Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000247/2008012 | 2 June 2008 | Pre-Inspection Cover Sheet for Indian Point Unit 2, 50-247/2008-012 Inspection; Lead Inspector: J. Richmond | |
ML070940504 | 12 January 2007 | Ltr from Orise Dtd 01/12/2007, Final Letter Report for Requested Analyses of Six Water Samples, Set Eleven, from the Indian Point Power Station, Buchanan, New York (Inspection Report No. 05000247/2006-007) (Rfta No. 06-001) | |
IR 05000247/2006007 | 4 January 2007 | Ltr from Orise Dtd 01/04/2007, Final Letter Report for Requested Analyses of Nine Water Samples, Set Nine, from the Indian Point Power Station, Buchanan, New York (Inspection Report No. 05000247/2006007) (Rfta No. 06-001) | |
ML070940618 | 4 January 2007 | Ltr from Orise Dtd 01/04/2007, Final Letter Report for Requested Analyses of Nine Water Samples, Set Nine, from the Indian Point Power Station, Buchanan, New York (Inspection Report No. 05000247/2006007) (Rfta No. 06-001) | |
ML063490222 | 11 December 2006 | Inspection Requests Associated with IP 2&3 PI&R Inspection IR 50-247 & 286 06-006 | Temporary Modification |
ML070110559 | 3 November 2006 | Interim Report for Requested Analyses for Samples from Sets Seven Through Nine and Sets Eleven Through Fourteen, from the Indian Point Power Station, Buchanan, New York. (Inspection Report No. 050-247/2006-007) (Rfta No. 06-001) | |
IR 05000247/2006011 | 17 October 2006 | IR 05000247-06-011, and IR 05000286-06-009, Indian Point Nuclear Generating Units 2 and 3, Ti 2515/168 | Affidavit |
IR 05000003/2018006 | 12 October 2006 | IR 05000317-06-301 and IR 05000318-06/301 on 08/25, 08/28 - 09/01, 09/13 and 09/05-29/2006, Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Initial Operator Licensing Examination | |
ML070110602 | 11 October 2006 | Letter Report for Uranium Analysis of One Water Sample, Set Ten, from the Indian Point Power Station, Buchanan, New York. (Inspection Report No. 050-247/2006-007) (Rfta No. 06-001) | |
ML070110577 | 11 October 2006 | Report for Requested Reanalysis of One Vegetation Sample for Nickel-63, Set Seven, Collected Between June 14 and June 22, 2006 from the Indian Point Power Station, Buchanan, New York. (Inspection Report No. 050-247/2006-007) (Rfta No. 06-00 | |
ML070940534 | 15 March 2006 | Ltr from Orise Dtd 03/15/2006, Interim Report for Completed Analyses for Samples from Set Sixteen, from the Indian Point Power Station, Buchanan, New York (Inspection Report No. 05000247/2006007) (Rfta No. 06-001) | |
ML070940546 | 1 March 2006 | Ltr from Orise Dtd 03/01/2006, Second Interim Report for Completed Analyses for Samples from Set Fifteen, from the Indian Point Power Station, Buchanan, New York (Inspection Report No. 05000247/2006007) (Rfta No. 06-001) | |
ML060720148 | 13 February 2006 | Orise Split Sample Analytical Results from Indian Point | |
ML070940515 | 2 February 2006 | Ltr from Orise Dtd 02/02/2006, Second Interim Report for Requested Analyses of Eight Water Samples, Set Fourteen, from the Indian Point Power Station, Buchanan, New York (IR 05000247/2006007) (Rfta No. 06-001) | |
ML070940574 | 19 January 2006 | Ltr from Orise Dtd 01/19/2006, Final Report for Requested Analyses of Three Water Samples, Set Twelve, from the Indian Point Power Station, Buchanan, New York (Inspection Report No. 05000247/2006007) (Rfta No. 06-001) | |
IR 05000247/2003014 | 30 December 2003 | Physical Security Baseline Inspection Report Nos. 05000247-03-014 and 05000286-03-012 | |
IR 05000247/2001014 | 26 March 2002 | IR 05000247/2001-014, on 12/30-020/9/2002, Entergy Nuclear Operations, Inc.; Indian Point 2 Nuclear Power Plant. Design Control for Mitigating Systems, Barrier Integrity, and Cross-Cutting Issues. Non-cited Violations Identified | Safe Shutdown Packing leak Fire Barrier Probabilistic Risk Assessment Temporary Modification Missed surveillance Significance Determination Process Operability Determination Through Wall Leak |
IR 05000286/2001013 | 22 March 2002 | IR 05000286/2001-013, Entergy Nuclear Northeast, Indian Point 3 Nuclear Power Plant, Resident Inspection on 12/30/2001 - 02/16/2002 Related to Radiation Protection. No Violations Noted | High Radiation Area Locked High Radiation Area Operability Determination Unidentified leakage |
IR 05000286/2001007 | 1 October 2001 | IR 05000286/2001-007, Indian Point 3 Nuclear Power Plant. on 07/18/2001 Related to Safety and Compliance. Non-cited Violations Noted | Fire Barrier Past operability Temporary Modification Significance Determination Process Operability Determination Fire Watch |
ML012750182 | 1 October 2001 | IR 05000286/2001-007, Indian Point 3 Nuclear Power Plant. on 07/18/2001 Related to Safety and Compliance. Non-cited Violations Noted | Boric Acid Fire Barrier Past operability Temporary Modification Significance Determination Process Fire Watch |