Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20216J60423 September 1999Evaluation of New Surveillance Data on Chemistry Factor for Weld Wire Heat 61782,Point Beach Unit 1
ML20198A90123 November 1998Rev 1 to Calculation PBNP-IC-33, 4.16KV Rt UV Matrix Relays Uncertainty/Setpoint Calculation
ML20154B81023 September 1998Rev 0 to 98-0132, Evaluation of 23.6 EFPY P-T Limit & LTOP Applicability Date & Pressurized Thermal Shock at 32 Efpy
ML20248C68430 March 1998Rev 1 to 09334281-01, RCS Internal Voltage Decay on Loss of A01/A02 4 Kv Bus
ML20140D7001 May 1997Delay Times for Containment Spray & Containment Accident Fans for Containment Integrity Accident Analysis (Tscr 192)Stroke time
ML20134C24924 January 1997Determination of Pbnp LTOP Setpoint Using ASME Code Case N-514 (Applicable Through Appx. Jan 2001)Hydrostatic
ML20133M59222 January 1997Press Release III-97-06, NRC Meetings W/Wi Electric Planned for 970124 & 31 on Recent Insp Findings & Point Beach Unit 2 Startup
ML20133E2349 January 1997Press Release III-97-03, NRC Staff Postpones Meeting W/ Wiep to Discuss Recent Insp Findings & Point Beach 2 Startup Activities
ML20133L1193 January 1997Determination of Pbnp LTOP Setpoint Using ASME Code Case N-514 (Applicable Through Appx Jan 2001)Hydrostatic
ML20133B1782 January 1997Press Release III-97-01, NRC Staff to Meet W/Wisconsin to Discuss Recent Insp Findings & Point Beach 2 Startup Activities
ML20134D29527 December 1996Uncertainty Associated W/Instrumentation Used in IT-14 for Fuel Oil Transfer Pumps
ML20134D38127 December 1996Uncertainty Associated W/Instrumentation Used in IT-17 & IT-18 for Bat PumpsBoric Acid
Shutdown Margin
ML20134D39427 December 1996Uncertainty Associated W/Instrumentation Use in IT-12 & IT-13 for CCW PumpsBoric Acid
ML20134D37320 December 1996Uncertainty Associated W/Instrumentation Used in IT-21 & IT-22 for Charging PumpsBoric Acid
Shutdown Margin
ML20134D33118 December 1996Instrument Uncertainty Associated W/Flow Instrumentation Used for IT-15 Chill Water Pumps Inservice Test
ML20132C05517 December 1996Press Release III-96-73, Postponement of Meeting to Discuss Preliminary Findings of NRC Team Insp at Point Beach Nuclear Plant
ML20134D40112 December 1996Instrument Uncertainty Associated W/Flow Instrumentation Used for IT-11 SFP Cooling Pump Inservice TestBoric Acid
Stroke time
Locked High Radiation Area
Power-Operated Valves
ML20135B6154 December 1996Press Release III-96-072, NRC Staff Proposes $325,000 Fine Against Wisconsin Electric Co for Violations of NRC Requirements at Point Beach Nuclear PlantBoric Acid
ML20135A7992 December 1996Press Release III-96-71, Special NRC Team Insp Beginning at Point Beach Nuclear Power Station
ML20134D22317 October 1996Press Release III-96-63, Aerial Radiation Measurements Planned for NPPs in Wisconsin & Minnesota
ML20129F81926 September 1996Rev 0 to SG Replacement Rept
ML20129F84317 September 1996Rev 0 to SG Narrow Range Level Instrument Uncertainty & Setpoint CalculationSafe Shutdown Earthquake
Operating Basis Earthquake
ML20129C08916 September 1996Rev 1 to Determination of Pbnp LTOP Setpoint Through an Inside Surface Fluence of 2.05x10 19m/cm (Appx Jan 2001)
ML20116G51231 July 1996Low & High Pressurizer Pressure Reactor Trip Instrument Uncertainty CalculationBoric Acid
Shutdown Margin
Loop seal
Non-Destructive Examination
Hydrostatic
Operating Basis Earthquake
Fuel cladding
ML20116B15719 July 1996Svc Water Through Wall Flaw EvaluationEarthquake
Through Wall Leak
ML20115H3241 July 1996Rev 1 to Evaluation of SI-860,SI-857 & RC-515/516 Bonnet PressurizationWeak link
ML20116C34729 May 1996Press Release Re Explosion Rocks Nuclear Waste Silo at Point Beach Nuclear Plant
ML20115H3308 February 1996Rev 0 to Verification of Pressure Locking Analysis Program Preslok
ML20058P1757 September 1993Package Consisting of Attachment to Employee Concerns ProgramsBoric Acid
High Radiation Area
Locked High Radiation Area
License Renewal
ML20086Q12116 December 1991Audit Rept A-V-89-02, QA Audit Rept,Teledyne Isotopes Midwest Lab,Northbrook,Il 890208-09
ML20085M61011 November 1991Response to NUMARC Survey Re Waste Mgt,Aquatic Resource & Socioeconomic Questions in Support of NRC License Renewal RulemakingFrazil ice
License Renewal
ML20086U07920 December 1989Pbnp Containment Tendon Prestress Acceptance Limits
ML20245J26923 June 1989Rev 2 to Calculation AC-601R-2-R38, Evaluation of Pipe Support
IA-87-166, Partially Withheld Excerpt from NRC 870713 Operations Ctr Log Re Major Loss of Physical Security Effectiveness at Facility.Door W/O Guard Accessed by Central Alarm Security Sys Operator.Area Checked & No Adverse Consequences Noted18 May 1987Partially Withheld Excerpt from NRC 870713 Operations Ctr Log Re Major Loss of Physical Security Effectiveness at Facility.Door W/O Guard Accessed by Central Alarm Security Sys Operator.Area Checked & No Adverse Consequences Noted
ML20216J08318 May 1987Partially Withheld Excerpt from NRC 870713 Operations Ctr Log Re Major Loss of Physical Security Effectiveness at Facility.Door W/O Guard Accessed by Central Alarm Security Sys Operator.Area Checked & No Adverse Consequences Noted
ML20212Q92217 March 1987Press Release Discussing Proposed $50,000 Fine Against Util for Violations of Security Requirements at Plant
ML20203H28528 July 1986Package of Documents Re Operating Experience W/Westinghouse PWR Steam Generators Through 820131Hydrostatic
IA-86-445, Package of Documents Re Operating Experience W/Westinghouse PWR Steam Generators Through 82013128 July 1986Package of Documents Re Operating Experience W/Westinghouse PWR Steam Generators Through 820131Hydrostatic
ML20135H35319 June 1984Package of Reactor Operator & Senior Reactor Operator License Exam Questions & Answer Keys for Several Facilities, Including Yankee Rowe,Point Beach Units 1 & 2,Fort Calhoun Unit 1 & Calvert Cliffs Units 1 & 2Safe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Post Accident Monitoring
Overtravel
Pressure Boundary Leakage
ML20002E10720 January 1981Press Release Requesting Comment by Persons in Two Creeks, Manitowoc County,Wi Affected by Purchase & Installation of Spare Steam Generators at Facility