NOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested | 21 October 1999 | Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested | |
NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan | 20 October 1999 | Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan | |
NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) | 19 October 1999 | Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) | |
NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule | 12 October 1999 | Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule | Generic Fundamentals Examination |
05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER | 12 October 1999 | Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER | |
NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future | 7 October 1999 | Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future | Boric Acid VT-2 Scaffolding |
NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) | 7 October 1999 | Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) | Nondestructive Examination |
NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) | 7 October 1999 | Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) | |
NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr | 30 September 1999 | Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr | |
05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment | 30 September 1999 | Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment | |
NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr | 28 September 1999 | Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr | |
NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P | 21 September 1999 | Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P | |
NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 | 21 September 1999 | Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 | |
NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl | 21 September 1999 | Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl | Stroke time |
05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER | 20 September 1999 | Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER | |
05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER | 13 September 1999 | Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER | Time of Discovery |
NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) | 9 September 1999 | Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) | |
NOC-AE-000562, Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i) | 31 August 1999 | Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i) | Nondestructive Examination |
NOC-AE-000617, Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d) | 26 August 1999 | Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d) | Fitness for Duty |
NOC-AE-000585, Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481 | 25 August 1999 | Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481 | VT-2 |
NOC-AE-000603, Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6) | 29 July 1999 | Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6) | |
NOC-AE-000470, Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl | 28 July 1999 | Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl | |
NOC-AE-000599, Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr | 28 July 1999 | Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr | |
NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000 | 26 July 1999 | Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000 | VT-2 |
05000498/LER-1999-006, Forwards LER 99-006-00 Re Automatic Reactor Trip Due to over-temp delta-temp Actuation.Licensee Commitments Are Listed in Corrective Actions Section of LER | 26 July 1999 | Forwards LER 99-006-00 Re Automatic Reactor Trip Due to over-temp delta-temp Actuation.Licensee Commitments Are Listed in Corrective Actions Section of LER | |
NOC-AE-000582, Forwards 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1. Summary Rept Satisfies Reporting Requirements of IWA-6000 of Section XI for Welds & Component Supports | 26 July 1999 | Forwards 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1. Summary Rept Satisfies Reporting Requirements of IWA-6000 of Section XI for Welds & Component Supports | |
NOC-AE-000598, Forwards Four Copies of 1RE08 Refueling Outage ISI Summary Rept for Steam Generator Tubing | 23 July 1999 | Forwards Four Copies of 1RE08 Refueling Outage ISI Summary Rept for Steam Generator Tubing | |
NOC-AE-000597, Forwards voltage-based Criteria 90-day Rept for SG Tube Exam Performed Under NRC GL 95-05 During Refueling Outage 1RE08. Rept Contains Info Required by Section 6.b of Attachment 2 to GL 95-05 | 23 July 1999 | Forwards voltage-based Criteria 90-day Rept for SG Tube Exam Performed Under NRC GL 95-05 During Refueling Outage 1RE08. Rept Contains Info Required by Section 6.b of Attachment 2 to GL 95-05 | |
NOC-AE-00586, Forwards Results of Control Rod Testing,In Response to NRC Bulletin 96-01, Control Rod Insertion Problems, Dtd 960308.Core Map Provided to Assist in Understanding Test Data | 21 July 1999 | Forwards Results of Control Rod Testing,In Response to NRC Bulletin 96-01, Control Rod Insertion Problems, Dtd 960308.Core Map Provided to Assist in Understanding Test Data | Shutdown Margin |
NOC-AE-000595, Forwards Chapters 1.0 & 16.0 to Operations QA Plan for South Texas Project.Rev Is Strictly Administrative & All Content Was Previously Submitted to NRC on 990503 & 990615 | 21 July 1999 | Forwards Chapters 1.0 & 16.0 to Operations QA Plan for South Texas Project.Rev Is Strictly Administrative & All Content Was Previously Submitted to NRC on 990503 & 990615 | |
NOC-AE-000518, Requests Exemption from Various Special Treatment Requirements of 10CFR50,as Described in Encls to Ltr.Stp Believes That Pilot Application Will Assist NRC in Development & Implementation of risk-informed 10CFR50 | 13 July 1999 | Requests Exemption from Various Special Treatment Requirements of 10CFR50,as Described in Encls to Ltr.Stp Believes That Pilot Application Will Assist NRC in Development & Implementation of risk-informed 10CFR50 | Safe Shutdown Earthquake Probabilistic Risk Assessment Incorporated by reference Large early release frequency Exemption Request Earthquake Maintenance Rule Program |
NOC-AE-000580, Forwards Response to NRC 990415 RAI Re Implementation of Commitments Related to GL 89-10, Safety-Related MOV Testing & Surveillance & GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs | 13 July 1999 | Forwards Response to NRC 990415 RAI Re Implementation of Commitments Related to GL 89-10, Safety-Related MOV Testing & Surveillance & GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs | High winds Probabilistic Risk Assessment Large early release frequency Maintenance Rule Program |
NOC-AE-000536, Submits Request for Exemption from Requirements of 10CFR50.34(b)(11),10CFR50,App A,Gdc 2 & 10CFR100,App a, Section VI(a)(3) Re Maint of Seismic Instrumentation.Revised Page to Procedure OERP01-ZV-IN01 Included | 13 July 1999 | Submits Request for Exemption from Requirements of 10CFR50.34(b)(11),10CFR50,App A,Gdc 2 & 10CFR100,App a, Section VI(a)(3) Re Maint of Seismic Instrumentation.Revised Page to Procedure OERP01-ZV-IN01 Included | Safe Shutdown Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Exemption Request Earthquake |
NOC-AE-000573, Requests Relief from Requirements of ASME Section XI Code Case N-498,exempting Isolated Class 1 Reactor Vessel Head Vent Atmospheric Vent Piping & Valve from Being Tested at Full RCS Pressure | 6 July 1999 | Requests Relief from Requirements of ASME Section XI Code Case N-498,exempting Isolated Class 1 Reactor Vessel Head Vent Atmospheric Vent Piping & Valve from Being Tested at Full RCS Pressure | Boric Acid Hydrostatic VT-2 |
NOC-AE-000498, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements Applicable to SG Main Steam Nozzle inside- Radius Sections.Attachment Includes Discussion of Basis & Justification for Request & Implementation Schedule | 6 July 1999 | Requests Relief from ASME Section XI Code Nondestructive Exam Requirements Applicable to SG Main Steam Nozzle inside- Radius Sections.Attachment Includes Discussion of Basis & Justification for Request & Implementation Schedule | Nondestructive Examination |
NOC-AE-000574, Forwards ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests Performed Between 971004 & Completion of Eighth RO on 990428 | 6 July 1999 | Forwards ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests Performed Between 971004 & Completion of Eighth RO on 990428 | VT-2 |
NOC-AE-000557, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of App III,III-3410 for Second ISI Interval.Proposed Alternatives for Ultrasonic Exam of Piping Sys Welds,Attached | 6 July 1999 | Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of App III,III-3410 for Second ISI Interval.Proposed Alternatives for Ultrasonic Exam of Piping Sys Welds,Attached | Nondestructive Examination |
NOC-AE-000541, Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Systems at Npps. Readiness Disclosure for STP, Encl | 29 June 1999 | Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Systems at Npps. Readiness Disclosure for STP, Encl | |
NOC-AE-000571, Forwards Final Operating Exam Matls for STP Exam Scheduled for 990705.Revised Operating Exam Outline & post-validation Change Summary Has Been Included.Without Encls | 24 June 1999 | Forwards Final Operating Exam Matls for STP Exam Scheduled for 990705.Revised Operating Exam Outline & post-validation Change Summary Has Been Included.Without Encls | |
NOC-AE-000512, Responds to NRC 981201 Telcon Re Jco 93-0004,per Revised MSLB Analysis | 23 June 1999 | Responds to NRC 981201 Telcon Re Jco 93-0004,per Revised MSLB Analysis | Safe Shutdown Earthquake Operating Basis Earthquake |
NOC-AE-000560, Forwards LER 99-S02-00,re Failure to Maintain Positive Control of Vital Area Security Key.Licensee Commitments Are Found in Corrective Action Section of LER | 23 June 1999 | Forwards LER 99-S02-00,re Failure to Maintain Positive Control of Vital Area Security Key.Licensee Commitments Are Found in Corrective Action Section of LER | |
05000498/LER-1999-005, Forwards LER 99-005-00,re Failure to Meet Requirements of TS Surveillance 3.7.1.2 Action B for Auxiliary FW Sys.Only Commitments Contained in Ltr Are Located in Corrective Action Section of LER | 17 June 1999 | Forwards LER 99-005-00,re Failure to Meet Requirements of TS Surveillance 3.7.1.2 Action B for Auxiliary FW Sys.Only Commitments Contained in Ltr Are Located in Corrective Action Section of LER | |
NOC-AE-000548, Forwards Response to RAI Re Proposed Amends on Replacement SG Water Level Trip Setpoint Differences for Stp,Units 1 & 2.Nothing Contained in Response Should Be Considered Commitment Unless So Specified in Separate Correspondence | 16 June 1999 | Forwards Response to RAI Re Proposed Amends on Replacement SG Water Level Trip Setpoint Differences for Stp,Units 1 & 2.Nothing Contained in Response Should Be Considered Commitment Unless So Specified in Separate Correspondence | Fuel cladding |
NOC-AE-000565, Forwards Amended Pages for Insertion Into South Texas Project Nuclear Operating Co Previously Submitted Response to NRC Rai.New Pages Include Expanded Answer to Question 4.b | 16 June 1999 | Forwards Amended Pages for Insertion Into South Texas Project Nuclear Operating Co Previously Submitted Response to NRC Rai.New Pages Include Expanded Answer to Question 4.b | |
NOC-AE-000561, Forwards Change QA-042 to Operations QAP, Rev 13, Reflecting Current Organizational Alignment for STP & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months | 15 June 1999 | Forwards Change QA-042 to Operations QAP, Rev 13, Reflecting Current Organizational Alignment for STP & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months | |
NOC-AE-0559, Forwards STP Commitment Change Summary Rept for Period 981209-990610.Rept Lists Each Commitment for Which Change Was Made During Reporting Period & Provides Basis for Each Change | 15 June 1999 | Forwards STP Commitment Change Summary Rept for Period 981209-990610.Rept Lists Each Commitment for Which Change Was Made During Reporting Period & Provides Basis for Each Change | |
NOC-AE-000500, Forwards Relief Request RR-ENG-2-4,proposing to Perform Alternative Ultrasonic Examination from Outside & End Surfaces of Reactor Vessel Closure Head Nuts,As Described in Encl in Lieu of Surface Examination of Threaded Region | 9 June 1999 | Forwards Relief Request RR-ENG-2-4,proposing to Perform Alternative Ultrasonic Examination from Outside & End Surfaces of Reactor Vessel Closure Head Nuts,As Described in Encl in Lieu of Surface Examination of Threaded Region | Nondestructive Examination |
NOC-AE-000502, Forwards Relief Request RR-ENG-2-6,proposing That Boroscopic VT-1 Visual Examination Be Allowed as Alternative to Section XI Surface Examination of Pump Casing Welds,Or Portions of Welds within Pits | 9 June 1999 | Forwards Relief Request RR-ENG-2-6,proposing That Boroscopic VT-1 Visual Examination Be Allowed as Alternative to Section XI Surface Examination of Pump Casing Welds,Or Portions of Welds within Pits | Nondestructive Examination |
NOC-AE-000499, Forwards Relief Request RR-ENG-2-3,proposing to Perform Alternative Ultrasonic Examination from Outside Surface of Skirt Attachment Weld as Described in Encl,In Lieu of Surface Examination from Inside Pressurizer Skirt | 9 June 1999 | Forwards Relief Request RR-ENG-2-3,proposing to Perform Alternative Ultrasonic Examination from Outside Surface of Skirt Attachment Weld as Described in Encl,In Lieu of Surface Examination from Inside Pressurizer Skirt | |
NOC-AE-000545, Forwards Response to NRC 990416 RAI Re Util Proposed Amend on Operator Action for Small Break Loca, .Draft EOP Re Small Break Loca,Encl to Aid Discussion of Proposed Amend | 31 May 1999 | Forwards Response to NRC 990416 RAI Re Util Proposed Amend on Operator Action for Small Break Loca, .Draft EOP Re Small Break Loca,Encl to Aid Discussion of Proposed Amend | Shutdown Margin |