Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18107A319 | 21 May 1999 | Review of Submittal in Response to NRC GL-88-20,Suppl 4: 'Ipeees,' Fire Submittal Screening Review Technical Evaluation Rept:Salem Generating Station,Rev 1. | Hot Short Safe Shutdown High winds Fire Barrier Tornado Missile Probabilistic Risk Assessment Backfit |
ML18102A918 | 23 January 1997 | Technical Evaluation of Public Service Electric & Gas Co Responses Dtd 960619 & 1202 to NRR Rept, 'Safe Shutdown Capability Reassessment for Salem Nuclear Generating Station Units 1 & 2.' | Hot Short Safe Shutdown Fire Barrier Fire Protection Program |
ML18101B193 | 30 November 1995 | Final TER Salem Nuclear Power Station. | Hot Short Safe Shutdown Boric Acid Fire Barrier Multiple Spurious Operation Emergency Lighting Exemption Request Fire Protection Program Backfit |
L-95-040, Technical Evaluation Rept on Second 10-Yr Inservice Insp Program Plan | 30 September 1995 | Technical Evaluation Rept on Second 10-Yr Inservice Insp Program Plan | VT-2 Incorporated by reference Dissimilar Metal Weld |
ML18101B288 | 31 August 1995 | TER on IPE Submittal Human Reliability Analysis, Final Rept | Internal Flooding Probabilistic Risk Assessment Large early release frequency |
ML18101B287 | 31 August 1995 | Technical Evaluation Rept of Plant IPE Exam Back-End Submittal, Final Rept | Internal Flooding Probabilistic Risk Assessment |
ML18101B286 | 31 August 1995 | Technical Evaluation Rept of Plant IPE Front End Analysis. | Mission time Internal Flooding Probabilistic Risk Assessment Large early release frequency |
ML18101A375 | 30 November 1994 | Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001:Hope Creek & Salem-1/2. | |
ML17349A927 | 31 August 1992 | Technical Evaluation Rept,Pump & Valve Insevice Testing Program,Salem Generating Station,Units 1 & 2. | Boric Acid Stroke time Cold shutdown justification |
ML18096A388 | 13 December 1991 | Final, Technical Evaluation Rept,Salem Generating Station, Station Blackout Evaluation. | Safe Shutdown |
ML18096A238 | 31 August 1991 | Auxiliary Feedwater System RISK-BASED Inspection Guide for the Salem Nuclear Power Plant | Probabilistic Risk Assessment |
ML18094B424 | 30 November 1989 | Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Salem Generating Station,Unit 1. | |
ML20211N503 | 9 January 1987 | Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept | |
ML20205Q616 | 5 May 1986 | Preimplementation Audit Rept for SPDS at Salem Nuclear Generation Station 1 & 2 | Shutdown Margin FLEX |
ML18092A959 | 5 December 1985 | Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Salem..., Technical Evaluation Rept | Affidavit |
ML20141C701 | 2 December 1985 | Suppl to Technical Evaluation Rept, Dcrdr for Salem Generating Station,Units 1 & 2 | Emergency Lighting Backfit |
ML20115A789 | 16 January 1985 | Pre-Implementation Audit of Detailed Control Room Design Review of Salem Generating Station Units 1 & 2, Technical Evaluation Rept | Backfit |
ML20087N530 | 31 March 1984 | Evaluation of Detailed Control Room Design Review Summary Rept for Salem Stations 1 & 2, Technical Evaluation Rept | Backfit |
ML20023E178 | 31 May 1983 | Copper in the Intake and Discharge Zones of the Surry and Salem Nuclear Power Stations | |
ML18087A910 | 7 April 1983 | Evaluation of Failure to Trip,Of Reactor Trip Circuit Breakers on 830222 & 25,Salem Nuclear Generating Station Unit 1, Interim Technical Evaluation Rept | |
ML20090H700 | 31 March 1983 | Conformance to Reg Guide 1.97,Salem Nuclear Generating Station Units 1 & 2 | |
ML20076C511 | 18 March 1983 | Masonry Wall Design (B-59) Public Svc Electric & Gas Co,Salem Generating Station Units 1 & 2 | Operating Basis Earthquake Tornado Generated Missile Design basis earthquake |
ML20077K823 | 23 February 1983 | Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept for Salem 1 & 2 | |
ML20065E232 | 28 September 1982 | PWR Main Steam Line Break W/Continued Feedwater Addition (B-69) Pse&G,Salem Nuclear Generating Station Units 1 & 2, Technical Evaluation Rept | Boric Acid Shutdown Margin |
ML20077K022 | 28 September 1982 | ECCS Repts (F-47) TMI Action Plan Reqirements,Pse&G,Salem Nuclear Generating Station Unit 1, Technical Evaluation Rept | |
ML18086B583 | 15 July 1982 | Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Technical Evaluation Rept,Vols 1 & 2 | |
ML20064L752 | 15 July 1982 | Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Public Svc Electric & Gas Co,Salem Nuclear Generating Station,Unit 1, Vols 1 & 2,Technical Evaluation Rept | Boric Acid Post Accident Monitoring Loctite |
ML18086B487 | 19 April 1982 | PWR Moderator Dilution, Technical Evaluation Rept | |
ML20049H915 | 3 March 1982 | to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. | |
ML18086A821 | 30 June 1981 | Adequacy of Station Electric Distribution Sys Voltages, Salem Nuclear Power Station Units 1 & 2, Technical Evaluation Rept | Safe Shutdown |
ML18086A725 | 27 April 1981 | Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Salem Unit 1, Technical Evaluation Rept | Anticipated operational occurrence |
ML20003F118 | 9 March 1981 | Adequacy of Station Electric Distribution Sys Voltages, Preliminary Safety Evaluation | Safe Shutdown |
ML19345G223 | 28 February 1981 | Inservice Testing Program,Salem Nuclear Generating Station, Unit 1, Safety Evaluation for 790501-801201 | Boric Acid Stroke time Power Operated Valves |
ML18085A863 | 30 November 1980 | Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Salem Unit 1. Revision 1 to Technical Evaluation Rept | Safe Shutdown Earthquake |
ML19336A599 | 31 October 1980 | Ser,Inservice Testing Program,Salem Nuclear Generating Station Unit 2, Interim Rept | Boric Acid Stroke time Power Operated Valves |
ML19340B976 | 31 October 1980 | Ser,Inservice Testing Program,Salem Nuclear Generating Station Unit 1, May 1979-Nov 1980 | Boric Acid Stroke time Power Operated Valves |
ML18081B124 | 31 January 1980 | Technical Evaluation Rept of Electrical,Instrument & Control Aspects of Inadvertent Safety Injections at Salem, Unit 1. | |
ML19322E282 | 30 November 1979 | Electrical Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals, Informal Rept | |
ML18079A282 | 31 July 1977 | Corrosion of Matls in Spent Fuel Storage Pools. | Boric Acid |