Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RA-20-0263, Duke Energy Corp. - Request to Use Provision of Later Edition and Addenda of ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)(iv) | 16 September 2020 | Duke Energy Corp. - Request to Use Provision of Later Edition and Addenda of ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)(iv) | |
ML16056A139 | 11 March 2016 | Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports | |
BSEP 13-0071, Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Supplement to Walkdown Report | 31 July 2013 | Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Supplement to Walkdown Report | Unanalyzed Condition Fukushima Dai-Ichi Seismic Walkdown Report |
RA-13-012, Capability to Perform Multi-Unit Dose Assessment | 26 June 2013 | Capability to Perform Multi-Unit Dose Assessment | |
ML12185A024 | 25 July 2012 | Incidental Take Limit Met for Green Turtles at Brunswick Steam Electric Plant, Units 1 and 2 | License Renewal |
ML121450014 | 23 May 2012 | NFPA 805 LAR Status Matrix - May 2012 | |
ML102030288 | 13 July 2010 | Photograph - Brunswick Graphics and Sample Results | |
ML101930550 | 1 January 2010 | 10CFR50.75g File: Spreadsheet Groundwater.Xls BSEP Well Samples | |
ML101940499 | 16 April 2008 | Email from Turkal, Mark to Heather Gepford; Subject: FW: Monthly Brunswick Tritium Conference Call; Attachments: Sampling Locations Data Updated 4-15-08.pdf; Updated 4-15-08 Well Pictures with Data and Graphs.Pdf | |
ML101950517 | 13 March 2008 | Email from Grzeck, Lee to Heather Gepford: Attachments Sampling Locations Data Updated 3-11-08.pdf; Updated 3-11-08 Well Pictures with Data and Graps.Pdf | |
ML101950575 | 11 January 2008 | Email from Randy Musser to Heather Gepford; Subject: Fwd: Sampling Locations Data Updated 1-8-08.ppt; Attachments: Sampling Locations Data Updated 1-8-08.ppt | |
ML101950574 | 11 January 2008 | Email from Randy Musser to Heather Gepford; Subject: Fwd: Emailing: Updated 01_8_08 Well Pictures with Data and Graphs. Pdf | |
ML072970045 | 31 January 2007 | July-August Exam 50-325, 324/2007301 Final Simulator Scenarios (Scenario 1 of 4) (Section 5 of 5) | Shutdown Margin |
ML072970042 | 31 January 2007 | July-August Exam 50-325, 324/2007301 Final Simulator Scenarios (Scenario 1 of 4) (Section 4 of 5) | Reactor Vessel Water Level Failure to Scram Manual Operator Action |
ML051230090 | 14 March 2005 | Off-Site Dose Calculation Manual (ODCM) Revision 28 | Time of Discovery Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Power change |