IR 05000324/1998300 | 15 June 1998 | NRC Operator Licensing Exam Repts 50-324/98-300 & 50-325/98-300 on 980508-15.Six SRO & Four RO Candidates Tested.All Passed Exam.One Candidate Identified as Having Some Performance Weaknesses | Job Performance Measure |
IR 05000324/1997300 | 30 May 1997 | NRC Operator Licensing Exam Repts 50-324/97-300 & 50-325/97-300 for Tests Administered on 970425-0502.Four SROs Passed Exam & One Failed & Three ROs Passed & One Failed.Emergency Operating Procedures Strategies Were Weak | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Hydrostatic Squib Job Performance Measure Scram Discharge Volume Overtravel Earthquake Offsite Circuit Overspeed trip |
IR 05000324/1992301 | 6 January 1993 | Exam Rept 50-324/92-301 During Week of 921207.Exam Results: All Applicants,Four ROs & Nine Sros,Passed Exams.Operating Crew & All Individuals Passed Simulator Portion of Requalification Retake Exam | |
ML20058K281 | 30 November 1990 | Exam Rept 50-324/OL-90-05 for Both Units on 901015-18 & 1108.Results:three of Three Crews & 9 Out of 11 Operators Performed Satisfactorily During Simulator Evaluations | Safe Shutdown Loss of condenser vacuum |
ML20058Q399 | 15 August 1990 | Exam Repts 50-324/OL-90-04 & 50-325/OL-90-04 on 900725 & 26. Exam results:1 of 2 Crews Evaluated & 9 of 12 Operators Performed Satisfactorily.One Operator Passed Requalification Exam | Reactor Vessel Water Level Scram Discharge Volume Failure to Scram |
IR 05000324/1990003 | 11 July 1990 | Operational Evaluation Repts 50-324/90-03 & 50-325/90-03 on 900609-10.Two Crews & 16 Operators Performed Satisfactorily. Major Areas Evaluated:Crew Evaluations on Simulator Per NUREG-1021 | |
ML20235Y932 | 9 October 1987 | Exam Rept 50-325/OL-87-02 on 870824-27 for Units 1 & 2.Exam Results:Two of Four Senior Reactor Operator & Eight of Nine Reactor Operator Candidates Passed Exam | |
ML20210A496 | 29 April 1987 | Exam Rept 50-325/OL-87-01 on 870112-16 for Units 1 & 2.Exam Results:Nine of Eleven Reactor Operators & All Eight Senior Reactor Operators Passed Oral,Simulator & Written Exams | |
ML20215F659 | 26 November 1986 | Exam Rept 50-325/OL-86-02 on 861028.Exam Results:Candidate Passed Written Reactor Operator Exam,Section 2 | |
ML20207J940 | 11 July 1986 | Exam Rept 50-325/OL-86-01 on 860519-23.Exam results:14 Candidates Passed Oral Exam & 1 failed,13 Candidates Passed Simulator Exam & 3 Failed & 12 Candidates Passed Written Exam & 3 Failed | Shutdown Margin Reactor Vessel Water Level High Radiation Area Fire Barrier Squib Overtravel Fuel cladding Offsite Circuit Power change Overspeed trip |
ML20138Q745 | 12 December 1985 | Exam Rept 50-325/OL-85-03 for Units 1 & 2 on 851007-10.Exam Results:Five Candidates Passed | Shutdown Margin Reactor Vessel Water Level Half scram Overspeed trip |
ML20205F829 | 28 October 1985 | Exam Rept 50-324/OL-85-02 for Units 1 & 2 on 850923-26.Exam results:12 Candidates Passed & Three Failed.Requalification Program Evaluation Satisfactory | Shutdown Margin Reactor Vessel Water Level High Radiation Area Overtravel Fuel cladding |
ML20128M443 | 11 June 1985 | Exam Rept 50-325/OL-85-01 on 850521-22.Exam Results:One Instructor Certification Candidate Passed & Two Senior Reactor Operators Passed Written Reexams.Written Exam, Answer Key & Summary of Results Encl | Shutdown Margin Scram Discharge Volume Fuel cladding Pressure Boundary Leakage Unidentified leakage |