ML23325A20621 November 2023Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection SystemAffidavit
ML23317A11910 November 2023Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred PremiumsAffidavit
ML23212B23631 July 2023Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System - WEC DocumentsSafe Shutdown
Time of Discovery
Anticipated operational occurrence
Post Accident Monitoring
Squib
Cyber Security
Incorporated by reference
Feedwater Controller Failure
Large early release frequency
Fuel cladding
Coast down
ML23177A22426 June 2023Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection .Safe Shutdown
Post Accident Monitoring
Probabilistic Risk Assessment
Operator Manual Action
Scram Discharge Volume
Excess Flow Check Valve
Affidavit
ML23095A2235 April 2023Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)- Human FactorsSafe Shutdown
Post Accident Monitoring
Probabilistic Risk Assessment
Operator Manual Action
Scram Discharge Volume
Minimum staff
Affidavit
ML22320A55916 November 20222022 Annual Report - Guarantees of Payment of Deferred Premiums
ML22301A17428 October 2022Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt)
ML22224A14915 August 2022Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Revision 2, July 2022, and the Licensing Technical Report for the Limerick Generating Station Units 1&2 Digital
ML22080A19918 March 2022Affidavit for Proprietary Presentation for March 31, 2022 Pre-Submittal Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2
ML22046A07414 February 2022Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Rev 1. Without Attachment 3 EnclosureAnticipated operational occurrence
Post Accident Monitoring
Feedwater Controller Failure
Fuel cladding
Coast down
ML21307A0542 November 2021Annual Report - Guarantees of Payment of Deferred Premiums
ML21272A27729 September 2021Update to Application for Order Approving License Transfers and Proposed Conforming License Amendments
ML21182A10030 June 2021Proposed Alternative to Utilize Code Case N-893
RS-21-070, Proposed Alternative to Utilize Code Case N-89330 June 2021Proposed Alternative to Utilize Code Case N-893
ML21084A17923 March 2021Introduction of High Burnup Lead Use Assemblies
ML21057A27325 February 2021Application for Order Approving License Transfers and Proposed Conforming License AmendmentsDecommissioning Funding Plan
NMP1L3371, Summary of Changes, Quality Assurance Topical Report, NO-AA-10 & Decommissioning Quality Assurance Program, NO-DC-1010 February 2021Summary of Changes, Quality Assurance Topical Report, NO-AA-10 & Decommissioning Quality Assurance Program, NO-DC-10
ML20310A1154 November 2020Annual Report - Guarantees of Payment of Deferred Premiums
ML20273A21529 September 2020License Amendment Request: Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits ReportShutdown Margin
Anticipated operational occurrence
Hydrostatic
Abnormal operational transient
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Process Control Program
Pressure Boundary Leakage
ML19318G17014 November 20192019 Annual Report - Guarantees of Payment of Deferred Premiums
ML18316A0037 November 2018Submittal of 2018 Annual Report - Guarantees of Payment of Deferred Premiums
ML15323A25719 November 2015License Amendment Request - Safety Limit Minimum Critical Power Ratio ChangeAbnormal operational transient
Minimum Critical Power Ratio
Fuel cladding
ML15254A41431 August 2015Revision of the Core Operating Limits Report (COLR) for Reload 15, Cycle 16
ML14321A70514 November 20142014 Annual Report - Guarantees of Payment of Deferred Premiums
ML14204A70923 July 2014Enclosure 3, Affidavit of Peter M. Yandow
RS-14-160, Co. - Submission of Standard Practice Procedure Plans and Foreign Ownership Control or Influence Package2 July 2014Co. - Submission of Standard Practice Procedure Plans and Foreign Ownership Control or Influence Package
ML14112A58311 April 2014Issuance of the Core Operating Limits Report for Cycle 16 Revision 11
ML13123A03426 April 2013Issuance of the Core Operating Limits Report for Cycle 15, Revision 10
RS-12-227, Exelongeneration, Submission of Standard Practice Procedure Plans and Updated Foreign Ownership Control or Influence Package19 December 2012Exelongeneration, Submission of Standard Practice Procedure Plans and Updated Foreign Ownership Control or Influence Package
ML11270006826 September 2011Enclosure 3, Mfn 10-245 R4, AffidavitChannel-control blade interference
ML11049057217 February 2011Response to Request for Additional Information Concerning the Safety Limit Minimum Critical Power Ratio Change License Amendment RequestShutdown Margin
Minimum Critical Power Ratio
ML1031904268 November 2010Corp. - 2010 Annual Report - Guarantees of Payment of Deferred Premiums
ML10085039118 March 2010GE-Hitachi Nuclear Energy Americas, LLC Affidavit Requesting That GEH Proprietary Report, NEDC-33484P Be Withheld from Public Disclosure
ML05200032814 July 2005Surveillance Program for Channel-Control Blade InterferenceChannel-control blade interference
ML05070001125 February 2005Response to Information Request Regarding Significance Determination Process Risk-informed Inspection NotebookSignificance Determination Process