Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23325A206 | 21 November 2023 | Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System | Affidavit |
ML23317A119 | 10 November 2023 | Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums | Affidavit |
ML23212B236 | 31 July 2023 | Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System - WEC Documents | Safe Shutdown Time of Discovery Anticipated operational occurrence Post Accident Monitoring Squib Cyber Security Incorporated by reference Feedwater Controller Failure Large early release frequency Fuel cladding Coast down |
ML23177A224 | 26 June 2023 | Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection . | Safe Shutdown Post Accident Monitoring Probabilistic Risk Assessment Operator Manual Action Scram Discharge Volume Excess Flow Check Valve Affidavit |
ML23095A223 | 5 April 2023 | Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)- Human Factors | Safe Shutdown Post Accident Monitoring Probabilistic Risk Assessment Operator Manual Action Scram Discharge Volume Minimum staff Affidavit |
ML22320A559 | 16 November 2022 | 2022 Annual Report - Guarantees of Payment of Deferred Premiums | |
ML22301A174 | 28 October 2022 | Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt) | |
ML22224A149 | 15 August 2022 | Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Revision 2, July 2022, and the Licensing Technical Report for the Limerick Generating Station Units 1&2 Digital | |
ML22080A199 | 18 March 2022 | Affidavit for Proprietary Presentation for March 31, 2022 Pre-Submittal Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 | |
ML22046A074 | 14 February 2022 | Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Rev 1. Without Attachment 3 Enclosure | Anticipated operational occurrence Post Accident Monitoring Feedwater Controller Failure Fuel cladding Coast down |
ML21307A054 | 2 November 2021 | Annual Report - Guarantees of Payment of Deferred Premiums | |
ML21272A277 | 29 September 2021 | Update to Application for Order Approving License Transfers and Proposed Conforming License Amendments | |
ML21182A100 | 30 June 2021 | Proposed Alternative to Utilize Code Case N-893 | |
RS-21-070, Proposed Alternative to Utilize Code Case N-893 | 30 June 2021 | Proposed Alternative to Utilize Code Case N-893 | |
ML21084A179 | 23 March 2021 | Introduction of High Burnup Lead Use Assemblies | |
ML21057A273 | 25 February 2021 | Application for Order Approving License Transfers and Proposed Conforming License Amendments | Decommissioning Funding Plan |
NMP1L3371, Summary of Changes, Quality Assurance Topical Report, NO-AA-10 & Decommissioning Quality Assurance Program, NO-DC-10 | 10 February 2021 | Summary of Changes, Quality Assurance Topical Report, NO-AA-10 & Decommissioning Quality Assurance Program, NO-DC-10 | |
ML20310A115 | 4 November 2020 | Annual Report - Guarantees of Payment of Deferred Premiums | |
ML20273A215 | 29 September 2020 | License Amendment Request: Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report | Shutdown Margin Anticipated operational occurrence Hydrostatic Abnormal operational transient Pressure and Temperature Limits Report Surveillance Frequency Control Program Process Control Program Pressure Boundary Leakage |
ML19318G170 | 14 November 2019 | 2019 Annual Report - Guarantees of Payment of Deferred Premiums | |
ML18316A003 | 7 November 2018 | Submittal of 2018 Annual Report - Guarantees of Payment of Deferred Premiums | |
ML15323A257 | 19 November 2015 | License Amendment Request - Safety Limit Minimum Critical Power Ratio Change | Abnormal operational transient Minimum Critical Power Ratio Fuel cladding |
ML15254A414 | 31 August 2015 | Revision of the Core Operating Limits Report (COLR) for Reload 15, Cycle 16 | |
ML14321A705 | 14 November 2014 | 2014 Annual Report - Guarantees of Payment of Deferred Premiums | |
ML14204A709 | 23 July 2014 | Enclosure 3, Affidavit of Peter M. Yandow | |
RS-14-160, Co. - Submission of Standard Practice Procedure Plans and Foreign Ownership Control or Influence Package | 2 July 2014 | Co. - Submission of Standard Practice Procedure Plans and Foreign Ownership Control or Influence Package | |
ML14112A583 | 11 April 2014 | Issuance of the Core Operating Limits Report for Cycle 16 Revision 11 | |
ML13123A034 | 26 April 2013 | Issuance of the Core Operating Limits Report for Cycle 15, Revision 10 | |
RS-12-227, Exelongeneration, Submission of Standard Practice Procedure Plans and Updated Foreign Ownership Control or Influence Package | 19 December 2012 | Exelongeneration, Submission of Standard Practice Procedure Plans and Updated Foreign Ownership Control or Influence Package | |
ML112700068 | 26 September 2011 | Enclosure 3, Mfn 10-245 R4, Affidavit | Channel-control blade interference |
ML110490572 | 17 February 2011 | Response to Request for Additional Information Concerning the Safety Limit Minimum Critical Power Ratio Change License Amendment Request | Shutdown Margin Minimum Critical Power Ratio |
ML103190426 | 8 November 2010 | Corp. - 2010 Annual Report - Guarantees of Payment of Deferred Premiums | |
ML100850391 | 18 March 2010 | GE-Hitachi Nuclear Energy Americas, LLC Affidavit Requesting That GEH Proprietary Report, NEDC-33484P Be Withheld from Public Disclosure | |
ML052000328 | 14 July 2005 | Surveillance Program for Channel-Control Blade Interference | Channel-control blade interference |
ML050700011 | 25 February 2005 | Response to Information Request Regarding Significance Determination Process Risk-informed Inspection Notebook | Significance Determination Process |