Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24032A4701 February 2024Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC
ML24024A02024 January 2024Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures
ML24024A24524 January 20241/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures
ML23326A01322 November 2023Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel
ML23318A09514 November 2023Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia FuelAnticipated operational occurrence
Fuel cladding
ML23317A07313 November 2023Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.aSurveillance Frequency Control Program
ML23297A23124 October 2023E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia FuelExemption Request
Affidavit
ML23265A23022 September 2023Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC
ML23258A05531 August 2023Setup of Online Reference Portal and Audit Plan for the NRC Staff'S Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail)Loop seal
Exemption Request
Fuel cladding
ML23199A28318 July 2023Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits
ML23172A07521 June 2023Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia FuelFuel cladding
ML23171B05220 June 2023NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted)
ML23145A00525 May 2023Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod CladdingExemption Request
ML23145A00425 May 2023Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies
ML23129A3129 May 2023NRR E-mail Capture - Beaver Valley Unit 2 - Verbal Authorization of Alternative Request, 2-TYP-4-RV-06Liquid penetrant
ML23128A1618 May 2023NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing
ML23125A1605 May 2023NRR E-mail Capture - Correction to Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head PenetrationsLiquid penetrant
ML23125A1465 May 2023NRR E-mail Capture - Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head PenetrationsLiquid penetrant
ML23122A0342 May 2023NRR E-mail Capture - Beaver Valley - Request for Additional Information Regarding Unit 1 - 180 Day Steam Generator Tube Inspection Report
ML23115A30224 April 20234/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints
ML23089A12530 March 2023NRR E-mail Capture - Beaver Valley Upcoming Steam Generator Tube Inservice Inspection
ML23089A18829 March 2023Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report
ML23079A12020 March 2023NRR E-mail Capture - Acceptance Review for Beaver Valley 1 & 2 Exemption from Specific Provisions in 10 CFR 50 Appendix H
ML23067A2167 March 2023NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code
ML23065A0783 March 2023Final RAIs Regarding the Beaver Valley Emergency LAR (EPID L-2023-LLA-002) - Email
ML23038A0157 February 2023Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures
ML23024A15224 January 2023Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis
ML23018A03517 January 2023NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003)
ML22321A23917 November 2022NRR E-mail Capture - (External_Sender) Beaver Valley Power Station, Units 1&2 - Clarification on LAR to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay TimeRecently irradiated fuel
ML22320A57516 November 2022E-mail to File - Summary of October 18, 2022, Meeting with Dominion to Discuss Requested Actions for Implementing Framatome Gaia Fuel
ML22312A5918 November 2022NRR E-mail Capture - Beaver Valley Power Station, Units 1&2 - Request for Additional Information LAR to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay TimeRecently irradiated fuel
ML22298A20525 October 2022Acceptance Review Determination for Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles
ML22292A32119 October 2022Acceptance Review Determination for Alternative Request for Containment RSS Pump Periodic Verification Testing Program
ML22297A1807 October 2022Email Acknowledgement to Dominion Energy Nuclear Decommissioning Trust Fund Disbursement 30 Day Notification for Millstone Power Station Unit 1: Docket No 50-245
ML22278A0935 October 2022E-mail to File - Summary of September 7, 2022, Meeting with Dominion to Discuss Proposed Supplement to the Spent Fuel Pool Criticality Safety Analysis (EPID L-2022-LRM-0059
ML22273A11330 September 2022NRR E-mail Capture - Acceptance of Requested Licensing Action to Add Full Spectrum LOCA Methodology to COLR
ML22272A03329 September 2022Memo E-mail to File - Summary of August 29, 2022, Meeting with Dominion to Discuss Proposed Alternative Request Post-peening follow-up Volumetric Exam of RPV Head Penetration NozzleBoric Acid
Pressure Boundary Leakage
Dissimilar Metal Weld
ML22277A51219 September 2022NRR E-mail Capture - (External_Sender) Eh Response to Corrected SE Associated with Beaver Valley Amendments 315 and 205 Changes to the EPP
ML22252A1779 September 2022Memo E-mail to File - Summary of August 9, 2022, Meeting with Dominion to Discuss Proposed Alternative Reqeust Recirculation Spray Pump Flow Testing (EPID L:2022-LRM-0057)
ML22238A28125 August 2022Request for Additional Information for Beaver Valley Unit 2 - 2R22 Steam Generator 180 Day Report
ML22242A04523 August 2022NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000)
ML22202A46429 June 2022Emergency Plan Safety Evaluation
ML22178A13224 June 2022Request for Additional Information for Beaver Valley Unit 2 Steam Generator Inspection Report - Fall 2021 Refueling Outage
ML22174A35523 June 2022NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078)
ML22173A04021 June 2022NRR E-mail Capture - Acceptance of Requested Licensing Action Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time
ML22147A03927 May 2022NRR E-mail Capture - (External_Sender) NRC Notification to the State of Pennsylvania Regarding a Beaver Valley, Units 1 & 2 Amendment - Revise TS 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Separation Instrumentation
ML22129A0126 May 2022NRR E-mail Capture - (External_Sender) NRC Notification to the State of Pennsylvania Regarding a Beaver Valley Power Station, Unit 2 Amendment - Correct TS 3.1.7 Change Made by TSTF-547
ML22123A0813 May 2022Acceptance Review Determination for Proposed LAR for TS Change Applicable to TSTF-359, Increase Flexibility in Mode Restraints
ML22123A0232 May 2022NRR E-mail Capture - Acceptance of Requested Licensing Action for Beaver Valley Power Station, Units 1 and 2 - Adoption of TSTF-501, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control