ML20202J12830 November 1998Technical Evaluation Rept Pump & Valve Inservice Testing Program Shearon Harris Nuclear Power PlantSafe Shutdown
Boric Acid
Stroke time
Excess Flow Check Valve
Power Operated Valves
Scaffolding
ML20127E30630 September 1992TER for Evaluation of ODCM Rev 3,Shearon Harris Nuclear Power Plant,Unit 1Offsite Dose Calculation Manual
Anticipated operational occurrence
Power change
ML19332B58430 September 1989Conformance to Generic Ltr 83-28,Item 2.2.1-Equipment Classification for All Other Safety-Related Components: Harris, Technical Evaluation Rept
ML18005A65231 July 1988Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program:Shearon Harris Nuclear Power Plant,Unit 1.Hydrostatic
VT-2
Incorporated by reference
Dissimilar Metal Weld
ML18022A63929 February 1988Rev 1 to Technical Evaluation Rept,Pump & Valve Inservice Testing Program.Boric Acid
Stroke time
Cold shutdown justification
Power Operated Valves
Overspeed trip
ML18004B83731 March 1987Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Shearon Harris Nuclear Power Plant,Unit 1, Informal ReptBoric Acid
Stroke time
Cold shutdown justification
Power Operated Valves
Overspeed trip
ML20215G27031 March 1987Demonstration of Containment Purge & Vent Valve Operability, Informal Rept
ML20214F50331 March 1987Conformance to Generic Ltr 83-28,Item 2.2.2, `Vendor Interface Programs (All Other Safety-Related Components),' Shearon Harris 1 & 2, Technical Evaluation Rept
ML20211N5039 January 1987Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept
ML20205E39931 July 1986Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components) Ginna,Haddam Neck,Millstone 3 & Harris 1
ML18003B24130 April 1986Audit of Pump & Valve Operability Assurance Program for Shearon Harris Nuclear Power Plant,Informal ReptStroke time
Hydrostatic
Anchor Darling
Overspeed trip
ML18003B24231 March 1986Sqrt Visit Rept, Informal ReptStroke time
Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML20154G71828 February 1986Review of the Shearon Harris Unit 1 Auxiliary Feedwater System Reliability AnalysisStroke time
Time to boil
Earthquake
Power-Operated Valves
Power Operated Valves
ML20136F65331 December 1985Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation ReptNondestructive Examination
ML20137F89830 September 1985Conformance to Reg Guide 1.97,Shearon Harris Nuclear Power Plant,Units 1 & 2Grab sample
ML20128H77930 June 1985Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept
ML20126E98631 May 1985Review of Emergency Diesel Generator Engine & Auxiliary Module Wiring & Terminations, Technical Evaluation Rept
ML20106A41831 August 1984Control of Heavy Loads at Nuclear Power Plants,Shearon Harris Nuclear Power Plants,Units 1 & 2, Draft Technical Evaluation ReptSafe Shutdown
Safe Shutdown Earthquake
Control of Heavy Loads