Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20006D548 | 20 October 1989 | Discusses Insp of Ebasco Procurement Activities at Facility. Involved Ebasco Personnel Will Be Trained on Requirements Prior to Initiation of Any New safety-related Purchase Orders as Required by Quality Program Manual | |
ML20245K595 | 19 June 1989 | Discusses Nonconformances Noted Re 35 Purchase Orders Placed W/Gismo Co Prior to June 1980 W/O Supplier on Approved List. Ebasco Maintains High Confidence Level That Procurement of Subj Matl Does Not Represent Safety Consideration | |
ML20247P941 | 17 May 1989 | FOIA Request for Final Open Item Transmittal Ltrs Per NRC Insp Procedure 94300B for Listed Plants | |
ML20235A125 | 16 December 1987 | Forwards Info Re Resource Technical Svcs,Inc,Including Summary of NRC Contract Work,Nrc Form 26 for Three Existing Contracts,Audit Info,Work History & Lists of Expertise Available for Special Insps & of Current Resource Svcs | |
ML20236U522 | 19 October 1987 | FOIA Request for LERs for Listed Plants,Including All Attachments & Encls from Original Documents | |
ML20235L797 | 25 June 1987 | Forwards Final EGG-NTA-7668, Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components:Waterford 3, Informal Rept. Licensee Should Describe Interface Program W/Nsss Vendor | |
ML20214Q914 | 21 April 1987 | Forwards EGG-NTA-7446, Conformance to Generic Ltr 83-28, Item 2.2.1 - Equipment Classification for All Other Safety- Related Components:Waterford-3 | |
ML20214R136 | 26 March 1987 | Forwards Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28,Reactor Trip Sys Vendor Interface:Maine Yankee, St Lucie 1 &-2 & Waterford 3, Final Rept.Plants Conform to Generic Ltr | |
ML20235P263 | 5 June 1985 | Informs That Retyped Version of 850530 Appeal Board Hearing Delivered to Appeal Board.Original Transcripts Rejected Due to Typeface on Printer | |
ML20095A192 | 15 August 1984 | Forwards NUS Project Plan for Prelicensing Issues Task Force Support Group | |
ML20094J631 | 9 August 1984 | Forwards Resumes for NUS Personnel Involved W/Preliminary Issues Task Force Support Group.Inspector & Auditor Certificates Also Encl | Hydrostatic Finite Element Analysis Earthquake Fire Protection Program Backfit |
ML20101E284 | 15 June 1984 | FOIA Request That Exercise Repts for Waterford 3 & Comanche Peak Re Emergency Preparedness Exercises Held in 1983 & 1984 Be Placed in PDR | |
ML20128G873 | 7 May 1984 | Forwards Evaluation of Concrete in Basemat,Waterford Unit Number 3, Based on Observation of Record During 840430-0504 | |
ML20112H810 | 5 April 1984 | FOIA Request for Repts Resulting from Listed Environ Qualification of Equipment Site Audits to Be Placed in Pdr. Access to Any Repts Resulting from Audits Held Since Oct 1982 Also Requested | |
ML20076E141 | 17 August 1983 | Responds to NRC Inquiry Re Classification of Stresses by C-E in Potential Finding Rept 2448-011.Misclassification of Stresses Is Isolated Case,Based on Specific Method.No Generic Problem Indicated | |
ML20072K895 | 29 March 1983 | Forwards Util Transmitting Vols 1-3, Independent Design Review of Waterford Steam Electric Station Unit 3 Emergency Feedwater Sys.Sys Design Adequate | |
ML20039C675 | 17 August 1981 | Forwards Revised FSAR Subsection 2.4.2.3 Re Effects of Local Intense Precipitation to Assist in Review.Flood Study of Cooling Towers & Potential for Blockage of Reactor Bldg Roof Drains as Suppl Info Also Encl | |
ML20009H273 | 6 August 1981 | Forwards Revised Sections & Table of Contents Discussed in NRC 810610 Ltr for ETR-1001,Ebasco Nuclear QA Program Manual.Revisions,Which Are Dtd 810731 Will Be Included in Change 10 to ETR-1001 | |
ML19254F899 | 12 November 1979 | Forwards Reply to Concern Re Effect of Cloud Expansion Upon Burning.Deflagration of Worst Cloud Ensuing from Catastrophic Break in Pipelines Poses No Hazard to Plant | |
ML19209C877 | 12 October 1979 | Responds to 791011 Telcon.Forwards AP Van Ulden Article, Loss Prevention & Safety Promotion in Process Industries. Article Used in FSAR to Determine Area of Fluid Flowing Under Force of Gravity | |
ML19208D188 | 24 September 1979 | Forwards Updated Electrical Instrumentation & Control Drawings Noted in FSAR Table 1.7-1.Drawings Available in Central Files | |
ML19208B758 | 19 September 1979 | Forwards Errata Sheet for Environ Rept,Amend 1 | |
ML20204B952 | 9 November 1978 | Ack Receipt of 781005 NRC Ltr Accepting Recently Proposed Rev to Topical Rept ETR-1001,Ebasco Quality Assurance. Manual.Forwards Rev Pages Which Will Affect Subj Facils |