Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis11 October 2023License Amendment Request 277 Updated Spent Fuel Pool Criticality AnalysisSurveillance Frequency Control Program
Power Uprate
L-2021-096, 10 CFR 50.59(d)(2) Summary Report11 May 202110 CFR 50.59(d)(2) Summary ReportSafe Shutdown
Boric Acid
Time of Discovery
Shutdown Margin
Ultimate heat sink
Non-Destructive Examination
Anticipated operational occurrence
Hydrostatic
Temporary Modification
Incorporated by reference
Missed surveillance
Surveillance Frequency Control Program
Exemption Request
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Continuous fire watch
Grace period
Power change
Coast down
Unidentified leakage
Power Uprate
L-2018-100, Submittal of 10 CFR 50.59(d)(2) Summary Report25 April 2018Submittal of 10 CFR 50.59(d)(2) Summary ReportSafe Shutdown
Boric Acid
Time of Discovery
Shutdown Margin
Ultimate heat sink
Non-Destructive Examination
Offsite Dose Calculation Manual
Anticipated operational occurrence
Hydrostatic
Temporary Modification
Incorporated by reference
FLEX
Missed surveillance
Surveillance Frequency Control Program
Operability Determination
Exemption Request
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Continuous fire watch
Grace period
Power change
Coast down
Unidentified leakage
Power Uprate
L-2017-006, Supplement to License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b.9 February 2017Supplement to License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b.Shutdown Margin
Probabilistic Risk Assessment
Surveillance Frequency Control Program
L-2014-369, License Amendment Request No. 236 Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B.23 December 2014License Amendment Request No. 236 Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B.Hot Short
Safe Shutdown
High winds
Shutdown Margin
Ultimate heat sink
Mission time
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Operator Manual Action
Multiple Spurious Operation
Large early release frequency
Earthquake
Turbine Missile
Fatigue Rule
Fire Protection Program
L-2012-314, License Amendment Request No. 224 Regarding Technical Specification 3/4.6.2.3 - Recirculation Ph Control System and Natb Basket Minimum Loading Requirement6 September 2012License Amendment Request No. 224 Regarding Technical Specification 3/4.6.2.3 - Recirculation Ph Control System and Natb Basket Minimum Loading Requirement
L-2011-498, Units, 3 & 4 - 10 CFR 50.59 Summary Report of Changes, Tests and Experiments for Period Covering 12/04/2009 Through 05/16/2011 and Updated Technical Specification Bases16 November 2011Units, 3 & 4 - 10 CFR 50.59 Summary Report of Changes, Tests and Experiments for Period Covering 12/04/2009 Through 05/16/2011 and Updated Technical Specification BasesSafe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Anticipated operational occurrence
Hydrostatic
Temporary Modification
Missed surveillance
Operability Determination
Exemption Request
Earthquake
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Continuous fire watch
Grace period
Power change
Coast down
Unidentified leakage
L-2011-276, Supplemental Response Regarding License Amendment Request No. 194, Control Room Habitability TSTF-448, and Changes to Technical Specification 3.7.5, Control Room Emergency Ventilation System1 August 2011Supplemental Response Regarding License Amendment Request No. 194, Control Room Habitability TSTF-448, and Changes to Technical Specification 3.7.5, Control Room Emergency Ventilation System
L-2011-264, Response to NRC Request for Additional Information on License Amendment Request (LAR-194) Re Control Room Envelope Habitability18 July 2011Response to NRC Request for Additional Information on License Amendment Request (LAR-194) Re Control Room Envelope HabitabilitySafe Shutdown
Ultimate heat sink
Incorporated by reference
Earthquake
L-2010-115, 10 CFR 50.59 Summary Report Changes, Tests, and Experiments Implemented as Allowed by 10 CFR 50.59 for the Period Covering May 11, 2008 Through December 4, 20094 June 201010 CFR 50.59 Summary Report Changes, Tests, and Experiments Implemented as Allowed by 10 CFR 50.59 for the Period Covering May 11, 2008 Through December 4, 2009Safe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Anticipated operational occurrence
Hydrostatic
Coatings
Missed surveillance
Operability Determination
Earthquake
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Continuous fire watch
Scaffolding
Grace period
Power change
Coast down
Unidentified leakage
Power Uprate
L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/0810 November 2008Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08Safe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Hydrostatic
Missed surveillance
Operability Determination
Earthquake
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Recently irradiated fuel
Continuous fire watch
Grace period
Power change
Coast down
GOTHIC
Unidentified leakage
L-2005-243, 10 CFR 50.59 Report8 December 200510 CFR 50.59 ReportSafe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Ultimate heat sink
Anticipated operational occurrence
Hydrostatic
Missed surveillance
Operability Determination
Earthquake
Power-Operated Valves
Power Operated Valves
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Continuous fire watch
Grace period
Power change
Coast down
Unidentified leakage
L-76-189, 05/13/1976 Letter Request to Amend Appendix a of Facility Operating License. Amendment Adds New Specification 3.1.6 on Unit 4 DNB Parameters & New Bases Section to Describe One of New DNB Parameters,13 May 197605/13/1976 Letter Request to Amend Appendix a of Facility Operating License. Amendment Adds New Specification 3.1.6 on Unit 4 DNB Parameters & New Bases Section to Describe One of New DNB Parameters,
ML18227D86325 February 197602/25/1976 Letter Request to Amend Appendix a of Facility Operating License. Proposes Technical Specification Changes Relating to Control Rod Insertion Limits for Unit 4, Cycle 3Shutdown Margin