Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20027B378 | 9 September 1982 | Forwards Proprietary Version of Draft NEDE-22203, Reactor Internals Vibration Predictions & Vendor Ltr Describing Instrument & Vibration Monitoring & Testing & Visual Insp Procedures.Draft Rept Withheld (Ref 10CFR2.790) | |
ML20039C116 | 28 December 1981 | Defines Activities & Schedule for Action Plan to Resolve Severe Accident Licensing Issues for BWR/6 Mark III Gessar. Series of BWR Technology Update Meetings W/Nrc Proposed. Supporting Info Encl | Probabilistic Risk Assessment |
ML20038A665 | 9 November 1981 | Forwards Final Responses to NRC 810919 Positions on App 38 of GESSAR-11.Responses Will Serve as Basis for 811120 Meeting.Formal Submittal on Gessar Is Currently Planned for 811130.Copies Sent to a Sonin & G Maise Per Request | |
ML20010G644 | 18 September 1981 | Forwards Responses to NRC Questions Re Safety Relief Valve Pool Dynamic Loads for Use in Gessar II Amend | |
ML17333A046 | 11 February 1981 | Responds to IE Bulletin 80-23, Failure of Solenoid Valves Mfg by Valcor Engineering Corp. No Such Valves Used in safety-related Sys | |
ML19309F061 | 21 April 1980 | Forwards Excerpts,Submitted to NRC on 800331,which Define low-low Set Relief Function of Nuclear Boiler Sys in Bwr. Info Is Provided to Facilitate NRC Review & Is Unchanged from Matl Presented at 800228 Meeting W/Nrc | Stroke time |
ML19344D264 | 3 March 1980 | Forwards Addl Info for NRC Review of GE Responses to Preliminary Design Approval Extension Items.Info Supplements Amends 46 & 47 of Nuclear Island Gessar Re NSSS & Addresses Regulatory Guidance Issued Between 781013 & 800303 | Earthquake |
ML19263D282 | 13 March 1979 | in Response to NRC 790117 Ltr,Ge Has Decided That NEDO-24048 Should Be Reviewed Under Third Category,In Which Costs Incurred Are Assessed to Final Design Approval Application.W/Table Re Review of Documents Sent to NRC | |
ML20147H284 | 12 December 1978 | Forwards Licensing Topical Rept NEDO-24083 Recirculation Pump Shaft Seal Leakage Analysis | |
ML20150E085 | 4 December 1978 | Forwards ADS Solenoid Valve Reliability Demonstration, Availability Engr Rept 50 | |
ML17317B544 | 11 October 1978 | Forwards Info Re Qualification Pressure for safety-related Equipment in Drywell.Drywell Pressure of 0.7 Psia Calculated & Will Be Used to Qualify All safety-related Equipment in Drywell Required During & After LOCA | |
ML20148B335 | 29 September 1978 | Forwards NEDE-24048, Evaluation of Acoustic Pressure Loads on BWR/6 Internal Components as Addl Info for 251 NSSS & 238 NSSS Gessar Ser.Waiver of Review Fee Requested | |
ML20027B402 | 24 April 1978 | Forwards GE Program for Reactor Internals Vibration Measurement & Insp of BWR/6 Class Plants In,Response to NRC Request for Info in Item 2 of Table 1-3 of 251 & 238 NSSS Gessar Sers.Affidavit Encl |