Draft Safety Evaluation for Pressurized Water Reactor Owners Group Topical Report WCAP-17661, Improved RAOC and CAOC Fq Surveillance Technical Specifications ML18038A3472018-03-27027 March 2018 Transmittal Letter for Final Safety Evaluation for Pressurized Water Reactor Owners Group Topical Report BAW-1543, Revision 4, Supplement 7 ML18057A0802018-03-13013 March 2018 Acceptance for Review of the Pressurized Water Reactor Owners Group Topical Report PWROG-17018-PINP, Solid State Protection System General Warning Alarm Modification. ML18043A5082018-03-12012 March 2018 Requests for Withholding Information from Public Disclosure the December 11, 2017, Pressurized Water Reactor Owners Group, Submission ML18043A5652018-03-12012 March 2018 Requests for Withholding Information from Public Disclosure the March 17, 2017, Pressurized Water Reactor Owners Group, Submission ML18044A0472018-03-0707 March 2018 Requests for Withholding Information from Public Disclosure the February 1, 2018, Pressurized Water Reactor Owners Group (Pwrog), Submission ML18044A0652018-03-0707 March 2018 Requests for Withholding Information from Public Disclosure the October 19, 2017, Pressurized Water Reactor Owners Group (Pwrog), Submission ML18044A2242018-03-0707 March 2018 Requests for Withholding Information from Public Disclosure the December 11, 2017, Pressurize Water Reactor Owners Group (Pwrog), Submission ML18044A3282018-03-0707 March 2018 Requests for Withholding Information from Public Disclosure the January 2, 2014, Pressurized Water Reactor Owners Group (Pwrog), Submission ML18053A1542018-03-0606 March 2018 Acceptance for Review of the Pressurized Water Reactor Owners Group Topical Report BAW-2192-P, Supplement 1, Revision 0, Low Upper-Shelf Toughness Fracture Mechanics Analysis of Reactor Vessels of B&W Owners Reactor Vessel Working Group for ML18053A1492018-03-0606 March 2018 Acceptance for Review of the Pressurized Water Reactor Owners Group Topical Report BAW-2178-P, Supplement 1, Revision 0, Low Upper-Shelf Toughness Fracture Mechanics Analysis of Reactor Vessel of B&W Owners Reactor Vessel Working Group for ML18022A1372018-02-0606 February 2018 Verification Letter of the Approval Version of the Pressurized Water Reactor Owners Group Topical Report PWROG-14001-P, Revision 1, PRA Model for the Generation III Westinghouse Shutdown Seal 2021-09-21
[Table view] |
Text
PWROG 1'~-<.o 0 wners G May 15, 2018 OG-18-123 U.S. Nuclear Regulatory Commission Document Control Desk 11555 Rockville Pike Rockville, MD 20852
Subject:
PWR Owners Group Program Management Office 20 International Drive Windsor, Connecticut 06095 PWROG-17011-NP, Revision 1 Project Number 99902037 PWROG-17011-NP, Rev 1, "Update for Subsequent License Renewal:
Reference:
WCAP-14535A, "Topical Report on Reactor Coolant Pump Flywheel Inspection Elimination" and WCAP-15666-A, "Extension of Reactor Coolant Pump Motor Flywheel Examination," PA-MSC-1500 NRC Regulatory Issue Summary 2014-11, "Information on Licensing Applications for Fracture Toughness Requirements for Ferritic Reactor Coolant Pressure Boundary Components," October 2014 The purpose of this letter is to transmit Pressurized Water Reactor Owners Group (PWROG) Topical Report (TR), PWROG-17011-NP, Revision 1, "Update for Subsequent License Renewal: WCAP-14535A, "Topical Report on Reactor Coolant Pump Flywheel Inspection Elimination" and WCAP-15666-A, "Extension of Reactor Coolant Pump Motor Flywheel Examination" in accordance with the Nuclear Regulatory Commission (NRC) TR program for review and acceptance for referencing in regulatory actions (Enclosure 1). Topical Report Summary The purpose of this topical report (TR) is to extend the applicability of WCAP-14535A and WCAP-15666-A to subsequent license renewal (SLR), i.e., 80 years of operation.
Westinghouse provided the technical basis in WCAP-14535A for the elimination of inspection requirements for the reactor coolant pump (RCP) motor flywheels for all operating domestic Westinghouse and several B&W plants. The NRC issued a Safety Evaluation Report (SER) in September 12, 1996, accepting the technical arguments but did not allow for total elimination of examinations as WCAP-14535A requested.
The SER provided partial relief from the reactor coolant pump (RCP) motor flywheels examination requirements in NRC RG 1.14, by allowing an extension in the examination frequency from 40 months to 10 years. It further relaxed the RG 1.14 examination guidance by recommending an in-place ultrasonic examination (UT) over the volume from the inner bore of the flywheel to the circle of one-half the outer radius or an alternative surface examination, i.e., magnetic particle testing (MT) and/or liquid penetrant testing (PT), of the exposed surfaces defined by the volume of disassembled flywheel f~ / 0 11<.t.
PWROG ASC Participants in MSC-1091 OG-18-123 May 15, 2018 Page 2 of 3 WCAP-15666-A is a follow-up TR that justified extending the 10 year inspection frequency that was approved by the NRC in WCAP-14535A, to 20 years. WCAP-15666-A demonstrated that the deterministic results in WCAP-14535A remain valid, and also performed a failure probability analysis to show that the change in risk for a 20 year inspection frequency meet the Regulation Guide 1.174 acceptance guidelines.
The NRC SER for WCAP-15666-A concluded that both the deterministic and probabilistic calculations contained in WCAP-15666-A were acceptable, and approved the 20-year inspection frequency.
Limits of Applicability WCAP-14535A is applicable to the RCP motor flywheels in all domestic Westinghouse Nuclear Steam Supply System (NSSS) plants, and Oconee Units 1, 2, and 3, Davis Besse, and Three Mile Island Unit 1, which are Babcock and Wilcox (B&W) NSSS plants. WCAP-15666-A is applicable to plants with Westinghouse-designed NSSS. Although it included some data for B&W NSSS plants, however, the TR and the NRC SER did not specifically address the applicability of the risk assessments and other evaluations to the three B&W NSSS plants that WCAP-14535-A was applicable to. The following is a quote from the NRC SER for WCAP-15666-A: "The NRC staff acknowledges that some of the supporting material for TSTF-421 may also help to support plant-specific applications for the B & W units included in portions of WCAP-15666.
The NRC staff will work with licensees for the applicable B & W units to ensure that our processes work as efficiently as possible for those applying for license amendments similar to that described in TSTF-421.
The affected licensees are encouraged to discuss this matter with the NRC staff before submitting an application. " This same applicability is carried over for the TR presented herein. This TR is not applicable to Combustion Engineering (CE) NSSS plants, with the exception of Calvert Cliffs Units 1 and 2. This TR is applicable to Calvert Cliff Units 1 and 2 as these plants have Westinghouse RCP motors and flywheels.
However, these flywheels and motor operating speeds are different than those evaluated in WCAP-15666-A.
Westinghouse performed a plant-specific evaluation for Calvert Cliffs Unit 1 and 2 for 80 years, that applied the same methods detailed in WCAP-15666-A for 60 years of operation.
Intended Application Licensees will reference PWROG-17011-NP as the basis for their inspection frequencies during subsequent license renewal operations.
Industry Implementation WCAP-17011-NP can be implemented by all applicable U. S. PWRs as listed in the Limits of Applicability section above. Electronically Approved Records are Authenticated in the Electronic Document Management System
- PWROG ASC Participants in MSC-1091 OG-18-123 Specialized Resource Availability May 15, 2018 Page 3 of 3 This TR is being submitted to the NRC for review and approval so that the NRC approved version can be utilized by licensees.
Licensees will reference PWROG-17011-NP as the basis for flywheel inspection frequencies during extended operating license periods. NRC approval of the generic TR will reduce the impact on both licensee and NRC resources by eliminating the need for the preparation of and NRC review of plant specific justifications for these inspection frequencies.
NRC Review Schedule The PWROG requests that the NRC complete their review of the TR by October 2019. This letter transmits one copy of PWROG-17011-NP, Revision 1 (Enclosure 1). Correspondence related to this transmittal should be addressed to: Mr. W. Anthony Nowinowski, Program Manager PWR Owners Group, Program Management Office Westinghouse Electric Company 1000 Westinghouse Drive Suite 386 Cranberry Township, Pennsylvania, 16066 If you have any questions, please do not hesitate to contact me at (805) 545-4328 or Mr. W. Anthony
- Nowinowski, Program Manager of the PWR Owners Group, Program Management Office at (412) 374-6855.
Sincerely yours, Ken Schrader, Chief Operating Officer and Chairman PWR Owners Group KS:WAN:am Enclosure 1: One copy of PWROG-17011-NP, Revision 1 cc: PWROG Management Committee PWROG Materials Committee PWROG Steering Committee PWROG Licensing Committee PWROGPMO B. Benney, US NRC P. Atkin, DOM J. Andrachek, Westinghouse J.B. Hall, Westinghouse B. Mays, Westinghouse D.B. Lynch, Westinghouse L. Patterson, Westinghouse Electronically Approved Records are Authenticated in the Electronic Document Management System