Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20235A12516 December 1987Forwards Info Re Resource Technical Svcs,Inc,Including Summary of NRC Contract Work,Nrc Form 26 for Three Existing Contracts,Audit Info,Work History & Lists of Expertise Available for Special Insps & of Current Resource Svcs
ML20136E51711 October 1985FOIA Request for Operator Exam Results from 1979 - 1982 to Be Placed in PDR
ML20112D83810 April 1984FOIA Request for Draft Rept on Failure Modes & Effects Analysis of Events That Could Result in Steam Generator Overfill for Facility
ML19317E7736 September 1973Forwards Correctly Numbered 730802 Prehearing Transcript to Replace Misnumbered One.W/O Encl
ML19312C35615 November 1972Forwards Summary of Hydrologic Engineering Studies Pertaining to Facility DevelopmentHigh winds
ML19322B25815 November 1972Submits Rept on Hydrologic Engineering Studies of Flood Potential for Keowee-Toxaway Development of Oconee StationsHigh winds
ML19322B2274 September 1970Forwards Comments on Fsar,Vols 1-3,Amends 8-18 & on B&W Topical Repts BAW-10008,Parts 1 & 2, Review of Seismic Design.Concludes Design Adequate for Postulated Seismic Conditions.W/O Encl
ML19322B22412 August 1970Requests Deletion of Two Comments from Blume Preliminary Rept,Review of Seismic Design of Oconee Which Pertain to B&W Topical Repts BAW-10008,Parts 1 & 2 Re LOCA Seismic DisturbancesEarthquake
ML19317E36512 August 1970Notifies That Review of BAW-10008 Completed.Requests Deletion of Comment 5 & Revision of Comment 6 Re Seismic Design.Designs Presented in 700803 Informal Matl AcceptableEarthquake
ML19322B17529 April 1970Comments on Seismic Design of Keowee Hydroelectric Facilities as It Relates to Oconee,In Response to NRC Request
ML19322B1653 April 1970Forwards Comments & Questions from Review of B&W Topical Repts BAW-10008,Parts 1 & 2 Re LOCA & Seismic ExcitationEarthquake
ML19317E2402 September 1969Forwards Seismic Review of FSAR Vols 1 & 2 Per RequestFinite Element Analysis
Earthquake
ML19322B14624 April 1969Comments on Amend 6 Re Mod in Design of Weir
ML19322B1612 February 1969Forwards Questions & Comments Resulting from Review of Fsar,Vols 1 & 2
ML19322B1975 July 1967Comments on Stability of Proposed Submerged Weir in Intake CanalEarthquake
ML19317E24523 June 1967Forwards Adequacy of Structural Criteria for Oconee Nuclear Station Units 1,2 & 3.
ML19308B24325 May 1967Forwards Draft Rept, Adequacy of Structural Criteria for Oconee Units 1,2 & 3.
ML19319A74814 February 1967Provides Questions Based on Review of Psar,Vols 1 & 2