ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20211D649 | 25 August 1999 | Part 21 Rept Re Nonconformance within LCR-25 safety-related Lead Acid Battery Cells Manufactured by C&D.Analysis of Cells Completed.Analysis of Positive Grid Matl Shows Nonconforming Levels of Calcium within Positive Grid Alloy | |
ML18107A344 | 1 June 1999 | Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716 | |
ML20206H261 | 5 May 1999 | Part 21 Rept Re Defect Found in Potter & Brumfield Relays. Sixteen Relays Supplied in Lot 913501 by Vendor as Commercial Grade Items.Caused by Insufficient Contact Pad Welding.Relays Replaced with New Relays | |
ML18016A901 | 12 April 1999 | Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected | |
ML20205N834 | 1 April 1999 | Part 21 Rept Re Automatic Switch Co Nuclear Grade Series X206380 & X206832 Solenoid Valves Ordered Without Lubricants That Were Shipped with Std Lubrication to PECO & Tva.Affected Plants Were Notified | |
ML20207M923 | 12 March 1999 | Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results | |
ML18106B093 | 25 February 1999 | Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified | |
ML18106B055 | 1 February 1999 | Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl | |
ML18106B044 | 29 January 1999 | Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables | |
ML17354B097 | 9 September 1998 | Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils | |
ML18066A277 | 13 August 1998 | Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency | |
ML20236V312 | 29 July 1998 | Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem | |
ML20236N387 | 9 July 1998 | Part 21 Rept Re Deficiency Identified in Event 32725, Corrected by Mgp Instruments Inc.Licensee Verified,Affected Equipment Has Been Reworked & Tested at Sce.Design Mod Completed | |
ML20236N675 | 9 July 1998 | Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps | |
ML20248A167 | 22 May 1998 | Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 | |
ML20247G613 | 13 May 1998 | Part 21 Rept Re Defect Contained in Automatic Switch Co, Solenoid Valves,Purchased Under Purchase Order (Po) 970161. Caused by Presence of Brass Strands.Replaced Defective Valves | |
ML20217A153 | 16 April 1998 | Closure to Interim Part 21 Rept Submitted to NRC on 970929. New Date Established for Completion of Level I & 2 Setpoint Project Committed to in .Final Approval of Setpoint Calculations Will Be Completed by 980531 | |
ML20217D570 | 20 March 1998 | Part 21 Rept 40 Re Governor Valve Stems Made of Inconel 718 Matl Which Caused Loss of Governor Control.Control Problems Have Been Traced to Valve Stems Mfg by Bw/Ip.Id of Carbon Spacer Should Be Increased to at Least .5005/.5010 | |
ML20198Q696 | 12 January 1998 | Part 21 Rept Re Failed Operation of Agastat EGPI004 Relay on 971129,as Reported by Limerick Station.Caused by Insufficient Soldering.Will Notify Customers Who Purchased EPI004 & ETR14XXX004 Relays During June 1996 | |
ML18065B135 | 6 January 1998 | Part 21 Rept Re Use of Deltstrat Code for RCS Flow Rate Determination.Code Corrects for Temps to Determine Hot Leg Bulk Coolant Temp | |
LD-97-033, Part 21 Rept Re Defect in Potter & Brumfield Mdr Relays, Models 170-1 & 7032.Extended Problem to Include All Mdr Relay Models W/Date Codes 93XX-95XX.Root Cause Analysis, Written Rept & Recommended Corrective Actions Due by 971201 | 20 November 1997 | Part 21 Rept Re Defect in Potter & Brumfield Mdr Relays, Models 170-1 & 7032.Extended Problem to Include All Mdr Relay Models W/Date Codes 93XX-95XX.Root Cause Analysis, Written Rept & Recommended Corrective Actions Due by 971201 | |
LD-97-028, Part 21 Rept Re Contamination of Lubricant Which Has Led to Hardening of Lubricant in Certain Potter & Brumfield Mdr Relay Models 170-1 & 7032.Will Distribute Copy of Rept to Utils Having ABB-CE Designed Nuclear Steam Supply Sys | 13 October 1997 | Part 21 Rept Re Contamination of Lubricant Which Has Led to Hardening of Lubricant in Certain Potter & Brumfield Mdr Relay Models 170-1 & 7032.Will Distribute Copy of Rept to Utils Having ABB-CE Designed Nuclear Steam Supply Sys | |
ML20211M649 | 8 October 1997 | Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted | |
ML20211H791 | 30 September 1997 | Part 21 Rept Re Failure of Weldment Associated w/lube-oil Piping Sys on 970804 at Millstone,Unit 2.Root Cause Is Not Yet Known.Quality of Weldment Is Being Considered.Listed Util Sites Affected | |
ML17309A621 | 29 September 1997 | Part 21 Rept Re Final Disposition of Masterflow 713 & Embeco 636 Grout Nonconformance Reported by Master Builders,Inc. Licensee Continuing to Monitor shelf-life of Masterflow 713 & Embeco 636 Grouts Produced at Rancho Cucamonga | |
ML20217D414 | 29 September 1997 | Interim Part 21 Rept Re Errors Noted During Preparation of ITS Surveillance Test Procedures Using GE Calculated Setpoints.Setpoint Calculations Will Be Reviewed,Corrected & Approved to Establish Significance of Errors | |
LD-97-024, Part 21 Rept Re Error in Energy Redistribution Factor Used in LOCA Analysis for Listed Plants for Which ABB-CE Performed Analysis.Issued Recommendations Info Bulletin 97-004 | 14 August 1997 | Part 21 Rept Re Error in Energy Redistribution Factor Used in LOCA Analysis for Listed Plants for Which ABB-CE Performed Analysis.Issued Recommendations Info Bulletin 97-004 | |
ML20217H051 | 5 August 1997 | Part 21 Rept Re Discovery That Radiation Monitoring Sys Power Supply Circuit Board Subject to Premature Electronic Component Failure | |
ML17264A938 | 10 July 1997 | Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process | |
ML18153A143 | 10 June 1997 | Part 21 Rept Re Possible Machining Defect in Certain Stainless Steel Swagelok Tube Fitting Bodies.Facilities Have Been Notified About Possible Problem | |
ML20140A966 | 29 May 1997 | Part 21 Rept Re Ksv Emergency Diesel Generator Power Piston Failure.Caused by Jacket Water in Combustion Chamber. Recommends That Users Verify That Crown Thickness at Valve Cutout Be 100 Minimum | Finite Element Analysis |
ML20140A476 | 27 May 1997 | Provides Addl Info to 970429 Part 21 Rept Re Potential safety-related Problem W/Asco HV 266000-007J Scram Solenoid Pilot Valves.Corrective Actions Also Listed | |
ML20140G448 | 1 May 1997 | Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby Diesel Generator Sys.Recommends That Springs Be Inspected on Periodic Basis,Such as During Refueling Outages | |
ML20137G626 | 25 March 1997 | Svcs Part 21 Rept Re Emergency Generators Installed at Zion Station Which Developed Significant Drop in Crankcase Lube Oil Level.Caused by Crack in Liner Wall,Allowing Jacket Water to Enter Chamber | Finite Element Analysis |
LD-97-002, Part 21 Rept Re Piping Line Loss Between SG & MSIV Inlet When MSSVs Area Activated.Recommends That Utils Confirm Proper Adjustment of MSSV Blowdown Settings So as to Preclude Valve Chatter & Related Structural Concerns | 17 January 1997 | Part 21 Rept Re Piping Line Loss Between SG & MSIV Inlet When MSSVs Area Activated.Recommends That Utils Confirm Proper Adjustment of MSSV Blowdown Settings So as to Preclude Valve Chatter & Related Structural Concerns | |
ML20133E800 | 8 January 1997 | Deficiency Rept Re Nonconformance Related to Masterflow 713 Grout,Which Master Builders,Inc Has Supplied as Nuclear SR Product to 18 Npps.Cause Unknown.Requests That Listed Info Be Provided to Gain Insight as to Scope & Possible Cause | |
ML20134H336 | 5 November 1996 | Part 21 Rept Re Defective Inner Thrust Bearing 1801461-01 Used in PSA 35 Mechanical Shock Arrestor Used as Restraint on Piping Sys for Nuclear Generating Plant.Lot of Defective Parts Located & Isolated to Three Customers | |
ML18065B011 | 18 October 1996 | Part 21 Rept Re Application of Certain Aspects of ABB-CE Safety Analysis Methodology | |
ML18102A370 | 6 September 1996 | Part 21 Rept Re Installation of NUS Model OCA 801 Signal Isolator Modules & Model Mth 801 Signal Summator Modules. Replacement Modules Including Spares for Plant,Unit 2 Have Been Inspected by Vendor & Repaired | Design basis earthquake |
ML18102A338 | 21 August 1996 | Part 21 Rept Re Chipping of Latching Mechanism Props Installed in GE 4 Kv magne-blast Circuit Breakers,Type AM-4.16-350-2H.Two Affected Breakers Have Been Returned to Vendor | |
ML18102A559 | 8 August 1996 | Part 21 Rept Re Defect in NUS Model OCA801 Signal Isolator Modules.Replacement Modules Installed in Reactor Control & Protection Sys | Design basis earthquake |
ML20115D200 | 9 July 1996 | Part 21 Rept Re Mfg Defect of Enterprise DSR-4 & DSRV-4 Edgs,Originally Mfg by Calcon Corp.Amot Control Corp Purchased Calcon Product Line & Maintains Design & Production.Valves Returned to Cooper Energy Svcs on 960131 | |
ML20113D420 | 15 May 1996 | Part 21 Rept Re Certain Lots of Commercial Grade Potentiometers in Transmeters Have Been Supplied W/Lubrication in Noncompliance W/Engineering Spec Requirements | |
ML20117G464 | 14 May 1996 | Part 21 Rept Re Cooper Bessemer Reciprocating Products,Div of Cooper Cameron Corp,Issued Ltr to Define Utils/Plants Containing Similar Equipment as Supplied on Cooper Bessemer Ksv & Enterprise Dsr EDGs | |
LD-96-009, Part 21 Rept Re Potential Instrumentation Decalibr at Low Power.Affected Utils Should Ensure That Log Power Channels Properly Calibr & cross-correlated to Linear Power Channels at 100% Reactor Power | 15 April 1996 | Part 21 Rept Re Potential Instrumentation Decalibr at Low Power.Affected Utils Should Ensure That Log Power Channels Properly Calibr & cross-correlated to Linear Power Channels at 100% Reactor Power | |
ML18101A877 | 4 August 1995 | Interim Part 21 Rept Re Potentially Reportable Deficiency in Edward Valve Model 838YT Check Valves Due to Disk Exhibiting Excessive Leakage.Disk from Original Valve Cleaned, Inspected & Installed in Replacement Valve | |
ML18101A861 | 1 August 1995 | Interim Part 21 Rept Re Velan Valve Corp Check Valve Failure to Close.Insp of Internals Showed Moderate Wear in Gap Between Valve Disc & Hanger Arm.New Disc Installed & Valve Tested Satisfactorily | |
ML20086N998 | 21 July 1995 | Part 21 Rept Re Mdr Relays W/Potentially Damaged Internal Contact Arms | Commercial Grade Dedication |
ML20085J659 | 15 June 1995 | Potential Part 21 Rept Re Failure of Air Cylinder Mfg by Bellofram Corp at Ggns.Failure Discussed W/Mfg & Judged to Be Isolated Incident W/No Further C/A Required at Affected Utils or Cooper-Bessemer |