Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17170A01326 June 2017Proposed Alternative to Eliminate Examination of Threads in Reactor Pressure Vessel Flange (CAC Nos. MF8712-MF8729 and MF9548)
ML16230A2376 September 2016Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322)Incorporated by reference
Through-Wall Leak
ML15097A1531 May 2015Fourth 10-Year Interval Inservice Inspection Program Plan Requests for Relief and R-45 (TAC Nos. MF3406 and MF3407)Nondestructive Examination
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML13175A1117 August 2013Relief from the Requirements of the ASME Code, Relief Request No. I5R-06VT-2
ML13175A1256 August 2013Relief from the Requirements of the ASME Code, Relief Request No. I5R-07
ML13169A0625 August 2013Relief from the Requirements of the ASME Code, Relief Request No. I5R-01EVT-1
ML13175A1005 August 2013Relief from the Requirements of the ASME Code, Relief Request No. I5R-02VT-2
ML13092A40118 April 2013Relief from the Requirements of the ASME Code, Relief Request No. l5R-01 for Expanded Applicability for Use of ASME Code Case N-661-1Weld Overlay
Incorporated by reference
ML12145A70314 June 2012Relief Request to Extend the Fourth Inservice Inspection IntervalIncorporated by reference
Dissimilar Metal Weld
ML12121A63710 May 2012Request to Use Code Case N-789
ML08098031130 April 2008Relief Request to Use Boiling Water Reactor Vessel & Internals Project Guidelines..Incorporated by reference
EVT-1
ML06222041031 August 2006Relief Request Reactor Inservice Testing of Main Steam Electromatic Relief ValvesStroke time
Foreign Material Exclusion
Power Uprate
ML0500504762 February 2005Third 10-Year Inservice Inspection Interval Requests for ReliefIncorporated by reference
EVT-1
Dissimilar Metal Weld
Scaffolding
ML04294065112 November 2004Alternative Repair of Control Rod Drive Housing Interface with Reactor VesselWeld Overlay
VT-2
Pressure Boundary Leakage
Through-Wall Leak
ML0309206733 April 2003Relief, Alternative for Reactor Vessel 4-hour Pressure Test,Hydrostatic
VT-2
Incorporated by reference
ML0232402358 November 2002Proposed Relief Request to the Requirements of 10CFR50.55a Concerning the Third Ten-Year Interval Inservice Inspection ProgramHydrostatic
VT-2
ML02291014918 October 2002Relief, Alternative Repair of Control Rod Drive Housing Interface with Reactor Vessel. TAC MB5700VT-2
Through-Wall Leak
ML0227505562 October 2002Relief Request RP-04, Service Water Pump Suction Pressure Gages & RV-51, Containment Isolation Valve Position IndicationHigh Radiation Area