Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
W3F1-2022-0054, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability1 November 2022Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point VulnerabilitySurveillance Frequency Control Program
W3F1-2021-0061, Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual14 October 2021Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements ManualSurveillance Frequency Control Program
Fire Protection Program
ML21266A16123 September 2021Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the ActuatedUltimate heat sink
Water Inventory Control
Surveillance Frequency Control Program
Recently irradiated fuel
W3F1-2021-0055, Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual20 August 2021Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements ManualBoric Acid
Surveillance Frequency Control Program
ML21182A1581 July 2021Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube InspectionsNondestructive Examination
ML21148A10428 May 2021Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control ProgramSurveillance Frequency Control Program
W3F1-2021-0003, Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B8 February 2021Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4BHot Short
Safe Shutdown
High winds
High Radiation Area
Ultimate heat sink
Mission time
Fire Barrier
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
FLEX
Tornado Generated Missile
Thermoset
Surveillance Frequency Control Program
Large early release frequency
Turbine Missile
Offsite Circuit
Fire Protection Program
Fire Watch
W3F1-2019-0062, License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual20 September 2019License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements ManualBoric Acid
Shutdown Margin
Anticipated operational occurrence
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Power change
ML11224A01020 July 2011License Amendment Request, Technical Specification Change Regarding Steam Generator Tube IntegrityNondestructive Examination
ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions27 April 2009Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour RestrictionsSafe Shutdown
Fitness for Duty
W3F1-2008-0045, License Amendment Request Relocation of TS 3.7.8 and Addition of LCO 3.0.8 the Inoperability of Snubbers18 September 2008License Amendment Request Relocation of TS 3.7.8 and Addition of LCO 3.0.8 the Inoperability of SnubbersIncorporated by reference
Earthquake
W3F1-2007-0036, License Amendment Request NPF-38-270 to Modify Diesel Generator Fuel Oil Testing Surveillance Requirements3 July 2007License Amendment Request NPF-38-270 to Modify Diesel Generator Fuel Oil Testing Surveillance RequirementsSafe Shutdown
Shutdown Margin
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Offsite Circuit
ML06242015329 August 2006Amendment Technical Specification Pages, Moderator Temperature Coefficient
W3F1-2006-0005, License Amendment Request NPF-38-267, Reactor Coolant System Leakage Detection Instrumentation15 February 2006License Amendment Request NPF-38-267, Reactor Coolant System Leakage Detection InstrumentationPacking leak
Grab sample
Safe Shutdown Earthquake
Pressure Boundary Leakage
Power change
W3F1-2005-0075, License Amendment Request NPF-38-266, Remove Limitation to Perform Various Surveillance Only During Shutdown27 October 2005License Amendment Request NPF-38-266, Remove Limitation to Perform Various Surveillance Only During Shutdown
ML0513003039 May 2005Technical Specifications, Issuance of Amendment No. 200 Modification of TS 5.3.1, Fuel Assemblies; TS 5.6.1, Criticality; TS 6.9.1.11.1, Core Operating Limits Reports & Deletion of TS IndexShutdown Margin
W3F1-2005-0019, Supplement to Amendment Request NPF-38-249, Extended Power Uprate17 March 2005Supplement to Amendment Request NPF-38-249, Extended Power UprateBoric Acid
W3F1-2004-0068, Supplement to Amendment Request NPF-38-249 Extended Power Uprate10 August 2004Supplement to Amendment Request NPF-38-249 Extended Power UprateBoric Acid
W3F1-2004-0059, Reactor Coolant System Leakage Detection8 July 2004Reactor Coolant System Leakage DetectionHigh Radiation Area
Enforcement Discretion
W3F1-2004-0014, License Amendment Request, Deletion of Pressurizer Heatup and Cooldown Limits15 March 2004License Amendment Request, Deletion of Pressurizer Heatup and Cooldown LimitsAnticipated operational occurrence
Hydrostatic
Probabilistic Risk Assessment
ML03300001421 October 2003Tech Spec Pages for Amendment 190, Revising the TSs by Changing the Current Main Steam Isolation Valve TS 3/4.7.1.5 to More Closely Reflect TS 3.7.2 Contained in NUREG-1432, Revision 2Ultimate heat sink
W3F1-2002-0073, Application for Technical Specification Change Regarding Missed Surveillances Using the Consolidated Line Item Improvement Process19 August 2002Application for Technical Specification Change Regarding Missed Surveillances Using the Consolidated Line Item Improvement ProcessTime of Discovery
Incorporated by reference
Missed surveillance
Grace period
ML0207202785 March 2002Technical Specification Pages for Amendment 181
ML0201002988 January 2002TS Pages for Amendment No. 177 Re Revision of Reactor Coolant System Cooldown RequirementHydrostatic