Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-20-0263, Duke Energy Corp. - Request to Use Provision of Later Edition and Addenda of ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)(iv)16 September 2020Duke Energy Corp. - Request to Use Provision of Later Edition and Addenda of ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)(iv)
ML16056A13911 March 2016Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports
BSEP 13-0071, Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Supplement to Walkdown Report31 July 2013Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Supplement to Walkdown ReportUnanalyzed Condition
Fukushima Dai-Ichi
Seismic Walkdown Report
RA-13-012, Capability to Perform Multi-Unit Dose Assessment26 June 2013Capability to Perform Multi-Unit Dose Assessment
ML12185A02425 July 2012Incidental Take Limit Met for Green Turtles at Brunswick Steam Electric Plant, Units 1 and 2License Renewal
ML12145001423 May 2012NFPA 805 LAR Status Matrix - May 2012
ML10203028813 July 2010Photograph - Brunswick Graphics and Sample Results
ML1019305501 January 201010CFR50.75g File: Spreadsheet Groundwater.Xls BSEP Well Samples
ML10194049916 April 2008Email from Turkal, Mark to Heather Gepford; Subject: FW: Monthly Brunswick Tritium Conference Call; Attachments: Sampling Locations Data Updated 4-15-08.pdf; Updated 4-15-08 Well Pictures with Data and Graphs.Pdf
ML10195051713 March 2008Email from Grzeck, Lee to Heather Gepford: Attachments Sampling Locations Data Updated 3-11-08.pdf; Updated 3-11-08 Well Pictures with Data and Graps.Pdf
ML10195057511 January 2008Email from Randy Musser to Heather Gepford; Subject: Fwd: Sampling Locations Data Updated 1-8-08.ppt; Attachments: Sampling Locations Data Updated 1-8-08.ppt
ML10195057411 January 2008Email from Randy Musser to Heather Gepford; Subject: Fwd: Emailing: Updated 01_8_08 Well Pictures with Data and Graphs. Pdf
ML07297004531 January 2007July-August Exam 50-325, 324/2007301 Final Simulator Scenarios (Scenario 1 of 4) (Section 5 of 5)Shutdown Margin
ML07297004231 January 2007July-August Exam 50-325, 324/2007301 Final Simulator Scenarios (Scenario 1 of 4) (Section 4 of 5)Reactor Vessel Water Level
Failure to Scram
Manual Operator Action
ML05123009014 March 2005Off-Site Dose Calculation Manual (ODCM) Revision 28Time of Discovery
Grab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Process Control Program
Power change