Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18107A31921 May 1999Review of Submittal in Response to NRC GL-88-20,Suppl 4: 'Ipeees,' Fire Submittal Screening Review Technical Evaluation Rept:Salem Generating Station,Rev 1.Hot Short
Safe Shutdown
High winds
Fire Barrier
Tornado Missile
Probabilistic Risk Assessment
Backfit
ML18102A91823 January 1997Technical Evaluation of Public Service Electric & Gas Co Responses Dtd 960619 & 1202 to NRR Rept, 'Safe Shutdown Capability Reassessment for Salem Nuclear Generating Station Units 1 & 2.'Hot Short
Safe Shutdown
Fire Barrier
Fire Protection Program
ML18101B19330 November 1995Final TER Salem Nuclear Power Station.Hot Short
Safe Shutdown
Boric Acid
Fire Barrier
Multiple Spurious Operation
Emergency Lighting
Exemption Request
Fire Protection Program
Backfit
L-95-040, Technical Evaluation Rept on Second 10-Yr Inservice Insp Program Plan30 September 1995Technical Evaluation Rept on Second 10-Yr Inservice Insp Program PlanVT-2
Incorporated by reference
Dissimilar Metal Weld
ML18101B28831 August 1995TER on IPE Submittal Human Reliability Analysis, Final ReptInternal Flooding
Probabilistic Risk Assessment
Large early release frequency
ML18101B28731 August 1995Technical Evaluation Rept of Plant IPE Exam Back-End Submittal, Final ReptInternal Flooding
Probabilistic Risk Assessment
ML18101B28631 August 1995Technical Evaluation Rept of Plant IPE Front End Analysis.Mission time
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
ML18101A37530 November 1994Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001:Hope Creek & Salem-1/2.
ML17349A92731 August 1992Technical Evaluation Rept,Pump & Valve Insevice Testing Program,Salem Generating Station,Units 1 & 2.Boric Acid
Stroke time
Cold shutdown justification
ML18096A38813 December 1991Final, Technical Evaluation Rept,Salem Generating Station, Station Blackout Evaluation.Safe Shutdown
ML18096A23831 August 1991Auxiliary Feedwater System RISK-BASED Inspection Guide for the Salem Nuclear Power PlantProbabilistic Risk Assessment
ML18094B42430 November 1989Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Salem Generating Station,Unit 1.
ML20211N5039 January 1987Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept
ML20205Q6165 May 1986Preimplementation Audit Rept for SPDS at Salem Nuclear Generation Station 1 & 2Shutdown Margin
FLEX
ML18092A9595 December 1985Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Salem..., Technical Evaluation ReptAffidavit
ML20141C7012 December 1985Suppl to Technical Evaluation Rept, Dcrdr for Salem Generating Station,Units 1 & 2Emergency Lighting
Backfit
ML20115A78916 January 1985Pre-Implementation Audit of Detailed Control Room Design Review of Salem Generating Station Units 1 & 2, Technical Evaluation ReptBackfit
ML20087N53031 March 1984Evaluation of Detailed Control Room Design Review Summary Rept for Salem Stations 1 & 2, Technical Evaluation ReptBackfit
ML20023E17831 May 1983Copper in the Intake and Discharge Zones of the Surry and Salem Nuclear Power Stations
ML18087A9107 April 1983Evaluation of Failure to Trip,Of Reactor Trip Circuit Breakers on 830222 & 25,Salem Nuclear Generating Station Unit 1, Interim Technical Evaluation Rept
ML20090H70031 March 1983Conformance to Reg Guide 1.97,Salem Nuclear Generating Station Units 1 & 2
ML20076C51118 March 1983Masonry Wall Design (B-59) Public Svc Electric & Gas Co,Salem Generating Station Units 1 & 2Operating Basis Earthquake
Tornado Generated Missile
Design basis earthquake
ML20077K82323 February 1983Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept for Salem 1 & 2
ML20065E23228 September 1982PWR Main Steam Line Break W/Continued Feedwater Addition (B-69) Pse&G,Salem Nuclear Generating Station Units 1 & 2, Technical Evaluation ReptBoric Acid
Shutdown Margin
ML20077K02228 September 1982ECCS Repts (F-47) TMI Action Plan Reqirements,Pse&G,Salem Nuclear Generating Station Unit 1, Technical Evaluation Rept
ML18086B58315 July 1982Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Technical Evaluation Rept,Vols 1 & 2
ML20064L75215 July 1982Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Public Svc Electric & Gas Co,Salem Nuclear Generating Station,Unit 1, Vols 1 & 2,Technical Evaluation ReptBoric Acid
Post Accident Monitoring
Loctite
ML18086B48719 April 1982PWR Moderator Dilution, Technical Evaluation Rept
ML20049H9153 March 1982to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment.
ML18086A82130 June 1981Adequacy of Station Electric Distribution Sys Voltages, Salem Nuclear Power Station Units 1 & 2, Technical Evaluation ReptSafe Shutdown
ML18086A72527 April 1981Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Salem Unit 1, Technical Evaluation ReptAnticipated operational occurrence
ML20003F1189 March 1981Adequacy of Station Electric Distribution Sys Voltages, Preliminary Safety EvaluationSafe Shutdown
ML19345G22328 February 1981Inservice Testing Program,Salem Nuclear Generating Station, Unit 1, Safety Evaluation for 790501-801201Boric Acid
Stroke time
Power Operated Valves
ML18085A86330 November 1980Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Salem Unit 1. Revision 1 to Technical Evaluation ReptSafe Shutdown Earthquake
ML19336A59931 October 1980Ser,Inservice Testing Program,Salem Nuclear Generating Station Unit 2, Interim ReptBoric Acid
Stroke time
Power Operated Valves
ML19340B97631 October 1980Ser,Inservice Testing Program,Salem Nuclear Generating Station Unit 1, May 1979-Nov 1980Boric Acid
Stroke time
Power Operated Valves
ML18081B12431 January 1980Technical Evaluation Rept of Electrical,Instrument & Control Aspects of Inadvertent Safety Injections at Salem, Unit 1.
ML19322E28230 November 1979Electrical Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals, Informal Rept
ML18079A28231 July 1977Corrosion of Matls in Spent Fuel Storage Pools.Boric Acid