Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20084T966 | 26 April 1976 | Telecopy AO BFAO-50-259/763T Re Potential Design Deficiency. Power Supplies to Standby Liquid Control Pumps Locked Out Until Accident Signal Cleared or Normal Voltage Restored to Shutdown Boards | |
ML20084T969 | 23 January 1976 | AOs BFAO-50-259/761W & BFAO-50-260/762W:on 760114,diesel Generator D Failed Monthly Surveillance Test.Caused by Failure of Hydraulic Actuator to Respond Properly to Signals from Electrical Governor | |
ML20084T975 | 15 January 1976 | Telecopies AO BFAO-50-259/761T & BFRO-50-260/762T:on 760114, Diesel Generator D Failed Monthly Surveillance Test.Caused by Mechanical Governor Problems | |
ML20085E938 | 10 October 1975 | AO BFAO-50-259/75-10W:on 751001,diesel Generator Power Supply Unavailable Automatically to RHRSW Pump Running Continuously to Supply Water.Caused by Commencement of Mod Second Phase Prior to Completion of First Phase | |
ML20085E963 | 18 July 1975 | AO BFAO-50-260/759W:on 750322,during Second Stage Relief Valve Testing & Refurbishing,Piston & Stem Locknut Found Loose in Air Actuator Chamber on Valve 2 PCV-1-31.Stem & Nut Drilled Twice.New second-stage Stem Installed | |
ML20085E955 | 9 July 1975 | AO BFAO-50-260/759T:on 750709,broken Stem Found on second- Stage Pilot of Main Steam Release Valve 1.Break Point Just Under Lock Nut Above Actuating Piston.Site Inspector Advised | |
ML20085E985 | 30 May 1975 | AO BFAO-50-260/757W:manual Valve in Drive Water Supply on Control Rod Drive Module 50-15 Found in Open Position.Cause Unknown.Valve Repositioned to Required Closed Position | |
ML20085E978 | 30 May 1975 | AO BFAO-50-259/758W:on 750521,diesel Generator a Failed to Start During Routine Surveillance Test.Caused by Rust & Grit in Starters Due to Moisture in Air Sys & Inadequate Lubricator Operation.Airline Strainers Cleaned | |
ML20085E976 | 28 May 1975 | Telecopy Message of AO BFAO-50-259/759T:on 750527,signal Cable Inadvertently Disconnected,Making a & B Source Range Monitors Unavailable.Cables Reconnected & Function Restored | |
ML20085E982 | 22 May 1975 | Telecopy Message of AO BFAO-50-259/758T:on 750521,diesel Generator a Failed to Start During Routine Surveillance Test.Air Motors Changed & Testing Accomplished | |
ML20085E996 | 21 May 1975 | Telecopy Message of AO BFAO-50-260/757T:on 750520,A Drive Water Supply Valve to Control Rod Drive Found Opened During Surveillance Instruction Performance | |
ML20085F024 | 25 April 1975 | AO BFAO-50-259/757W:on 750416,LPCI Injection Valve FCV-74-52 Became Inoperable Electrically.Caused by Bolt Fatigue Failure Due to Vibration,Resulting from Loose Bolts Securing Drive Motor to Valve.Spare Motor Installed | |
ML20085F030 | 17 April 1975 | Telecopy Message of AO BFAO-50-259/757T:on 750416,drive Motor Support Bolts Sheared Off LPCI Injection Valve FCV-74-52,making Valve Inoperable Electrically | |
ML20085F022 | 27 March 1975 | AO BFAO-50-259/755W:on 750318,one Less Senior Reactor Operator Was on Shift than Required Per Tech Spec.Caused by Scheduling Error.Weekly Shift Schedule Revised to Indicate Licenses Held by Personnel | |
ML20085F678 | 20 March 1975 | AO 50-259/754W:on 750310,while Running Routine Surveillance Test,High Concentrations of Oxygen Discovered in Drywell. Caused by Mixing of Air Retained in Stagnant Areas of Drywell During Initial Purge & Sampling | |
ML20085F741 | 7 March 1975 | AO BFAO-50-259/753W:on 750226,main Steam Relief Valve PCV-1-4 Lifted Prematurely & Did Not Reseat Until Reactor Pressure Reached 480 Psig.Cause Unknown.Leakage Suspected. Valves Replaced | |
ML20085G005 | 3 March 1975 | AO BFAO-50-260/756W:on 750221,120-volt Power Supply to RCIC Flow Controller & Suppression Pool Level & Drywell Pressure Indicators Lost.Caused by Mispositioning of 120-volt Selector Switch XS-57-170 to Off Position | |
ML20085G668 | 19 February 1975 | Followup Rept of AO BFAO-50-260/7432W:on 741204,shutdown Cooling Flow Control Valve FCV-74-66 Failed to Allow Waterflow Passage.Caused by Broken Tack Welds.Welds Ground Off & Large Fillet Welds Rewelded | |
ML20085F042 | 15 February 1975 | AO BFAO-50-259/752W:on 750205,crack Found in 3/4-inch Carbon Steel Test Line on Core Spray Loop II Fullflow Pump Test Loop.Caused by Metal Fatigue Due to Test Connection Line Vibration.Crack Ground Out & Repaired by Welding | |
ML20085G046 | 14 February 1975 | AO BFAO-50-260/755W:on 750205,4-kv Shutdown Board D Emergency Control Bus 250-volt Dc Power Supply Lost.Caused by Inadequate Battery Discharge Surveillance Instruction. Changed Instruction Includes Transferance Step | |
ML20085G227 | 10 February 1975 | AO BFAO-50-259/751W:on 750131,time for RHRSW Pump D1 Start Sequence Time Delay Relay TD1-D Improperly Set.Caused by Inadvertent Moving of Timer Dial Setting Since Previous Surveillance Test.Relay Recalibr | |
ML20085F038 | 7 February 1975 | Telecopy Message of AO BFAO-50-259/752T:on 750205,small Leak Discovered in 3/4-inch Carbon Steel Test Connection Outside Containment Boundary During Functional Test of Core Spray Piping Loop 2 | |
ML20085F036 | 5 February 1975 | Telecopy Message of AO BFAO-50-260/755T:on 750205,D Diesel Generator Undervoltage Start RHR Svc Water Pump D1,RHR Pumps 1D & 2D & Core Spray Pumps 1D & 2D Auto Start Feature Found Inoperable for 39 H During Battery Capacity Discharge Test | |
ML20085F037 | 31 January 1975 | AO BFAO-50-260/754W:on 750123,four Bergen-Paterson Arrestors Found W/Unacceptable Low Amount of Oil Present During Shock Arrestor Insp.Caused by Small Nick in Sealing Surface of Accumulator Piston Seal.Recommended Seals & O-rings Used | |
ML20085G085 | 29 January 1975 | AO BFAO-50-26/753W:on 750119,relief Valve PCV-1-4 Operated Spuriously Several Times.Caused by second-stage & pilot- Stage Leakage Due to Indentation in Seat & Disc.Relief Valve Replaced | |
ML20085F035 | 25 January 1975 | Telecopy Message of AO BFAO-50-260/754T:on 750123,insp Revealed That Four Bergen-Paterson Arrestors Had Lost Hydraulic Oil & Ability to Function | |
ML20085G097 | 24 January 1975 | AO BFAO-50-260/752W:on 750116,RCIC Turbine Tripped.Caused by Misposition of Mechanical Overspeed Emergency Tappet Nut. Nut Rotated for Proper Alignment W/Emergency Head Lever | |
ML20085G956 | 17 January 1975 | Updated AO BFAO-50-259/7453W Re Loss of Position Indication on Suppression Chamber to Drywell Vacuum Breakers.Electrical Checks in Torus Suppression Chamber Showed Grounded Conductors in Inside Torus Penetration Connector | |
ML20085G113 | 17 January 1975 | AO BFAO-50-260/751W:on 750107,RCIC Failed to Operate After Planned Turbine Trip.Caused by Electronic Overspeed Trip Due to Dropping Resistor Open Circuiting in Resistor Box. Resistor Replaced & Voltage Verified | |
ML20085G596 | 6 January 1975 | AO BFAO-50-259/7461W:on 741227,dampening Pins in Main Steam Line high-flow Pressure Switch Snubbers Installed W/O Proper Review & Authorization.Caused by Personnel Error. Procedures Revised | |
ML20085G607 | 3 January 1975 | AO BFAO-50-259/7460W:on 741224,offgas Radiation Monitor Found Inoperable.Caused by Abnormal Leakage of Local Offgas Sample Flow Rotometer Due to Failure of O-ring to Seal properly.O-ring Reassembled | |
ML20085G161 | 27 December 1974 | AO BFAO-50-260/7436W:on 741218,drywell Sampling Monitor Found 2-RM-90-256 Inoperable.Caused by Failure of Four 150- Watt Bulbs Used for Heating Monitor Internals.Permanent Heating Sys in Drywell Requested | |
ML20085G239 | 27 December 1974 | AO BFAO/50-260/7435W:on 741218,flow Control Valve 2-FCV-74-66 on RHR Sys Loop II Failed to Open.Caused by Loose Locknut Due to Missing Set Screws in Yoke Nut Bearing Locknut.Spare Motor Operator Installed | |
ML20085G640 | 23 December 1974 | AO BFAO-50-259/7459W:on 741213,secondary Containment Isolation Damper Solenoid Valves Failed.Caused by Sticking Pilot Valves.Solenoid Valves Replaced | |
ML20085G731 | 20 December 1974 | Addl Info Re AO BFAO-50-260/7425W.Inlet & Outlet Valves for Two of Three Cylinders Found in Satisfactory Condition. Remaining Cylinder Badly Pitted.Valves Refaced & Lapped in | |
ML20085G430 | 18 December 1974 | AO BFAO-50-260/7434W:on 741208,leak Indications Found on Main Steam Relief Valve Bellows 2-PCV-1-41 & 2-PCV-1-5. Caused by Shorted Cable Due to Melted Cable Insulation. Caused Repaired | |
ML20085G406 | 13 December 1974 | AO BFAO-50-260/7431W:on 741203,HPCI Automatically Initiated Due to Low Reactor Water Level.Cause Not Determined. Corrective Actions Under Investigation | |
ML20085G661 | 13 December 1974 | AO BFAO-50-260/7432W:on 741204,shutdown Cooling Flow Control Valve FCV-74-66 Failed to Allow Waterflow Passage.Caused by Loosened Valve Disc.Valve Repaired | |
ML20085G261 | 12 December 1974 | AO BFEAO-7422W:on 741202,water Temps in Wheeler Reservoir Not Recorded.Caused by Failure in Computer Controlling of Data Collection.Standby Computer Spare Memory Board Interchanged W/Existing Memory Board | |
ML20085G708 | 6 December 1974 | AO BFAO-50-259/7458W:on 741126,main Stack Gas Radiation Monitoring Sys Found Inoperable.Caused by Excess Water in Sys Due to Isolation Valve Leakage from Demineralized Water Back Flushing Connection | Grab sample |
ML20085G266 | 4 December 1974 | AO BFAO-50-260/7429W:on 741124,main Steam Relief Valve FCV-1-31 Failed to Reset Properly After Manually Opened. Caused by Excessive Pilot Valve Leakage.Valve Replaced. Installation Monitored | |
ML20085G126 | 29 November 1974 | AO BFAO-50-260/7427W:on 741121,core Spray Injection Valve 2-FCV-75-53 Failed to Open.Caused by Jammed Valve Due to Misadjustment of Closing Limit Switch on Valve Operator. Opening & Closing Limit Switches Adjusted | |
ML20085G819 | 25 November 1974 | AO BFAO-50-259/7456W:on 741115,RCIC Tripped on Overspeed During Auto Initiation.Caused by Servo Out of Alignment W/Governor Level.Servo Adjusted | |
ML20085G757 | 14 November 1974 | AO BFAO-50-260/7424W:on 741104,HPCI Sys Inoperable Due to Blown Head Gaskets on Gland Steam Condenser & Flooding of Gland Steam Condenser Hotwell Pump Motor.Cause Unknown. Upper & Lower Condenser Head Gaskets Replaced | |
ML20085G836 | 7 November 1974 | AO BFAO-50-260/7422W:on 741030,rod Sequence Control Sys Operability Not Verified Before Decrease Below 20% Power. Caused by Recirculation Pumps Run Back Due to Low Feedwater Flow Switch Actuating Prematurely | |
ML20085G843 | 7 November 1974 | AO BFAO-50-259/7455W:on 741031,max Linear Heat Generation Rate Calculated Higher than Allowable Limit.Caused by Inadequate Margin Allowed in Max Linear Heat Generation Before TIP Set | |
ML20085G835 | 1 November 1974 | AO BFAO-50-260/7423W:on 741101,main Steam Line B Outboard Isolation Valve FCV 1-27 Failed to Close within Required Time.Cause Unknown.Steam Line Isolated & Normal Shutdown Operations Continued | |
ML20085G861 | 25 October 1974 | AO BFAO-50-260/7420W:on 741017,during Planned Insp of Hydraulic Piping restraints,Bergen-Paterson Hydraulic Shock & Sway Arrestors Found W/Unacceptably Low Oil Levels.Caused by Seal Nicks Due to Burrs on Piston Rod End | |
ML20085G889 | 25 October 1974 | AO BFAO-50-260/7419W:on 741015,2-inch Schedule 80 Stainless Steel Equalizing Line Appurtenant to 22-inch Crosstie Piping Between Two Reactor Coolant Recirculation Pump Loops Suffered Fatigue Failure.Caused by Excessive Vibration | |
ML20085G860 | 25 October 1974 | AO BFAO-50-260/7421W:on 741017,two Offgas HEPA Filters Not Installed Before Startup,Contrary to Section 9.4 of Fsar. Caused by Personnel Error.Filter Sample Lines Blown Out W/Station Air.New Filters Installed |