Notifies That Review of BAW-10008 Completed.Requests Deletion of Comment 5 & Revision of Comment 6 Re Seismic Design.Designs Presented in 700803 Informal Matl Acceptable
ML19317E365
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/12/1970
From: Sharpe R
JOHN A. BLUME & ASSOCIATES, ENGINEERS
To: Case E
US ATOMIC ENERGY COMMISSION (AEC)
References
CON-AT(49-5)-4011 NUDOCS 7912170566
Download: ML19317E365 (2)


Text

_

rana j oATL or ooCuutper: -

l oATE el.ctuto il J6ha /. Bleren (, Asocciates C-1,2 70 G44-73

  • y ntu oina u tua au oar:

San Frar.cisco, (111f.

c, R.

X CC:

U IH tR-OHtG.:

gg 1

E. Cr:a '

ACTION NECES$ARY b

COpeCO RRENC E D ATE AN>WERED:

NO ACTION NECE$$ ART O Couacur O

o <:

F ILL CO DE:

POST Of FICE

%259h270-2S7 d,x tez /',

EA ntF:

DATC U

,,, o.,, o.

REFtn sT.TTO DATE RECEfVED BY OL5cluP18QN: (Mutt De Up.14%$tf ed) g.g pg Ltr forninhing emnto on PGl Tcpical g, %

revica. L*?! 10003 cn part 16 7...t.

<!/2 cya for actica regnstlic corrnnts 4 5, for prelic-revins, dtd 7-21-70, las deleted....

pisintyi.Tric;L

- T.MsI11TET

+

-onuosuRes:

Morris (2) 00IVoll&

~.,

IS m *,.., -

L< Un h {;;~,*) l;;' ': l p)

MLMARKS:

1

~8 m.

u.s. ATouic car.aov commissord FA AllCONTROL FORM roaa AEC s2ss S S-60B i369 364 694 A U. s. covEnNM NT PRINTING OFFICE l

i.

f 7912170 f[h [

7

y o-r, f

~.. -

J 0llfl A. Bl.U M E A S S O C ill T E S, E il u l fl E E R S

=O 1

612 HOWARD STliEET

  • GAf4 FR ANCISCO.. CAUFORNI A 94105 * (415) 397-2525 NEv tio,t..tr L

August 12, 1970 Mr. Edson G. Case, Director Division of Reactor Standards U.S. Atomic Energy Commission Washington, D.C.

20343 Contract No:

AT(49-5)-4011 Blume Project No:

2085511

Subject:

Oconce Nuclear Station Units 1, 2, and 3 Duke Power Company

' Docket Nos. 50-269, 270, 287

Dear Mr. Case:

We have completed our review of the applicant's responses to our comments pertaining to Babcock and Wilcox Topical Reports, BAW-10008, Part 1, " Reactor Internals Stress and Deficction Due to Loss-of-Coolant Accident and Maximum flypothetical Earthquake" and BNV-10008, Part 2, " Fuel Assembly Stress and Deficction Analysis for Loss-of-Coolant Accident and Seismic Excitation" and concur with the appli-cant's approach to the analysis. We would, therefore, like to delete Comment number S fraa our preliminary report, " Review of the Seismic Design of the Oconee Nuclear Station, Units 1, 2, and 3,"

dated July 21, 1970.

We have also reviewed the informal material dated August 3,1970 pertaining to the analysis of the Keowce Powerhouse and Spillway seismic analysis. We have assumed that the data presented are for critical members.

If this is so, we feel the designs are acceptable and would like to revise Comment number 6 of our p climinary report by deleting reference to the following items:

Powerhouse Concrete Substructure and Steel Superstructure Spillway Concrete Gate Structure Tainter Gates and Anchorage j

1 Very tmly yours, J0llN A. BLUME G ASSOCIATES, ENGINEERS d17'/$ c')U M