Category:E-Mail
MONTHYEARML23248A2612023-09-0505 September 2023 NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of License Amendment Request to Revise the 10 CFR 50.69 Categorization Process ML23202A0652023-07-19019 July 2023 NRR E-mail Capture - Request for Additional Information - Brunswick Steam Electric Plant, Units 1 and 2, Torus Liner Inspection Alternative Request (L-2022-LLR-0089) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23032A2472023-01-26026 January 2023 Document Request Letter for Brunswick Upcoming RP Inspection 2023002 ML23018A1892023-01-17017 January 2023 Document Request for RP Inspection at Brunswick Inspection Report 2023-01 ML23006A0642023-01-0606 January 2023 NRR E-mail Capture - Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308 ML23006A1892023-01-0606 January 2023 NRR E-mail Capture - Corrected - Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308 NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22038A1572022-02-0707 February 2022 NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21357A0472021-12-23023 December 2021 NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of License Amendment Request Regarding Adoption of TSTF-580 ML21361A0122021-12-23023 December 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21277A0952021-10-0101 October 2021 NRR E-mail Capture - Request for Additional Information - Brunswick Exemption Request from 10CFR 55.47 License Operator Exam Two-year Waiver Limit ML21200A1582021-07-16016 July 2021 NRR E-mail Capture - Accepted for Review - Brunswick License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery ML21168A0042021-06-17017 June 2021 Notification of Inspection and Request for Information ML21137A1622021-04-26026 April 2021 NRR E-mail Capture - Accepted for Review - Brunswick License Amendment Request to Adopt TSTF-505 Risk-Informed Completion Time (L-2021-LLA-0060) ML21082A0162021-03-22022 March 2021 Accepted for Review - Brunswick License Amendment Request to Change Tech Spec Limit for Standby Liquid Control System Boron Solution Storage Tank Volume L-2021-LLA-0022 ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21019A3772021-01-13013 January 2021 002 Radiation Safety Baseline Inspection Information Request ML21007A3722021-01-0707 January 2021 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-19-0352 - Proposed Alternative for Reactor Vessel Close Stud Examinations (L-2020-LLR-0156) ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20309A5212020-10-29029 October 2020 Request for Additional Information - Brunswick License Amendment Request to Modify Its Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of SSC Categorization Process ML20294A0642020-10-20020 October 2020 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Adopt TSTF-582 RPV Water Inventory Control Enhancements(L-2020-LLA-0218) ML20297A3102020-10-13013 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0191 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 (L-2020-LLR-0126) ML20297A3082020-10-0707 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0263 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI for Repair/Replacement (L-2020-LLR-0124) ML20297A3092020-10-0606 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-4540(b) (L-2020-LLR-0125) ML20275A2972020-10-0101 October 2020 NRR E-mail Capture - Request for Additional Information - Brunswick Request for Alternate Examination of Reactor Vessel Nozzles ML21033A8562020-08-0505 August 2020 NRR E-mail Capture - Accepted for Review - Brunswick Relief Request for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements EPID-L-2020-LLR-0091 ML20121A1262020-04-29029 April 2020 Radiation Safety Baseline Inspection Information Request ML20111A1212020-04-20020 April 2020 NRR E-mail Capture - Accepted for Review - Brunswick Request for Alternative to Examination Category B-N-1 (VT-3) Visual Examination of Accessible Areas of the Reactor Vessel Interior - EPID: L-2020-LLR-0048 ML20017A1602020-01-17017 January 2020 E-mail Notification of Inspection and Request for Additional Information ML19283D0852019-10-0909 October 2019 Request for Additional Information - Brunswick Atrium 11 LAR ML19252A4572019-09-0808 September 2019 (FEMA Email 09-08-19) Tentative Notification of Brunswick Preliminary Capability Assessment Results ML19252A4092019-09-0606 September 2019 (E-mail to FEMA 09-06-19) FEMA Notification for Planned Restart of Brunswick Units 1 and 2 ML19219A2132019-08-0707 August 2019 NRR E-mail Capture - Duke Energy Fleet - Acceptance of Requested Licensing Action Amendment Requests to Relocate the TSs Staff Qualification Requirements to the Duke Energy Corporation QAPD ML19179A1312019-06-27027 June 2019 NRR E-mail Capture - Brunswick RAIs - LAR to Revise TS 5.5.12, Primary Containment Leakage Rate Testing Program for Permanent Extension of Maximum Appendix J Test Intervals (L 2019-LLA-0031) ML19177A0122019-06-25025 June 2019 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise TS 5.5.12, Primary Containment Leakage Rate Testing Program for Permanent Extension of Maximum Appendix J Test Intervals (L 2019-LLA-0031) ML19162A3902019-06-11011 June 2019 NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Fourth 10-Year Inservice Inspection Interval ISI-12 ML19162A3912019-06-11011 June 2019 NRR E-mail Capture - Duke Energy Fleet - Acceptance of Requested Licensing Action Relief Request (19-GO-001) Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination in Lieu of Radiography ML19092A1152019-04-0101 April 2019 NRR E-mail Capture - Brunswick Steam Electric Plant, Unit Nos. 1 and 2 - Acceptance of Requested Licensing Action Amendment Request to Modify Surveillance Requirements for Safety Relief Valves (L-2019-LLA-0043) ML19092A1142019-04-0101 April 2019 NRR E-mail Capture - Brunswick Plant, Unit 1 and 2 - Acceptance of Requested Licensing Action Amendment Request to Modify TS 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (L-2019-LLA-0031) ML19067A2712019-03-0707 March 2019 NRR E-mail Capture - Brunswick 3rd Round RAI - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML19065A0962019-03-0606 March 2019 NRR E-mail Capture - Brunswick RAIs - LAR to Revise Allowable Value for TS 3.3.8.1 Time Delay on Loss of Voltage ML19058A0742019-02-26026 February 2019 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise Allowable Value for TS 3.3.8.1 Time Delay on Loss of Voltage ML19056A2212019-02-25025 February 2019 NRR E-mail Capture - Brunswick Draft 3rd Round RAI - LAR to Allow Implementation of the Provisions 10 CFR 50.69 2023-09-05
[Table view] Category:Graphics incl Charts and Tables
MONTHYEARRA-20-0263, Duke Energy Corp. - Request to Use Provision of Later Edition and Addenda of ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-09-16016 September 2020 Duke Energy Corp. - Request to Use Provision of Later Edition and Addenda of ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)(iv) ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports BSEP 13-0071, Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Supplement to Walkdown Report2013-07-31031 July 2013 Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Supplement to Walkdown Report RA-13-012, Capability to Perform Multi-Unit Dose Assessment2013-06-26026 June 2013 Capability to Perform Multi-Unit Dose Assessment ML12185A0242012-07-25025 July 2012 Incidental Take Limit Met for Green Turtles at Brunswick Steam Electric Plant, Units 1 and 2 ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML1020302882010-07-13013 July 2010 Photograph - Brunswick Graphics and Sample Results ML1019305502010-01-0101 January 2010 10CFR50.75g File: Spreadsheet Groundwater.Xls BSEP Well Samples ML1019404992008-04-16016 April 2008 Email from Turkal, Mark to Heather Gepford; Subject: FW: Monthly Brunswick Tritium Conference Call; Attachments: Sampling Locations Data Updated 4-15-08.pdf; Updated 4-15-08 Well Pictures with Data and Graphs.Pdf ML1019505172008-03-13013 March 2008 Email from Grzeck, Lee to Heather Gepford: Attachments Sampling Locations Data Updated 3-11-08.pdf; Updated 3-11-08 Well Pictures with Data and Graps.Pdf ML1019505752008-01-11011 January 2008 Email from Randy Musser to Heather Gepford; Subject: Fwd: Sampling Locations Data Updated 1-8-08.ppt; Attachments: Sampling Locations Data Updated 1-8-08.ppt ML1019505742008-01-11011 January 2008 Email from Randy Musser to Heather Gepford; Subject: Fwd: Emailing: Updated 01_8_08 Well Pictures with Data and Graphs. Pdf ML0729700452007-01-31031 January 2007 July-August Exam 50-325, 324/2007301 Final Simulator Scenarios (Scenario 1 of 4) (Section 5 of 5) ML0729700422007-01-31031 January 2007 July-August Exam 50-325, 324/2007301 Final Simulator Scenarios (Scenario 1 of 4) (Section 4 of 5) ML0512300902005-03-14014 March 2005 Off-Site Dose Calculation Manual (ODCM) Revision 28 2020-09-16
[Table view] Category:Map
MONTHYEARML18250A0122016-08-11011 August 2016 Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Figures ML1019304122010-06-0909 June 2010 Map - Brunswick Protected Area Groundwater Monitoring Well Locations, Figure 4 ML1019404502008-08-21021 August 2008 Extraction Well Location ML1019404992008-04-16016 April 2008 Email from Turkal, Mark to Heather Gepford; Subject: FW: Monthly Brunswick Tritium Conference Call; Attachments: Sampling Locations Data Updated 4-15-08.pdf; Updated 4-15-08 Well Pictures with Data and Graphs.Pdf ML1019505172008-03-13013 March 2008 Email from Grzeck, Lee to Heather Gepford: Attachments Sampling Locations Data Updated 3-11-08.pdf; Updated 3-11-08 Well Pictures with Data and Graps.Pdf ML1019505752008-01-11011 January 2008 Email from Randy Musser to Heather Gepford; Subject: Fwd: Sampling Locations Data Updated 1-8-08.ppt; Attachments: Sampling Locations Data Updated 1-8-08.ppt ML1019505742008-01-11011 January 2008 Email from Randy Musser to Heather Gepford; Subject: Fwd: Emailing: Updated 01_8_08 Well Pictures with Data and Graphs. Pdf ML0512204172005-02-0404 February 2005 Site Audit Follow-Up Item #10 2016-08-11
[Table view] Category:Photograph
MONTHYEARML14057A8062014-02-14014 February 2014 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0111, Rev. 0, Starting Air Pressure Regulator, Nordberg P/N 1776 506 BSEP 12-0110, Sea Turtle Stranding Report2012-09-26026 September 2012 Sea Turtle Stranding Report ML1020302882010-07-13013 July 2010 Photograph - Brunswick Graphics and Sample Results ML1019304132010-06-0909 June 2010 Photograph - Progress Energy, Storm Drain Stabilization Pond Wells ML1019304112010-06-0909 June 2010 Photograph - Brunswick OCA Wells, Area 1 Wells Near Caswell Beach ML1019404992008-04-16016 April 2008 Email from Turkal, Mark to Heather Gepford; Subject: FW: Monthly Brunswick Tritium Conference Call; Attachments: Sampling Locations Data Updated 4-15-08.pdf; Updated 4-15-08 Well Pictures with Data and Graphs.Pdf ML1019505172008-03-13013 March 2008 Email from Grzeck, Lee to Heather Gepford: Attachments Sampling Locations Data Updated 3-11-08.pdf; Updated 3-11-08 Well Pictures with Data and Graps.Pdf ML1019505752008-01-11011 January 2008 Email from Randy Musser to Heather Gepford; Subject: Fwd: Sampling Locations Data Updated 1-8-08.ppt; Attachments: Sampling Locations Data Updated 1-8-08.ppt ML1019505742008-01-11011 January 2008 Email from Randy Musser to Heather Gepford; Subject: Fwd: Emailing: Updated 01_8_08 Well Pictures with Data and Graphs. Pdf ML0735205392007-10-28028 October 2007 LTR-07-0819 - Ltr. Tom Gurdziel, Concerns New Generation of Nuclear Plants 2014-02-14
[Table view] |
Text
Gelpford, Heather From: Randy Musser ,;-
Sent: Friday, January 11, 2008 10:22 AM To: Heather Gepford
Subject:
Fwd: Emailing: Updated 01 8 08 Well pictures with data and graphs.pdf Attachments: Updated 01 8_08 Well pictures with data and graphs.pdf
>>> "Millinor, Mike" <mike.millinor pqnmail.com> 1/9/2008 4:07:38 PM >>>
Here are the updated well data results and trends Mike Mike Millinor Environmental and Chemistry Brunswick Nuclear Plant (910)-457-2667/Voicenet - 850-2667 Fax: 910-457-2273 Mike.Millinor(t.pxqnmail.com The message is ready to be sent with the following file or link attachments:
Updated 01_8_08 Well pictures with data and graphs.pdf Note: To protect against computer viruses, e-mail programs may prevent sending or receiving certain types of file attachments. Check your e-mail security settings to determine how attachments are handled.
<<Updated 01_8_08 Well pictures with data and graphs.pdf>>
1
j Progress Energy Shallow Wells 17C, 20C, 24C, and 31C Near Pond 45,000 40,000 '--- ----
35,000 30,000 25,000 . . -.
CL 20,000 15,000 10,000 Approxim~ate.Low~er Lim~itof .Detetin, 300 pCi/L 5,000 0-4/28/07 6/17/07 8/6/07 9/25/07 11/14/07 1/3/08
--.- ESS-17C - ESS-20C - ESS-24C -C
Shallow Wells 18C, 19C, and 22C Near Pond 800,000 -
700,00 500,00 c3400,00 0.
500,000nat Loe iiioeeton 0 ~
300,00 200,00 100,000 0 -
4/28/07 -6/17/07 8/6/07 9/25/07 11/14/07 1/3/08
-- ESS-18C -- ESS-19C -*--ESS-220 SProgress Energy
Shallow Wells 23C, 26C, and 27C Near Pond 800,000 .
700,000 ,
600,000 500,000
-j 53 400,0o 300,000 30000 200,00 100,000 Aproximate Lower Limit of Detection, 30OpCi/L 0-4 06/07/07 07/07/07 08/06/07 09/05/07 10/05/07 11/04/07 12/04/07 01/03/08 ESS-23C -ESS-26C -*-ESS-27C jProgress Energy
Shallow Wells 21C, 25C, and 28C Near Pond 3,000 2,400 1,800
-j C-)
1,200 600 0 I I 5/8/07 6/7/07 7/7/07 8/6/07 9/5/07 10/5/07 11/4/07 12/4/07 1/3/08 I-.- ESS-21C -m- ESS-25C e-.- ESS-28C ý
I Note: Values less than the lower limit of detection are non-detectable
- e. Progress Energy
Shallow Well 30C Near Pond 50 ,00 0 - ,i .,,....... .
45,000 35,000 ..**,,'"'/N ; * * :":*:
30,000 Co 25,000-20,000 15,000 10,000 5,000 8/31/07 9/30/07 10/30/07 11/29/07 12/29/07 SProgress Energy
Latest Shallow Well Data Well Well Depth (ft) SampleDate Sample Results (pCi/L)
ESS-17C 26- 12/10/07 4,234 ESS-18C 20 12/10/07 680,800 ESS-19C 20 12/11/07 535,200 ESS-20C 20.5 12/11/07 17,060 ESS-21C 20 12/10/07 378 ESS-22C 20 12/10/07 787,800 ESS-23C 23 12/11/07 196,400 ESS-24C 18 12/10/07 3,111 ESS-25C 22 12/13/07 <LLD ESS-26C 15 12/10/07 666,200 ESS-27C 15.5 12/11/07 234,800 ESS-28C 23 12/11/07 <LLD ESS-30C 15 12/10/07 48,210 ESS-31C 15 12/10/07 3,129 Progress Energy
/
-4 4
Marsh Wells at Gum Log Branch and .Nancy's Creek 500 450 400
-J 0.
350 300 250 200 6/1 7/07 8/6/07 9/:25/07 11/14/07 1/3/08
-*-ESS-GLB-1 -- ESS-NC-1
-- ESS-NC-4 -0 ESS-NC-5 jProgress Energy
Latest Marsh Well Data Well Well Depth (ft) Sample Date Tritium Sample Results (p*i/L)
ESS-NC- 1 7.5 12/12/07 <LLD ESS-NC-2 8 12/12/07 <LLD ESS-NC-3 8 12/12/07 <LLD ESS-NC-4 8 12/12/07 <LLD ESS-NC-5 8 12/12/07 <LLD ESS-GLB-1 8 12/12/07 <LLD Cý Progress Energy
Progress Energy Intermediate Wells 17B, 18B, and 20B Near Pond 1000 900
-800 700 600
-J 500 400 300 200 100 0 I 03/09/07 04/28/07 06/17/07 08/06/07 09/25/07 11/14/07 01/03/08
- ESS-17B --a- ESS-18B & ESS-20B r---------------------------------I Note: Values less than the lower limit of detection are non-detectable
Intermediate Wells 21B, 22B, 24B, and 25B Near Pond 1000 900 800 700 600
-J 500 400 300 200 100 0
03/09/07 04/28/07 06/17/07 08/06/07 09/25/07 11/14/07 01/03/08
--m- ESS-21 B --m- ESS-22B - ESS-24B -i-- ESS-25B Note: Values less than the lower limit of detection are non-detectable
I Progress Energy
Intermediate Well 19B Near Pond 8000 . _ _ _ _ __
7500 -
7000 6500 6000-5500 5000------
4 500 .
4000 3500 -
3000 -
2500J 2000 1500promate Lower Limit of Detection., 3 1500 5000-,1::
- =:'
05/08/07 06/07/07 07/07/07 08/06/07 09/05/07 10/05/07 11/04/07 12/04/07 01/03/08
-L-- ESS-19B g3 Progress Energy
Latest Intermediate Well Sample Data Well Well Depth (ft) Sample Date Sample Results (pCi/L)
ESS-17B 53 12/10/07 <LLD ESS- 18B 63 12/10/07 <LLD ESS-19B 42 12/11/07 7,195 ESS-20B 43 12/11/07 <LLD ESS-21B 67 12/10/07 <LLD ESS-22B 76 12/10/07 <LLD ESS-24B 53 12/10/07 <LLD ESS-25B 43 12/13/07 <LLD Progress Energy
SProgress Energy Deep Wells 17A, 24A, and 27A Near Pond 500 450 400 350 300 CL 250 200 150 100 50 0
4/28/07 6/17/07 8/6/07 9/25/07 11/14/07 1/3/08
-o- ESS-17A --- ESS-24A --- ESS-27A k Progress Energy
Latest Deep Well Sample Data Well Well'Depth (ft) Sample Date .. 'TritiumSampleResults (pCi/L)
ESS-17A 150 12/10/07 <LLD ESS-24A 140 12/10/07 <LLD ESS-27A 140 12/10/07 <LLD 6j Progress Energy
- j Progress Energy Wells 3B, 3C, 13B, and 13C 1,600 300 1, 00 * "*::
300 t*..... ..
,pr~nt */ Loe ii fDtcin 0 3/9/07 4/28/07 6/17/07 8/6/07 9/25/07 11/14/07 1/3/08
-.- ESS-13C -u--ESS-3C - ESS-3B -n ESS-13B SProgress Energy
Miscellaneous Wells-1 Well,' Well Depth (f), Sample Date Tritium Samle Results (pCi/L)
ESS-3B 52.4 12/11/07 1,217 ESS-3C 14.3 12/11/07 312 ESS-13B 56.5 12/14/07 <LLD ESS-13C 24.8 12/14/07 <LLD
~JProgress Energy
Progress Energy Switchyard Area Wells from Historical Radwaste Line Leak, Well 2C 2,000,000 1,900,000 CL 1,800,000 1,700,000 1,600,000 3/9/07 4/28/07 6/17/07 8/6/07 9/25/07 11/14/07 1/3/08
-.- ESS-2C Progress Energy
Switchyard Area Wells from Historical Radwaste Line Leak, Well 16 60,000 .... __
50,000 40,000 o 30,000 20 10,000 0 -
3/9/07 4/28/07 6/17/07 8/6/07 9/25/07 11/14/07 1/3/08
-U- ESS-1 6C SProgress Energy
Miscellaneous WelIs-2 Well Well Depth (ft) SampleDate. Tritium Sample Results (pCi/L)
ESS-2C 23 12/13/07 1,840,000 ESS- 16 25.4 12/13/07 54,030 Q Progress Energy