Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML21278A283 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.18, Fuel Handling Incident | |
ML21278A260 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 13, Section 13.4, Post-Refueling Startup Event | Anticipated operational occurrence |
ML21278A269 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.9, Loss-of-Coolant Flow Event | Coast down |
ML21278A304 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 16, Table 16.1, Aging Management Programs (Amp), Indexed by LRA Section and System | Boric Acid Fire Barrier Coatings Aging Management |
ML22115A043 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 02, Section 2.2, Population and Land Use_Redacted | |
ML22115A046 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 9, Figures 9.1 Through 9.30_Redacted | |
ML21278A302 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.5, References | Boric Acid Coatings License Renewal |
ML21278A293 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.22, Waste Gas Incident | |
ML21278A296 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.4, 10 CFR 54.67(B) Update | Aging Management |
ML21278A303 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.3, Evaluation of Time-Limited Aging Analyses | |
ML22115A047 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10A Figure 10A.1-1, Main Steam System: Redacted | |
ML21278A285 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.21, Deleted | |
ML21278A287 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.15, Steam Generator Tube Rupture Event | |
ML21278A291 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.26, Feedline Break Event | Coast down |
ML21278A255 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.1, Organization and Methodology | Boric Acid Shutdown Margin Anticipated operational occurrence Fuel cladding Overspeed trip |
ML21278A276 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations, Table of Contents | |
ML21278A280 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 15, Table of Contents | |
ML21278A284 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.16, Seized Rotor Event | |
ML21278A292 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.23, Waste Processing System Incident | |
ML21278A271 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.7, Excess Feedwater Heat Removal Event | |
ML21278A274 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.12, Asymmetric Steam Generator Event | |
ML21278A267 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.10, Loss-Of-Non-Emergency AC Power | Safe Shutdown Coast down |
ML21278A262 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 12, Figures, Deleted | |
ML21278A264 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.6, Loss of Feedwater Flow Event | |
ML21278A268 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.8, Reactor Coolant System Depressurization | |
ML21278A275 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.2, Control Element Assembly Withdrawal Event | Shutdown Margin |
ML21278A261 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.14, Steam Line Break Event | Boric Acid Power change Coast down |
ML21278A277 | 7 September 2021 | 2 to Final Safety Analysis Report, Chapter 14, Safety Analysis, Table of Contents | Anticipated operational occurrence Overspeed trip |
ML21278A253 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.5, Loss of Load Event | Stroke time |
ML21278A252 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 11, Section 11.3, Radiation Safety | |
ML22115A048 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 11, Figures: Redacted | |
ML21278A289 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.24, Maximum Hypothetical Accident | |
ML21278A257 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operation, Table of Contents | |
ML21278A266 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 13, Section 13.0, Initial Tests and Operation | |
ML21278A299 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.1, Introduction | Aging Management License Renewal |
ML22115A042 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 1, Figures: Redacted | |
ML21278A282 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14 Section 14.25, Excessive Charging Event | |
ML21278A286 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Figures 14.2.1 Through 14.26-10 | |
ML21278A270 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 12, Section 12.5, Review and Audit of Operations | |
ML21278A254 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.11, Control Element Assembly Drop Event | |
ML21278A256 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 12, Section 12.6, Emergency Planning | |
ML21278A272 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.13, Control Element Assembly Ejection | |
ML22115A044 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 2, Section 2.10, Other Design Considerations: Redacted | |
ML21278A294 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.19, Turbine-Generator Overspeed Incident | Overspeed trip |
ML21278A298 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.2, Aging Management Programs and Activities | Safe Shutdown Boric Acid Non-Destructive Examination Fire Barrier Coatings Aging Management License Renewal Control of Heavy Loads EVT-1 |
ML22115A045 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 5, Section 5.6, Other Structures - Redacted | Tornado Missile Safe Shutdown Earthquake Tornado Generated Missile Design basis earthquake Earthquake |
ML21278A288 | 7 September 2021 | 2 to Updated Safety Analysis Report, Chapter 14, Section 14.20, Containment Response | Stroke time Coast down GOTHIC |
ML21278A278 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.4, Excess Load Event | Shutdown Margin |
ML21278A281 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 15, Section 15.0, Technical Requirements Manual | Fire Barrier Condition Adverse to Quality Operability Determination |
ML21278A290 | 7 September 2021 | 2 to Final Safety Analysis Report, Chapter 14 ,Section 14.17, Loss-of-Coolant Accident | Loop seal Fuel cladding Accident Tolerant Fuel |