Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20252A191 | 4 September 2020 | Response to Request for Additional Information Regarding License Amendment Request for a One-Time Deferral of the Millstone Unit 3 Steam Generator Inspections | |
ML20203M160 | 20 July 2020 | VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status | Anchor Darling |
ML20084L272 | 29 April 2020 | EA-17-077 Confirmation of Completion of Actions Taken by Dominion Energy, Inc., as Set Forth in NRC Confirmatory Order Dated November 21, 2017, Dated April 29, 2020 | |
ML16130A564 | 2 May 2016 | NRC Regulatory Issue Summary 2015-16 Planned Licensing Action Submittals | Open Phase Condition Fuel cladding |
ML16056A139 | 11 March 2016 | Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports | |
ML14227A942 | 15 August 2014 | David Lochbaum Incoming Correspondence Aug 15 2014 Millstone | |
ML13259A043 | 12 September 2013 | Response to March 12, 2012 Information Request Regarding Seismic Aspects of Recommendation 2.1 - 1.5 Year Response for CEUS Sites | Safe Shutdown Earthquake Fukushima Dai-Ichi |
ML080650561 | 29 February 2008 | Submittal of Supplemental Information of Corrective Actions, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors | Safe Shutdown Boric Acid Loop seal Mission time Fire Barrier Safe Shutdown Earthquake Coatings Design basis earthquake Foreign Material Exclusion Fuel cladding Scaffolding |
ML081490088 | 31 January 2008 | Enclosure 4 - LTR-CDME-08-11 NP-Attachment, Interim Alternative Repair Criterion for Cracks in the Lower Region of the Tubesheet Expansion Zone | Finite Element Analysis |
ML072820307 | 11 October 2007 | Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists | |
ML060950094 | 3 April 2006 | North Anna Units 1 and 2, and Surry Units 1 and 2, Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power | Safe Shutdown High winds Probabilistic Risk Assessment Reserve Station Service Transformer Contingency analyzer Earthquake Maintenance Rule Program |
ML052990293 | 19 October 2005 | FAQ Log 10/19/2005 | Ultimate heat sink Mission time Post Accident Monitoring Coatings Large early release frequency Exemption Request |
ML051460162 | 18 April 2005 | Sequence of Events from Crew Debrief, Unit 3 Reactor Trip on 04/17/2005 | Shutdown Margin Power change |
ML051460161 | 18 April 2005 | Ert Issues List for April 17, 2005 Rx, Trip and Safety Injection | Packing leak |
ML050180257 | 13 January 2005 | Stations Units 1 & 2, Millstone Power Station Units 2 & 3, Request for Approval of Appendix B of Topical Report DOM-NAF-2, Qualification of Westinghouse WRB-1 CHF Correlation in the Dominion VIPRE-D Computer Code. | |
ML042470019 | 24 August 2004 | Attachment 4 - Table of Where ANSI N18.7 Requirements Are Addressed by NQA-1-1994 Standards And/Or the New QA Topical Report | Shutdown Margin Coatings Nondestructive Examination Temporary Modification |
ML041910499 | 15 April 2004 | Census 2000 Redistricting Data (Public Law 94-171) Summary File: Rhode Island. Accessed from U.S. Census Bureau Website 4/15/2004 | |
ML041910431 | 25 January 2002 | Ranking Tables for Metropolitan Areas: Population in 2000 and Population Change from 1990 to 2000 (PHC-T-3) from U.S. Census Bureau Website, Accessed: 6/12/2002 | |
ML18346A246 | 8 August 1978 | Furnishing Information Re Combustion Engineering Owners' Group Proposed Plan to Resolve the Asymmetric LOCA Loads Issue |